Back to kitchen remodel contractors
Bloch Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2010 to Feb 2021
- Last 24 months
- 0 permits filed
38 permits since 2000: 31 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 expired or cancelled. Typically 35 days from filing to permit and 303 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2021 | Completed final sign-off May 2021 | 1895 Pacific Av | kitchen remodel; add plumbing adjacent to kitchen for washing machine and electrica ventless dryer. no change to walls and openings layout.Details
kitchen remodel; add plumbing adjacent to kitchen for washing machine and electrica ventless dryer. no change to walls and openings layout. | $40,000 |
| Sep 15, 2017 | Completed final sign-off Apr 2018 | 2121 Newcomb Av | this is an addendum to pa# 201606109708 & 201704254875, this is a change of use to commercial kitchen cooking for candy and baking . n/a maher ordinanceDetails
this is an addendum to pa# 201606109708 & 201704254875, this is a change of use to commercial kitchen cooking for candy and baking . n/a maher ordinance | |
| Aug 9, 2017 | Completed final sign-off Nov 2018 | 447 23rd Av | comply w/nov #201772611. gut unit #3 & repair blindwall. replace kitchen & bathroom in kind. unit #4, replace entry door. unit #1 gut to studs and repair. replace kitchen & 2 baths in kind. at garage remove & replace drywall. remove & replace siding with hardy plank along south property wall.Details
comply w/nov #201772611. gut unit #3 & repair blindwall. replace kitchen & bathroom in kind. unit #4, replace entry door. unit #1 gut to studs and repair. replace kitchen & 2 baths in kind. at garage remove & replace drywall. remove & replace siding with hardy plank along south property wall. | $100,000 |
| Jul 14, 2017 | Completed final sign-off Nov 2017 | 1600 Webster St | #408 - kitchen & bath remodelDetails
#408 - kitchen & bath remodel | $20,000 |
| Jul 9, 2015 | Completed final sign-off Dec 2016 | 1508 Mcallister St | comply with nov 201523791. revision to app# 201502097803. repair rear roof area 25ft x 18ft. repair kitchens in 4 units & bathroom fixtures in units 5 & 6, patch ceiling at 2nd floor, replace entire ceiling at 3rd floor.Details
comply with nov 201523791. revision to app# 201502097803. repair rear roof area 25ft x 18ft. repair kitchens in 4 units & bathroom fixtures in units 5 & 6, patch ceiling at 2nd floor, replace entire ceiling at 3rd floor. | $200,000 |
| Dec 12, 2014 | Completed final sign-off Apr 2015 | 1442 Valencia St | revised cost of pa #2014.0917.6612 to include 3 kitchens remodel & 3 baths per building spectoras noted on job card dated 12/5/14.Details
revised cost of pa #2014.0917.6612 to include 3 kitchens remodel & 3 baths per building spectoras noted on job card dated 12/5/14. | $60,000 |
| May 29, 2013 | Completed final sign-off Jul 2014 | 763 Capp St | comply to nov #201383102. fire damage repair in kind. replace rear roof area, 25 ft by 40 ft. replace rear wall 3rd floor to roof. replace gyp bd wall and ceiling, 3rd floor and rear of 2nd floor. replace bathroom and kitchen fixture. install insulation replace 41 windows. front window to be wooden.Details
comply to nov #201383102. fire damage repair in kind. replace rear roof area, 25 ft by 40 ft. replace rear wall 3rd floor to roof. replace gyp bd wall and ceiling, 3rd floor and rear of 2nd floor. replace bathroom and kitchen fixture. install insulation replace 41 windows. front window to be wooden. | $300,000 |
| Jun 11, 2012 | Completed final sign-off Dec 2019 | 230 11th St | repair fire, smoke&wtr damage throughout(new finishes, casework). excavate bsmt for 2 new apts&service rooms. remodel existing apt flr 1-3(new kitchens,baths,utility). add 4th flr w/ 2 new apts. add roof terrace. remodel 2 existing exit stairs.Details
repair fire, smoke&wtr damage throughout(new finishes, casework). excavate bsmt for 2 new apts&service rooms. remodel existing apt flr 1-3(new kitchens,baths,utility). add 4th flr w/ 2 new apts. add roof terrace. remodel 2 existing exit stairs. | $250,000 |
| Aug 3, 2011 | Expired or cancelled expired Jan 2019 | 2853 Broderick St | to comply w/ nov 201003592 & 20105414. replace 26'x38' 1/flr framing, repl intr wall finish entire(2 units).replace bathrm & kitchens-2units.repl elect&mech(separate permit).intr altern post fire damages.add new bedrm&bath at grd/flr).install new insuln,sheetrock,sprinkler&kitchen&bath fix&cabinet.Details
to comply w/ nov 201003592 & 20105414. replace 26'x38' 1/flr framing, repl intr wall finish entire(2 units).replace bathrm & kitchens-2units.repl elect&mech(separate permit).intr altern post fire damages.add new bedrm&bath at grd/flr).install new insuln,sheetrock,sprinkler&kitchen&bath fix&cabinet. | $320,000 |
| Apr 18, 2011 | Completed final sign-off Nov 2012 | 2550 California St | revision to pa# 2010/10/14/3012 (fire damage repair & remodel) provide accessibility to 1st floor office/retail. replace kitchens & baths-5 residential units-finish interiors. seismic upgrades to base bldg. replace damage windows in kind (wood). mech, ele & plumbing work under separate permits.Details
revision to pa# 2010/10/14/3012 (fire damage repair & remodel) provide accessibility to 1st floor office/retail. replace kitchens & baths-5 residential units-finish interiors. seismic upgrades to base bldg. replace damage windows in kind (wood). mech, ele & plumbing work under separate permits. | $400,000 |
| Apr 4, 2011 | Completed final sign-off Feb 2012 | 2040 Golden Gate Av | fire repair: remove all wall coverings, replace kitchen cabinets & fixtures. replace bath fixtures, replace gas heater, all 5/8" drywall, 2 front windows with wood sash, 5 vinyl windows @ sides & gas test.Details
fire repair: remove all wall coverings, replace kitchen cabinets & fixtures. replace bath fixtures, replace gas heater, all 5/8" drywall, 2 front windows with wood sash, 5 vinyl windows @ sides & gas test. | $75,000 |