Block 0346, lot 024
350 Golden Gate Ave
- City’s use
- Commercial Misc
- Lot
- 18,985 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2024 | Completed final sign-off Jan 2025 | 350 Golden Gate Av | Drycrew Restoration Contractor | revision to pa# 202408138523: unit #410- replacement of approx. 2000sqft drywall w/ 5/8" type x sheetrock, insulation, and flooring.Details
revision to pa# 202408138523: unit #410- replacement of approx. 2000sqft drywall w/ 5/8" type x sheetrock, insulation, and flooring. | $5,000 |
| Aug 13, 2024 | Completed final sign-off Sep 2024 | 350 Golden Gate Av | Drycrew Restoration Contractor | replacement of drywall, insulation, and flooring materials in units# 203, 207, 210, 301, 307, no wall demolition or construction.Details
replacement of drywall, insulation, and flooring materials in units# 203, 207, 210, 301, 307, no wall demolition or construction. | $10,000 |
| Aug 13, 2024 | Completed final sign-off Jan 2025 | 350 Golden Gate Av | Drycrew Restoration Contractor | replacement of drywall, insulation, and flooring materials in units# 402, 404, 408, 304, 403, and 303. no wall demolition or construction.Details
replacement of drywall, insulation, and flooring materials in units# 402, 404, 408, 304, 403, and 303. no wall demolition or construction. | $10,000 |
| Aug 13, 2024 | Completed final sign-off Dec 2024 | 350 Golden Gate Av | Drycrew Restoration Contractor | replacement of drywall, insulation, and flooring materials in units# 407, 411, 310, 202, 209, 401. no wall demolition or construction.Details
replacement of drywall, insulation, and flooring materials in units# 407, 411, 310, 202, 209, 401. no wall demolition or construction. | $10,000 |
| Aug 7, 2024 | Completed final sign-off Sep 2024 | 350 Golden Gate Av | Drycrew Restoration Contractor | replacement of drywall, insulation and flooring materials in units 201,302,311 and 409. no wall demolition or construction.Details
replacement of drywall, insulation and flooring materials in units 201,302,311 and 409. no wall demolition or construction. | $10,000 |
| Mar 29, 2023 | Completed final sign-off May 2023 | 350 Golden Gate Av | Giuliani Construction Incorp | to obtain final inspection for work approved under pa# 202108257123. all work is complete.Details
to obtain final inspection for work approved under pa# 202108257123. all work is complete. | |
| Jan 20, 2023 | Completed final sign-off Aug 2023 | 350 Golden Gate Av | Bold Construction Group Inc | replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed.Details
replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed. | $190,000 |
| Sep 27, 2022 | Never finaled issued Dec 2022, no final | 350 Golden Gate Av | establish a catering use for cooking. no work to be done to the space. catering not for the residence.Details
establish a catering use for cooking. no work to be done to the space. catering not for the residence. | ||
| Aug 25, 2021 | Never finaled issued Jan 2022, no final | 350 Golden Gate Av | Giuliani Construction Incorp | interior renovation of the st. francis living room senior center. new lighting, receptacles, appliances, kitchen fixtures, millwork, and finishes.Details
interior renovation of the st. francis living room senior center. new lighting, receptacles, appliances, kitchen fixtures, millwork, and finishes. | $55,000 |
| Jan 2, 2019 | Never finaled issued Jan 2019, no final | 350 Golden Gate Av | street spaceDetails
street space | ||
| Dec 14, 2016 | Completed final sign-off Dec 2016 | 350 Golden Gate Av | Interstate Restoration California Lp | repair 1,400 sq ft of drywall flood cut's 5/8 type x, insulation, 3rd floor hall, 3rd floor landing, 2nd floor lobby, 2nd floor landing (same place's for drywall & insulation). 2'-0" cuts.Details
repair 1,400 sq ft of drywall flood cut's 5/8 type x, insulation, 3rd floor hall, 3rd floor landing, 2nd floor lobby, 2nd floor landing (same place's for drywall & insulation). 2'-0" cuts. | $15,000 |
| Jan 25, 2016 | Never finaled issued Jan 2016, no final | 350 Golden Gate Av | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Drycrew Restoration Contractor (5), Giuliani Construction Incorp (2), Bold Construction Group Inc, Interstate Restoration California Lp
- Architects
- Kamala Mostert
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.