Kamala Mostert
- Listed as
- architect, authorized agent-others, designer
- Firm
- Mostert Architecture
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Feb 2026
54 permits since 2000 (architect on 51 permits, authorized agent-others on 3 permits, designer on 1 permit): 38 completed, 4 in progress, 5 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2026 | Expired or cancelled suspend Aug 2026 | 15 Park Hill Av | North Bay Construction | rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition.Details
rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition. | |
| Aug 21, 2025 | In progress issued Oct 2025 | 15 Park Hill Av | North Bay Construction | revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights.Details
revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights. | |
| Jul 3, 2025 | In progress issued Sep 2025 | 432 Dewey Bl | Ramos General Construction Inc. | renovate the (e) playroom into a master bathroom. renovate the (e) bedroom closet to provide for stairs to the room above the (e) garage. (e) storage room above the garage to be renovated into an office and closet w/ 8' ceiling.Details
renovate the (e) playroom into a master bathroom. renovate the (e) bedroom closet to provide for stairs to the room above the (e) garage. (e) storage room above the garage to be renovated into an office and closet w/ 8' ceiling. | $75,000 |
| May 1, 2025 | Completed final sign-off Jul 2026 | 389 27th St | North Dream Construction Inc | 3rd floor addition/renovation: extend (e) facade up, replacing the 3rd floor deck with (2) new bedrooms, (e) 3rd floor siting room to be renovated to become a hall and full bathroom.Details
3rd floor addition/renovation: extend (e) facade up, replacing the 3rd floor deck with (2) new bedrooms, (e) 3rd floor siting room to be renovated to become a hall and full bathroom. | $260,000 |
| Mar 28, 2025 | In progress issued Jun 2025 | 330 Burrows St | Vanscope Construction | ground fl: demo (e) bedroom, bathroom, closet and office and construct as drawn a family room, bedroom, bathroom, office & laundry. new doors, windows as drawn. new furnace - heat pump & water heater. demo (e) vinyl siding and sand paint (e) wood siding.Details
ground fl: demo (e) bedroom, bathroom, closet and office and construct as drawn a family room, bedroom, bathroom, office & laundry. new doors, windows as drawn. new furnace - heat pump & water heater. demo (e) vinyl siding and sand paint (e) wood siding. | $150,000 |
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 406 30th St | Martin Paul Duggan Contracting | interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof.Details
interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof. | $150,000 |
| Aug 15, 2024 | Completed final sign-off Dec 2024 | 982 Junipero Serra Bl | Martin Paul Duggan Contracting | renovation of (e) 2nd fl bathroom & bedroom as drawn. remove (e) skylikght @ bathroom not visible from streetDetails
renovation of (e) 2nd fl bathroom & bedroom as drawn. remove (e) skylikght @ bathroom not visible from street | $25,000 |
| Jul 30, 2024 | Completed final sign-off Oct 2024 | 318 Byxbee St | Martin Paul Duggan Contracting | otc permit in response to nov# 202423375: construction exceeded scope of work in permit app# 201511051797. ground floor demolition of interior wall at existing staircase as drawn in order to meet code for stair landing.Details
otc permit in response to nov# 202423375: construction exceeded scope of work in permit app# 201511051797. ground floor demolition of interior wall at existing staircase as drawn in order to meet code for stair landing. | $2,800 |
| Jun 18, 2024 | Completed final sign-off Mar 2025 | 36 Cragmont Av | Casement Construction | revision to 202404029185: new slab at ground floor for approved family rm & half bathDetails
revision to 202404029185: new slab at ground floor for approved family rm & half bath | $5,000 |
| Apr 30, 2024 | In progress issued May 2024 | 1877 Church St | Michael Clarke Construction | revision to permit application #201909050773. added a new detail for the property line south wall-see s/a0.3. per field inspector's request.Details
revision to permit application #201909050773. added a new detail for the property line south wall-see s/a0.3. per field inspector's request. | |
| Feb 28, 2024 | Completed final sign-off Apr 2026 | 412 Mississippi St | Michael Clarke Construction | demo extg stair from 2nd floor to ground floor and replace as drawn. demo extg bath at ground floor and replace as drawn. relocate laundry as drawn. add bar to ground floor. replace extg windows at ground fl. 550 for framing and foundation.Details
demo extg stair from 2nd floor to ground floor and replace as drawn. demo extg bath at ground floor and replace as drawn. relocate laundry as drawn. add bar to ground floor. replace extg windows at ground fl. 550 for framing and foundation. | $49,000 |
| Dec 20, 2023 | Completed final sign-off Jun 2024 | 138 Chenery St | Martin Paul Duggan Contracting | renovation of kitchen & bathroom: new windows in south elevation & new doors on north elecation, existing windows & door on south elevation to be removed and walls, patched & sided to match existing.Details
renovation of kitchen & bathroom: new windows in south elevation & new doors on north elecation, existing windows & door on south elevation to be removed and walls, patched & sided to match existing. | $50,000 |
| Jun 13, 2023 | Completed final sign-off Mar 2024 | 184 Anderson St | replacement of (e) foundation, renovation 2/f kitchen & family room including opening wall between. new 3/f dormer with new bathroom and structural strengthening.Details
replacement of (e) foundation, renovation 2/f kitchen & family room including opening wall between. new 3/f dormer with new bathroom and structural strengthening. | $125,000 | |
| Dec 20, 2022 | Completed final sign-off Jun 2023 | 190 Stillings Av | Casement Construction | to comply with correction notice report for permit 202209152547. engineering for unsafe (e) header in living/dining room, unsafe (e) 6x6 posts, bracing and base anchors at (e) deck.Details
to comply with correction notice report for permit 202209152547. engineering for unsafe (e) header in living/dining room, unsafe (e) 6x6 posts, bracing and base anchors at (e) deck. | $1,500 |
| Sep 15, 2022 | Completed final sign-off Jun 2023 | 190 Stillings Av | Casement Construction | renovation of (e) kitchen and (e) bathroom on 2nd fl; new skylight for kitchen. replace (e) skylights @ bathroom and hall; new deck @ ground floor master bedrom; repair (e) stairs from ground floor to garden; replace (e) windows @ front facade & (e) garage door; replace (e) rear door & window 2nd flDetails
renovation of (e) kitchen and (e) bathroom on 2nd fl; new skylight for kitchen. replace (e) skylights @ bathroom and hall; new deck @ ground floor master bedrom; repair (e) stairs from ground floor to garden; replace (e) windows @ front facade & (e) garage door; replace (e) rear door & window 2nd fl | $35,000 |
| Jul 20, 2022 | Never finaled issued Sep 2022, no final | 1877 Church St | Michael Clarke Construction | rev to pa201909050773: second floor deck to be extended 10ft into rear yard as drawn. revised engineering included for larger deck design. change art studio to media room on the ground floor.Details
rev to pa201909050773: second floor deck to be extended 10ft into rear yard as drawn. revised engineering included for larger deck design. change art studio to media room on the ground floor. | $5,000 |
| Jun 17, 2022 | Completed final sign-off Sep 2024 | 239 Molimo Dr | Mueller Construction | demo extg stair from 2nd floor to the 1st floor. construct new stairs. demo extg posts and beams on 1st floor. replace per structural design. new window and door, new full bath and extended framing and new retaining walls on 1st floor. new family room and office at 1st floor - new conditioned spaceDetails
demo extg stair from 2nd floor to the 1st floor. construct new stairs. demo extg posts and beams on 1st floor. replace per structural design. new window and door, new full bath and extended framing and new retaining walls on 1st floor. new family room and office at 1st floor - new conditioned space | $85,000 |
| May 17, 2022 | Completed final sign-off Nov 2023 | 1516 Guerrero St | Mount Street Construction | commencement of work not started under previously approved permit appication pa# 201604144784.Details
commencement of work not started under previously approved permit appication pa# 201604144784. | $25,000 |
| Aug 25, 2021 | Never finaled issued Jan 2022, no final | 350 Golden Gate Av | Giuliani Construction Incorp | interior renovation of the st. francis living room senior center. new lighting, receptacles, appliances, kitchen fixtures, millwork, and finishes.Details
interior renovation of the st. francis living room senior center. new lighting, receptacles, appliances, kitchen fixtures, millwork, and finishes. | $55,000 |
| Jun 23, 2021 | Completed final sign-off Jul 2023 | 5 Fella Pl | Michael Clarke Construction | unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters.Details
unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters. | $30,000 |
| May 25, 2021 | Completed final sign-off Mar 2022 | 15 Allston Wy | replace 1 front window & front door. g/f: 3 double hung windows. 2/f (3) awning wdws,1 fixed wdw & front door. 3/f: 1 double hung wdw. all front will be windows wood to match existing operation, low-e insul glass.Details
replace 1 front window & front door. g/f: 3 double hung windows. 2/f (3) awning wdws,1 fixed wdw & front door. 3/f: 1 double hung wdw. all front will be windows wood to match existing operation, low-e insul glass. | $5,000 | |
| Feb 23, 2021 | Expired or cancelled cancelled Jan 2026 | 2919 California St | revision to no plan pa# 201703282534: 2nd floor unit 2919. renovate kitchen. new millwork, appliances, lighting, receptacles and finishes.Details
revision to no plan pa# 201703282534: 2nd floor unit 2919. renovate kitchen. new millwork, appliances, lighting, receptacles and finishes. | $15,000 | |
| Feb 16, 2021 | Never finaled issued Feb 2023, no final | 1904 Baker St | renovate (e) grnd flr- excavate 3,825 sf soil w/ appx 140 lin ft (n) foundation, (n) slab. (n) posts/beams, remove ext stair, (n) int stair. horiz expanse into rear yard. renov master bed, fam rm & bath w/ laundry & util rm inside garage. 2nd flr-remove (e) ext stair/deck,(n) int stair. (n)3rd bedrmDetails
renovate (e) grnd flr- excavate 3,825 sf soil w/ appx 140 lin ft (n) foundation, (n) slab. (n) posts/beams, remove ext stair, (n) int stair. horiz expanse into rear yard. renov master bed, fam rm & bath w/ laundry & util rm inside garage. 2nd flr-remove (e) ext stair/deck,(n) int stair. (n)3rd bedrm | $195,000 | |
| Dec 22, 2020 | Completed final sign-off Oct 2021 | 224 Ashbury St | Jerimiah F Deasy/General Contractor | renovate (e) bathroom & build an additional full bath.Details
renovate (e) bathroom & build an additional full bath. | $10,000 |
| Aug 31, 2020 | Never finaled issued Oct 2020, no final | 826 35th Av | D K G Construction Inc | 2/f: demo of (e) load bearing wall in kitchen. new posts, beams & foundation piers as shown. 3/f: kitchen renovation & (2) bathroom renovations w/new skylight @ bathroom. infill lightwellDetails
2/f: demo of (e) load bearing wall in kitchen. new posts, beams & foundation piers as shown. 3/f: kitchen renovation & (2) bathroom renovations w/new skylight @ bathroom. infill lightwell | $50,000 |
| Jul 6, 2020 | Completed final sign-off Nov 2020 | 680 27th St | Brendan Waters Construction Inc | demo the (e) wall & door to the (e) interior stair on the 2/f toprovide a limited visusal connection between floors per z.a. no.1. demo (e) ext door on g/f bedroom: replace with scheduled window. add new window to g/f bed, relace door on g/f, new interior landing.Details
demo the (e) wall & door to the (e) interior stair on the 2/f toprovide a limited visusal connection between floors per z.a. no.1. demo (e) ext door on g/f bedroom: replace with scheduled window. add new window to g/f bed, relace door on g/f, new interior landing. | $25,000 |
| Jan 23, 2020 | Completed final sign-off Aug 2020 | 41 Miraloma Dr | Better Homes Construction | ground floor: 2 new bedrooms, new full bath, nw laundry and hall. nw conc. slab for habitable spaces as drawn. 2nd fl: nw half bath. extg load bearing wall to be removed as drawn with new posts beam and foundations as drawn.Details
ground floor: 2 new bedrooms, new full bath, nw laundry and hall. nw conc. slab for habitable spaces as drawn. 2nd fl: nw half bath. extg load bearing wall to be removed as drawn with new posts beam and foundations as drawn. | $48,000 |
| Dec 16, 2019 | Completed final sign-off Jan 2022 | 150 Josiah Av | David Rodriguez Construction | remove (e) powder room @ ground fl. install washer, dryer & sink @ ground fl. demo rear deck. remodel master bath. ref pa #201909262805 & #201909262808 are adu from single family dwelling to 3 units apartment.Details
remove (e) powder room @ ground fl. install washer, dryer & sink @ ground fl. demo rear deck. remodel master bath. ref pa #201909262805 & #201909262808 are adu from single family dwelling to 3 units apartment. | $125,000 |
| Sep 26, 2019 | Completed final sign-off Jan 2022 | 150 Josiah Av | David Rodriguez Construction | dwelling unit legalization (unit #1) per ord. 43-14. adu of unit #2 ref 201909262808 & 201912169631. common egress corridor per eg-05 for both units & (e) unit #3. update kitchen & bath. (n) flooring and lighting. (n) furnace in garage.Details
dwelling unit legalization (unit #1) per ord. 43-14. adu of unit #2 ref 201909262808 & 201912169631. common egress corridor per eg-05 for both units & (e) unit #3. update kitchen & bath. (n) flooring and lighting. (n) furnace in garage. | $30,000 |
| Sep 5, 2019 | Completed final sign-off Aug 2024 | 1877 Church St | Michael Clarke Construction | demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovationDetails
demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovation | $75,000 |
| Apr 3, 2019 | Completed final sign-off Feb 2021 | 3065 26th Av | Casement Construction | (n) bathroom on 2nd floor. extend (e) bedroom at 2nd floor & reduce size of (e) deck as drawn. (n) skylight over (n) bathroom. (n) doors & windows for bedroom as drawn. (n) guard rail for deck as drawn.Details
(n) bathroom on 2nd floor. extend (e) bedroom at 2nd floor & reduce size of (e) deck as drawn. (n) skylight over (n) bathroom. (n) doors & windows for bedroom as drawn. (n) guard rail for deck as drawn. | $25,000 |
| Feb 15, 2019 | Completed final sign-off May 2022 | 331 27th St | Mizen Construction Inc | renovation of (e) grd flr dwelling unit to remove (e) interior stair connected to 2nd flr. renovation of (e) 2nd flr & addition of (n) 3rd flr for a second dwelling unit on flrs 2 & 3.Details
renovation of (e) grd flr dwelling unit to remove (e) interior stair connected to 2nd flr. renovation of (e) 2nd flr & addition of (n) 3rd flr for a second dwelling unit on flrs 2 & 3. | $300,000 |
| Aug 29, 2018 | Completed final sign-off Jan 2019 | 652 Cole St | renovatonof (e) kitchen - new cabinets, finishes, lighting and appliances as drawn. enlarge (e) opening btw kitchen and dining rm. renovation of (e) bathroom - new finishes & fixturesDetails
renovatonof (e) kitchen - new cabinets, finishes, lighting and appliances as drawn. enlarge (e) opening btw kitchen and dining rm. renovation of (e) bathroom - new finishes & fixtures | $20,000 | |
| Apr 30, 2018 | Completed final sign-off Jul 2019 | 448 Fair Oaks St | Structural Concepts Design Build Corp | renovation of extg bathrooms and new skylight.Details
renovation of extg bathrooms and new skylight. | $15,000 |
| Apr 23, 2018 | Completed final sign-off Sep 2018 | 650 Cole St | removing (e) kitchen appliances and fixtures and flooring, (e) load bearing wall btw kit & din rm to have (e) door opening enlargedDetails
removing (e) kitchen appliances and fixtures and flooring, (e) load bearing wall btw kit & din rm to have (e) door opening enlarged | $25,000 | |
| Apr 3, 2018 | Completed final sign-off May 2018 | 175 Montcalm St | revision to pa 2017-0316-1608 revised guardrail details for interior staircaseDetails
revision to pa 2017-0316-1608 revised guardrail details for interior staircase | ||
| Mar 15, 2018 | Completed final sign-off Jul 2018 | 244 Andover St | remove (e) wall front entry hall to ground floor corridor as drawn. remove (e) bar and replace with a new counter & sink as drawn. legalize (e) ground floor bath, bedroom & family roomDetails
remove (e) wall front entry hall to ground floor corridor as drawn. remove (e) bar and replace with a new counter & sink as drawn. legalize (e) ground floor bath, bedroom & family room | $45,000 | |
| Aug 18, 2017 | Completed final sign-off May 2020 | 128 Moffitt St | renovation of (e) ground floor. new stair. new half bath. new family room. demo (e) bath, relocate (e) utilities as drawn. renovate (e) 2nd floor. demo (e) kitchen & bath. renovate 3 bedrooms & 2 baths. add new 3rd floor for kitchen, living, dining, office & deck.Details
renovation of (e) ground floor. new stair. new half bath. new family room. demo (e) bath, relocate (e) utilities as drawn. renovate (e) 2nd floor. demo (e) kitchen & bath. renovate 3 bedrooms & 2 baths. add new 3rd floor for kitchen, living, dining, office & deck. | $380,000 | |
| Jun 30, 2017 | Completed final sign-off Nov 2019 | 125 Bertita St | S H C I | (e) 2 story structure & (e) exterior stair @ rear garden to be modified with a 2 story structure with a interior stair. new windows & siding as drawn. new bedroom & bath on ground floor.Details
(e) 2 story structure & (e) exterior stair @ rear garden to be modified with a 2 story structure with a interior stair. new windows & siding as drawn. new bedroom & bath on ground floor. | $65,000 |
| May 23, 2017 | Completed final sign-off Jan 2018 | 2666 35th Av | B Construction | interior renovation of (e) kitchen, (e) courtyard and (e) bathroom on 2/f. renovate of (e) stairs from g/f to 2/f.Details
interior renovation of (e) kitchen, (e) courtyard and (e) bathroom on 2/f. renovate of (e) stairs from g/f to 2/f. | $100,000 |
| Aug 10, 2016 | Completed final sign-off Apr 2017 | 18 Marsilly St | Di Vine Construction | new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closetDetails
new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closet | $100,000 |
| Apr 14, 2016 | Never finaled issued Apr 2017, no final | 1516 Guerrero St | remove extg roofs over extg stairwell at extg court and replace with a new kalwall self supporting ridge roof.Details
remove extg roofs over extg stairwell at extg court and replace with a new kalwall self supporting ridge roof. | $25,000 | |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 204 Congo St | Transbay Design Build Llc | front facade - remove vinyl siding replace w/wood. remove (e) windows replace w/wood double hung. remove (e) double doors @ entry replace w/single window. demo (e) ramp, stairs, porch replace as drawn. remodel (e) master bath, extension of (e) rear deck w/stair.Details
front facade - remove vinyl siding replace w/wood. remove (e) windows replace w/wood double hung. remove (e) double doors @ entry replace w/single window. demo (e) ramp, stairs, porch replace as drawn. remodel (e) master bath, extension of (e) rear deck w/stair. | $50,000 |
| Oct 3, 2013 | Expired or cancelled cancelled Jan 2026 | 1515 Guerrero St | new fence at south property line in rear of house.Details
new fence at south property line in rear of house. | $2,500 | |
| Mar 18, 2011 | Expired or cancelled cancelled Nov 2018 | 1877 Church St | renovate ground floor into a dwelling unit. a horiontal addition @ the rear of 302 sq ft. interior remodel of second fl master bedrm, bathrm w/ horiz addition of 93 sq ft, and a new deck @ 140 sq ft.Details
renovate ground floor into a dwelling unit. a horiontal addition @ the rear of 302 sq ft. interior remodel of second fl master bedrm, bathrm w/ horiz addition of 93 sq ft, and a new deck @ 140 sq ft. | $150,000 | |
| Nov 12, 2009 | Completed final sign-off Jun 2010 | 256 Clipper St | interior remodel of 2nd floor kitchen, new flat skylight & pocket doors. new millwork, finishes & appliances. removal of rear (e) windowDetails
interior remodel of 2nd floor kitchen, new flat skylight & pocket doors. new millwork, finishes & appliances. removal of rear (e) window | $50,000 | |
| Oct 13, 2009 | Completed final sign-off Jan 2010 | 1521 Guerrero St | interior remodel. new pocket door from kitchen to bath, remove existing door to existing deck at bathroom, new door at dining room to existing deck, new washer dryer at bathroom, demo closet walls in bathroomDetails
interior remodel. new pocket door from kitchen to bath, remove existing door to existing deck at bathroom, new door at dining room to existing deck, new washer dryer at bathroom, demo closet walls in bathroom | $5,000 | |
| Mar 27, 2009 | Expired or cancelled expired Apr 2012 | 56 Webster St | Keegan Contruction Inc. | demolition of existing non-load bearing wall to make two closets into one large walk in closet, to install double door to closet, replacement of existing door at dining room w/ owner provided door.Details
demolition of existing non-load bearing wall to make two closets into one large walk in closet, to install double door to closet, replacement of existing door at dining room w/ owner provided door. | $2,000 |
| Aug 14, 2008 | Completed final sign-off Sep 2008 | 60 Webster St | S L R Construction | removal of interior non-bearing partition wall between closets & removal of (e) closet door with new wood stud framing to match & 5/8" type "x" sheet rock each side on 60 webster st.Details
removal of interior non-bearing partition wall between closets & removal of (e) closet door with new wood stud framing to match & 5/8" type "x" sheet rock each side on 60 webster st. | $5,000 |
| Dec 31, 2007 | Completed final sign-off May 2008 | 3831 Cesar Chavez St | Cas Construction | new foundation & slab as indicated in drawing. addition of bedroom and playroom @ ground floor.Details
new foundation & slab as indicated in drawing. addition of bedroom and playroom @ ground floor. | $20,000 |
| Aug 18, 2006 | Completed final sign-off Jun 2007 | 1330 Chestnut St | interior renovation. new kitchen. (remodel of load bearing walls - s.s.d) new interior finishes & bath fixtures @ powder room & guest bath. remodeling of master bathroom. new lighting throughout; new wood floors @ kitchen; living room; dining room; hall & corridor. new french door to (e) deck @Details
interior renovation. new kitchen. (remodel of load bearing walls - s.s.d) new interior finishes & bath fixtures @ powder room & guest bath. remodeling of master bathroom. new lighting throughout; new wood floors @ kitchen; living room; dining room; hall & corridor. new french door to (e) deck @ | $50,000 | |
| Jun 28, 2006 | Expired or cancelled cancelled Jan 2010 | 56 Webster St | existing garage to excavated. new posts and beams to be installed. new garage on egress dr. 1 hr corridor and driveway with guardrails to be constructed.Details
existing garage to excavated. new posts and beams to be installed. new garage on egress dr. 1 hr corridor and driveway with guardrails to be constructed. | $50,000 | |
| Mar 7, 2003 | Completed final sign-off Aug 2003 | 2935 Sacramento St | remodel exist bath, remodel exist kitchen, add second bathDetails
remodel exist bath, remodel exist kitchen, add second bath | $25,000 | |
| Mar 9, 2000 | Expired or cancelled withdrawn Jan 2007 | 216 Connecticut St | Details
| $5,000 |