Kirk A. Johnston
- License
- S4705
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S4705 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Degenkolb
- Based in
- San Francisco
- On San Francisco permits
- Sep 2019 to Dec 2023
4 permits since 2000 (engineer on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc, Skyline Construction
- Architects
- Ashley G. Miller, Carolyn Kiernat, Marcus A. Hopper, Pamela Robinson
- Engineers
- Kevin Christensen, Kylie Lo
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2023 | In progress issued Dec 2023 | 900 Kearny St | rev to pa 202301190407: new glass sliding door & associated structural header.Details
rev to pa 202301190407: new glass sliding door & associated structural header. | ||
| Feb 28, 2023 | In progress issued Jan 2024 | 400 California St | remove (e) entry double door, storefront & throshold and replace w/ new storefront (remove e entry vestibule & patch e finish fl to match). (e) stonetile, new balanced doors w/ ada push bottom, guardrail on either side of door). new egress passage 400 califora to 430 california. new accessible rampDetails
remove (e) entry double door, storefront & throshold and replace w/ new storefront (remove e entry vestibule & patch e finish fl to match). (e) stonetile, new balanced doors w/ ada push bottom, guardrail on either side of door). new egress passage 400 califora to 430 california. new accessible ramp | $250,000 | |
| Jul 22, 2020 | Completed final sign-off Oct 2021 | 101 Mission St | Skyline Construction | office t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and caseworkDetails
office t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and casework | $2,500,000 |
| Sep 9, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | 22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completionDetails
22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completion | $506,136 |