Bloch Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2010 to Feb 2021
- Last 24 months
- 0 permits filed
38 permits since 2000: 31 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2021 | Completed final sign-off May 2021 | 1895 Pacific Av | kitchen remodel; add plumbing adjacent to kitchen for washing machine and electrica ventless dryer. no change to walls and openings layout.Details
kitchen remodel; add plumbing adjacent to kitchen for washing machine and electrica ventless dryer. no change to walls and openings layout. | $40,000 |
| Dec 4, 2017 | Completed final sign-off Feb 2019 | 1571 Waller St | comply with nov 201774992-replace (e) damaged structural flr assembly @ 4th fl bathrm. replace (e) jacuzzi tub with new soaking tub (logan 7238 metro). repair damaged dry wall in 4th fl bedrm, dining rm, hallway and soaking tub room. repair/replace plumbing supply/drain/waste lines, from 4th fl bathDetails
comply with nov 201774992-replace (e) damaged structural flr assembly @ 4th fl bathrm. replace (e) jacuzzi tub with new soaking tub (logan 7238 metro). repair damaged dry wall in 4th fl bedrm, dining rm, hallway and soaking tub room. repair/replace plumbing supply/drain/waste lines, from 4th fl bath | $20,000 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 1571 Waller St | partial demo to remove approx 400 sq. ft. of plaster to determine where plumbing vents are located & gain access to structural engineer for tub support.Details
partial demo to remove approx 400 sq. ft. of plaster to determine where plumbing vents are located & gain access to structural engineer for tub support. | $1,000 |
| Sep 15, 2017 | Completed final sign-off Apr 2018 | 2121 Newcomb Av | this is an addendum to pa# 201606109708 & 201704254875, this is a change of use to commercial kitchen cooking for candy and baking . n/a maher ordinanceDetails
this is an addendum to pa# 201606109708 & 201704254875, this is a change of use to commercial kitchen cooking for candy and baking . n/a maher ordinance | |
| Aug 9, 2017 | Completed final sign-off Nov 2018 | 447 23rd Av | comply w/nov #201772611. gut unit #3 & repair blindwall. replace kitchen & bathroom in kind. unit #4, replace entry door. unit #1 gut to studs and repair. replace kitchen & 2 baths in kind. at garage remove & replace drywall. remove & replace siding with hardy plank along south property wall.Details
comply w/nov #201772611. gut unit #3 & repair blindwall. replace kitchen & bathroom in kind. unit #4, replace entry door. unit #1 gut to studs and repair. replace kitchen & 2 baths in kind. at garage remove & replace drywall. remove & replace siding with hardy plank along south property wall. | $100,000 |
| Jul 14, 2017 | Completed final sign-off Nov 2017 | 1600 Webster St | #408 - kitchen & bath remodelDetails
#408 - kitchen & bath remodel | $20,000 |
| Apr 25, 2017 | Completed final sign-off Apr 2018 | 2121 Newcomb Av | revision to app#201606109708. add 2nd restroom. new partition layout at mezzanine. n/a for maher.Details
revision to app#201606109708. add 2nd restroom. new partition layout at mezzanine. n/a for maher. | |
| Mar 2, 2017 | Completed final sign-off Nov 2018 | 350 15th Av | horizontal addition. add a rear yard addition to include an alcove at 1st floor and a master suite at 2nd floor.Details
horizontal addition. add a rear yard addition to include an alcove at 1st floor and a master suite at 2nd floor. | $88,000 |
| Jun 10, 2016 | Completed final sign-off Apr 2018 | 2121 Newcomb Av | g/f: construction new restroom, loading area and mezzanine in (e) tenant space. maher na. mep/alarm/sprinkler deferred.Details
g/f: construction new restroom, loading area and mezzanine in (e) tenant space. maher na. mep/alarm/sprinkler deferred. | $50,000 |
| Feb 22, 2016 | Completed final sign-off Dec 2016 | 1508 Mcallister St | revision to pa#201602028549 install cmu walls and reset existing steps, replacement in kind.Details
revision to pa#201602028549 install cmu walls and reset existing steps, replacement in kind. | $21,600 |
| Feb 2, 2016 | Completed final sign-off Dec 2016 | 1508 Mcallister St | revision to pa 2015-1029-1095, replace foundation at front entry stairDetails
revision to pa 2015-1029-1095, replace foundation at front entry stair | $6,000 |
| Jan 27, 2016 | Completed final sign-off Dec 2016 | 1508 Mcallister St | to comply with complaint 201554341: remove (e) deck and stairs. remove (e) windows and doors where they conflict with new work. construct new wood stair in (e) rear yard with 3/4hour rated 36" min doors- not visible from the streetDetails
to comply with complaint 201554341: remove (e) deck and stairs. remove (e) windows and doors where they conflict with new work. construct new wood stair in (e) rear yard with 3/4hour rated 36" min doors- not visible from the street | $15,000 |
| Jan 26, 2016 | Completed final sign-off Dec 2016 | 1508 Mcallister St | remove & replace rear yard retaining wall.Details
remove & replace rear yard retaining wall. | $60,000 |
| Oct 29, 2015 | Completed final sign-off Dec 2016 | 1508 Mcallister St | soft story upgrade of 1st floor per ab106 & ab107. soft story retrofit per sfbc chapoter 34b engineering criteria, other rational design - shearwallsDetails
soft story upgrade of 1st floor per ab106 & ab107. soft story retrofit per sfbc chapoter 34b engineering criteria, other rational design - shearwalls | $50,000 |
| Jul 9, 2015 | Completed final sign-off Dec 2016 | 1508 Mcallister St | comply with nov 201523791. revision to app# 201502097803. repair rear roof area 25ft x 18ft. repair kitchens in 4 units & bathroom fixtures in units 5 & 6, patch ceiling at 2nd floor, replace entire ceiling at 3rd floor.Details
comply with nov 201523791. revision to app# 201502097803. repair rear roof area 25ft x 18ft. repair kitchens in 4 units & bathroom fixtures in units 5 & 6, patch ceiling at 2nd floor, replace entire ceiling at 3rd floor. | $200,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2018 | 517 Bartlett St | comply w/nov 201539691. fire damage repair. repair rear area of roof 25'x18'. replace bathroom fixtures in 2 units (2nd and 3rd floor) replace wall and ceiling finishes entirely 3 floors. repair elect. mech & plumbing under separate permit.Details
comply w/nov 201539691. fire damage repair. repair rear area of roof 25'x18'. replace bathroom fixtures in 2 units (2nd and 3rd floor) replace wall and ceiling finishes entirely 3 floors. repair elect. mech & plumbing under separate permit. | $320,000 |
| Apr 6, 2015 | Never finaled issued Apr 2015, no final | 1442 Valencia St | street spaceDetails
street space | |
| Dec 12, 2014 | Completed final sign-off Apr 2015 | 1442 Valencia St | revised cost of pa #2014.0917.6612 to include 3 kitchens remodel & 3 baths per building spectoras noted on job card dated 12/5/14.Details
revised cost of pa #2014.0917.6612 to include 3 kitchens remodel & 3 baths per building spectoras noted on job card dated 12/5/14. | $60,000 |
| Oct 8, 2014 | Completed final sign-off Oct 2014 | 1837 Jefferson St | to obtain final inspection for work approved under pa #2010.0831.9960. all work is complete.Details
to obtain final inspection for work approved under pa #2010.0831.9960. all work is complete. | |
| Sep 17, 2014 | Completed final sign-off Apr 2015 | 1442 Valencia St | 1)repair and replace extg roof beam due to fire damage. 2)remodel extg fire place with chimney. revision to app# 201402198804. to comply with nov #201334061.Details
1)repair and replace extg roof beam due to fire damage. 2)remodel extg fire place with chimney. revision to app# 201402198804. to comply with nov #201334061. | $10,000 |
| Feb 19, 2014 | Completed final sign-off Apr 2015 | 1442 Valencia St | comply with violation 201334061. repair fire damage drywall and wood studs if needed at 2nd and 3rd fl. repair electrical and mechanical at 3rd fl. all work in kind.Details
comply with violation 201334061. repair fire damage drywall and wood studs if needed at 2nd and 3rd fl. repair electrical and mechanical at 3rd fl. all work in kind. | $20,000 |
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 345 West Portal Av | water damage repair. replace gyp bd walls and part of ceiling board in 2 rooms 1st floor unit 130. rplace gyp brd on walls and replace dropped ceiling in room 2nd floor unit #200. install accessible hand rails on rear east egress stair.Details
water damage repair. replace gyp bd walls and part of ceiling board in 2 rooms 1st floor unit 130. rplace gyp brd on walls and replace dropped ceiling in room 2nd floor unit #200. install accessible hand rails on rear east egress stair. | $5,000 |
| Sep 25, 2013 | Never finaled issued Sep 2013, no final | 557 27th St | switch toilet and shower locations, change vanities, flooring in existing bathroom, lighting shall comply with t-24Details
switch toilet and shower locations, change vanities, flooring in existing bathroom, lighting shall comply with t-24 | $8,000 |
| Jul 25, 2013 | Expired or cancelled cancelled Oct 2013 | 345 West Portal Av | comply with nov 201388114. replace all exterior decorative metal fence and gates with new landscaping area in front of building. portion of fence and gate damaged by car accident. add handrails at each side of front entrance steps.Details
comply with nov 201388114. replace all exterior decorative metal fence and gates with new landscaping area in front of building. portion of fence and gate damaged by car accident. add handrails at each side of front entrance steps. | $10,000 |
| May 29, 2013 | Completed final sign-off Jul 2014 | 763 Capp St | comply to nov #201383102. fire damage repair in kind. replace rear roof area, 25 ft by 40 ft. replace rear wall 3rd floor to roof. replace gyp bd wall and ceiling, 3rd floor and rear of 2nd floor. replace bathroom and kitchen fixture. install insulation replace 41 windows. front window to be wooden.Details
comply to nov #201383102. fire damage repair in kind. replace rear roof area, 25 ft by 40 ft. replace rear wall 3rd floor to roof. replace gyp bd wall and ceiling, 3rd floor and rear of 2nd floor. replace bathroom and kitchen fixture. install insulation replace 41 windows. front window to be wooden. | $300,000 |
| Mar 15, 2013 | Completed final sign-off Apr 2013 | 345 West Portal Av | to comply with nov # 201388114, vehicle impact damage repair. install temp support, repair front wall framing & siding, partially upgrade bathroom. plumbing, electrical, mech under separate permit.Details
to comply with nov # 201388114, vehicle impact damage repair. install temp support, repair front wall framing & siding, partially upgrade bathroom. plumbing, electrical, mech under separate permit. | $18,000 |
| Jun 11, 2012 | Completed final sign-off Dec 2019 | 230 11th St | repair fire, smoke&wtr damage throughout(new finishes, casework). excavate bsmt for 2 new apts&service rooms. remodel existing apt flr 1-3(new kitchens,baths,utility). add 4th flr w/ 2 new apts. add roof terrace. remodel 2 existing exit stairs.Details
repair fire, smoke&wtr damage throughout(new finishes, casework). excavate bsmt for 2 new apts&service rooms. remodel existing apt flr 1-3(new kitchens,baths,utility). add 4th flr w/ 2 new apts. add roof terrace. remodel 2 existing exit stairs. | $250,000 |
| Aug 15, 2011 | Completed final sign-off Sep 2011 | 168 21st Av | per lingruen wood destroying pest inspection report dated 8/10/11 items 1a,1b, 3a,5a, 5b,5c, 5e. report #57933 (termite report)Details
per lingruen wood destroying pest inspection report dated 8/10/11 items 1a,1b, 3a,5a, 5b,5c, 5e. report #57933 (termite report) | $5,000 |
| Aug 3, 2011 | Expired or cancelled expired Jan 2019 | 2853 Broderick St | to comply w/ nov 201003592 & 20105414. replace 26'x38' 1/flr framing, repl intr wall finish entire(2 units).replace bathrm & kitchens-2units.repl elect&mech(separate permit).intr altern post fire damages.add new bedrm&bath at grd/flr).install new insuln,sheetrock,sprinkler&kitchen&bath fix&cabinet.Details
to comply w/ nov 201003592 & 20105414. replace 26'x38' 1/flr framing, repl intr wall finish entire(2 units).replace bathrm & kitchens-2units.repl elect&mech(separate permit).intr altern post fire damages.add new bedrm&bath at grd/flr).install new insuln,sheetrock,sprinkler&kitchen&bath fix&cabinet. | $320,000 |
| Jul 29, 2011 | Completed final sign-off Feb 2012 | 2040 Golden Gate Av | revision to application #2011-0404-3425 per correction notice dated 6/13/2011 replace 1st floor sheathing, install foundation bolts, install temp shoring, replace 2nd floor beam.Details
revision to application #2011-0404-3425 per correction notice dated 6/13/2011 replace 1st floor sheathing, install foundation bolts, install temp shoring, replace 2nd floor beam. | $12,000 |
| Apr 18, 2011 | Completed final sign-off Nov 2012 | 2550 California St | revision to pa# 2010/10/14/3012 (fire damage repair & remodel) provide accessibility to 1st floor office/retail. replace kitchens & baths-5 residential units-finish interiors. seismic upgrades to base bldg. replace damage windows in kind (wood). mech, ele & plumbing work under separate permits.Details
revision to pa# 2010/10/14/3012 (fire damage repair & remodel) provide accessibility to 1st floor office/retail. replace kitchens & baths-5 residential units-finish interiors. seismic upgrades to base bldg. replace damage windows in kind (wood). mech, ele & plumbing work under separate permits. | $400,000 |
| Apr 4, 2011 | Completed final sign-off Feb 2012 | 2040 Golden Gate Av | fire repair: remove all wall coverings, replace kitchen cabinets & fixtures. replace bath fixtures, replace gas heater, all 5/8" drywall, 2 front windows with wood sash, 5 vinyl windows @ sides & gas test.Details
fire repair: remove all wall coverings, replace kitchen cabinets & fixtures. replace bath fixtures, replace gas heater, all 5/8" drywall, 2 front windows with wood sash, 5 vinyl windows @ sides & gas test. | $75,000 |
| Nov 18, 2010 | Completed final sign-off Mar 2011 | 2659 Post St | 1st floor infill, 12' x 11'. relocate washer dryerDetails
1st floor infill, 12' x 11'. relocate washer dryer | $28,000 |
| Oct 14, 2010 | Completed final sign-off Sep 2011 | 2554 California St | to comply w/nov #20107069 & 201061152 fire damage, repair 40 ft length of wall 3rd floor to roof at left property line.Details
to comply w/nov #20107069 & 201061152 fire damage, repair 40 ft length of wall 3rd floor to roof at left property line. | $10,000 |
| Aug 31, 2010 | Never finaled issued Dec 2010, no final | 1837 Jefferson St | to comply with nov# 201052699 and 200929185. fire damage repair. remodel 3 units, kitchnes and baths and wall removal. new laundry in ea.unit, (n) skylights. replace in-kind front and rear windows. replace light courtstair 1st to 3rd fl.Details
to comply with nov# 201052699 and 200929185. fire damage repair. remodel 3 units, kitchnes and baths and wall removal. new laundry in ea.unit, (n) skylights. replace in-kind front and rear windows. replace light courtstair 1st to 3rd fl. | $600,000 |
| Jul 16, 2010 | Completed final sign-off Mar 2011 | 2659 Post St | revision to appl #201004271135: replace garage floor slab, cap garage footings, relcoate bedroom wall. add two openings in central wall @ 2nd floor. remove wood burning fire place. replace front & rear stairs in like kind. revise frame #1 to a two-level moment frame.Details
revision to appl #201004271135: replace garage floor slab, cap garage footings, relcoate bedroom wall. add two openings in central wall @ 2nd floor. remove wood burning fire place. replace front & rear stairs in like kind. revise frame #1 to a two-level moment frame. | $25,000 |
| Jul 16, 2010 | Completed final sign-off Sep 2010 | 168 21st Av | per housing inspection report cc 5774 of 4/09/10. patch ceilings of garage, install new section of handrail at upper section of front interior stairs. provide vacuum brakers at all hose fittings as req'd. electrical work covered in elec.permitDetails
per housing inspection report cc 5774 of 4/09/10. patch ceilings of garage, install new section of handrail at upper section of front interior stairs. provide vacuum brakers at all hose fittings as req'd. electrical work covered in elec.permit | $2,500 |
| Apr 27, 2010 | Completed final sign-off Mar 2011 | 2659 Post St | fire damage repair. replace right side wall at 1st and 2nd fl, 21' x 8'. replace 12'x20' 2nd fl framing. replace kitch and bath fixtures. replace gyp bd walls and clgs. install insulation. repair mech and elec systems under separate permits. install steel frames, strong walls,bolts,holdowns n plywdDetails
fire damage repair. replace right side wall at 1st and 2nd fl, 21' x 8'. replace 12'x20' 2nd fl framing. replace kitch and bath fixtures. replace gyp bd walls and clgs. install insulation. repair mech and elec systems under separate permits. install steel frames, strong walls,bolts,holdowns n plywd | $200,000 |