Block 0253, lot 007
1026 Pine St
- City’s use
- Commercial Hotel
- Built
- 1904
- Stories
- 4
- Building
- 6,480 sq ft
- Lot
- 1,873 sq ft
- Zoning
- RM4
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 4, 2024 | In progress issued Jun 2024 | 1026 Pine St | Sure, Inc. | int. remodel: unit #1026 remodel 1 kit.& 1 bath. create 1 (n) bath & 1 bedroom. unit #1028 kit. renovation. remodel 2 toilet rooms, (1) 1/2 bath. (1) (n) shower room. unit #1030: remodel (1) kit, (3) toilet rms, (1) shower rm, (1) 1/2 bath, (2) (n) shower rm, one (n) toilet rm. elec upgradeDetails
int. remodel: unit #1026 remodel 1 kit.& 1 bath. create 1 (n) bath & 1 bedroom. unit #1028 kit. renovation. remodel 2 toilet rooms, (1) 1/2 bath. (1) (n) shower room. unit #1030: remodel (1) kit, (3) toilet rms, (1) shower rm, (1) 1/2 bath, (2) (n) shower rm, one (n) toilet rm. elec upgrade | $100,000 |
| Apr 4, 2024 | Completed final sign-off Dec 2024 | 1026 Pine St | Crime Watch Security Sys Llc | upgrade extg fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade extg fire alarm system to comply with sffc section 1103.7.6.1 | $43,080 |
| Mar 19, 2024 | Completed final sign-off Nov 2024 | 1026 Pine St | Project Contractor Inc | modify sprinkler system to h idden all pipe to ceiling at unit 1026 pine st according to revnovations app 202309277510. total 16 sprinkler headsDetails
modify sprinkler system to h idden all pipe to ceiling at unit 1026 pine st according to revnovations app 202309277510. total 16 sprinkler heads | $9,600 |
| Mar 15, 2024 | Completed final sign-off Dec 2024 | 1026 Pine St | Sure, Inc. | replace plaster w/ drywall in the unit. main scope of work is under 202309277510.Details
replace plaster w/ drywall in the unit. main scope of work is under 202309277510. | $8,000 |
| Mar 12, 2024 | In progress issued Mar 2024 | 1028 Pine St | Sure, Inc. | three 100 sf kitchen and three 60 sf bathroom remodel. no change to layout. update wiring and new fixtures. new subpanel in the unit. these kitchen and bathroom are the community kitchen and bathroom.Details
three 100 sf kitchen and three 60 sf bathroom remodel. no change to layout. update wiring and new fixtures. new subpanel in the unit. these kitchen and bathroom are the community kitchen and bathroom. | $50,000 |
| Sep 27, 2023 | Completed final sign-off Dec 2024 | 1026 Pine St | Sure, Inc. | one 100sf kitchen and one 60sf bath remodel. no change to layout. update light fixtures in the unit. update sub breaker panel. work will only happen in 1026 the single dwelling unit. not changing any rooms or removing or adding any rooms.Details
one 100sf kitchen and one 60sf bath remodel. no change to layout. update light fixtures in the unit. update sub breaker panel. work will only happen in 1026 the single dwelling unit. not changing any rooms or removing or adding any rooms. | $68,000 |
| Feb 12, 2018 | Never finaled issued Feb 2018, no final | 1026 Pine St | street space | ||
| Jun 30, 2017 | Completed final sign-off Apr 2018 | 1026 Pine St | Ortizlaw Construction | retrofit ground level for wood frame seismic soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
retrofit ground level for wood frame seismic soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Feb 3, 2015 | Completed final sign-off Jul 2015 | 1026 Pine St | comply with ord 029-13 only. installation of grab bars in sro at following locations. 2/f bathroom (diagram 7), toilet foom (diagram 5). 3/f bathroom (diagram 7), toilet room (diagram 5). 4/f shower (diagram 10), toilet room (diagram 5). to comply w/complaint #201486453, item #2.Details
comply with ord 029-13 only. installation of grab bars in sro at following locations. 2/f bathroom (diagram 7), toilet foom (diagram 5). 3/f bathroom (diagram 7), toilet room (diagram 5). 4/f shower (diagram 10), toilet room (diagram 5). to comply w/complaint #201486453, item #2. | $450 | |
| Apr 15, 2008 | Completed final sign-off May 2008 | 1028 Pine St | San Francisco Fire Protection | emergency service repair, replaced notifier 124 r with firelite ms-2 panel only per sf bulletin sec 3.04 referencing 2001 cfc 1006, 2001, cbc sections 403Details
emergency service repair, replaced notifier 124 r with firelite ms-2 panel only per sf bulletin sec 3.04 referencing 2001 cfc 1006, 2001, cbc sections 403 | $500 |
| Feb 23, 2006 | Expired or cancelled expired Feb 2007 | 1026 Pine St | Gateway Roofing And Water Proofing Inc | reroofing | $7,000 |
| May 20, 2003 | Expired or cancelled expired Mar 2004 | 1026 Pine St | Chen's Plumbing Inc | 2nd, 3rd and 4th flr sro fire sprinklers (70 heads)Details
2nd, 3rd and 4th flr sro fire sprinklers (70 heads) | $14,600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sure, Inc. (4), Chen's Plumbing Inc, Crime Watch Security Sys Llc, Gateway Roofing And Water Proofing Inc, Ortizlaw Construction, Project Contractor Inc, San Francisco Fire Protection
- Architects
- Stacy Lin
- Engineers
- Lok Kwan
- Authorized agents
- Siu Man