Transbay Design Build Llc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to Sep 2024
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2024 | Completed final sign-off Mar 2025 | 438 Head St | revision of pa# 202407156488: adding replacement of the front windows with like in kind marvin ultimate alum clad windows. original permit included replacement of door and window trim, replacement of stucco and replacement of flashing at roofline, repair of dryrot as needed. same size and configuratDetails
revision of pa# 202407156488: adding replacement of the front windows with like in kind marvin ultimate alum clad windows. original permit included replacement of door and window trim, replacement of stucco and replacement of flashing at roofline, repair of dryrot as needed. same size and configurat | |
| Jul 22, 2024 | In progress issued Jul 2024 | 280 Gellert Dr | replacement of (3) front facing windows, like in kind. (e) windows are vinyl inserts that have failed. new windows to be fiberglass inserts with the same configuration (milgard ultra c650).Details
replacement of (3) front facing windows, like in kind. (e) windows are vinyl inserts that have failed. new windows to be fiberglass inserts with the same configuration (milgard ultra c650). | $9,000 |
| Jul 15, 2024 | Completed final sign-off Mar 2025 | 775 08th Av | remodel of (e) bathroom including new tile, tub, toilet, vanity. upgrade of plumbing and electrical to meet code. no structural changes.Details
remodel of (e) bathroom including new tile, tub, toilet, vanity. upgrade of plumbing and electrical to meet code. no structural changes. | $25,000 |
| Jul 15, 2024 | Completed final sign-off Mar 2025 | 438 Head St | removal and replacement of all existing stucco on front facade. replacement of degraded window and door trim. replacement of flashing at roof line. repair dry rot as needed.Details
removal and replacement of all existing stucco on front facade. replacement of degraded window and door trim. replacement of flashing at roof line. repair dry rot as needed. | $10,000 |
| Jun 26, 2020 | Completed final sign-off Feb 2021 | 1716 Quesada Av | remodel bathroom at 2nd flr, convert (e) laundry to bathroom w/ (n) skylight at 2nd flr, relocate (e) laundry to garage.Details
remodel bathroom at 2nd flr, convert (e) laundry to bathroom w/ (n) skylight at 2nd flr, relocate (e) laundry to garage. | $48,000 |
| Jan 16, 2019 | Completed final sign-off Jul 2019 | 3118 Washington St | remodel 2 (e) bathrooms; rleocate closet on toplevel of building & remove wall to annex closet to bathroom.Details
remodel 2 (e) bathrooms; rleocate closet on toplevel of building & remove wall to annex closet to bathroom. | $50,000 |
| Oct 25, 2018 | Completed final sign-off Oct 2021 | 350 Joost Av | rear yard addition of (n) 1-story master bed & bath. (n) interior connecting stair. renovate (e) kitchen & bath. remove (e) rear bay window & add (n) sliding door in place. (n) laundry room at ground flr, plumbing, electrical, lighting & hvac.Details
rear yard addition of (n) 1-story master bed & bath. (n) interior connecting stair. renovate (e) kitchen & bath. remove (e) rear bay window & add (n) sliding door in place. (n) laundry room at ground flr, plumbing, electrical, lighting & hvac. | $275,000 |
| Oct 16, 2018 | Completed final sign-off Jul 2019 | 730 21st Av | kitchen remodel, convert laundry sink into bar sink, relocate laundry, (n) water heater and furnace, replacement of 1 window and door at rear. removal of interior utility stairs to unfinished basement / crawl-space area. relocate laundry from basement to 1/f pantry area.Details
kitchen remodel, convert laundry sink into bar sink, relocate laundry, (n) water heater and furnace, replacement of 1 window and door at rear. removal of interior utility stairs to unfinished basement / crawl-space area. relocate laundry from basement to 1/f pantry area. | $62,000 |
| Feb 21, 2018 | Completed final sign-off Jan 2019 | 1597 Treat Av | installation sequence plan to accommodate foundation excavation per prev approved permit 201712156552Details
installation sequence plan to accommodate foundation excavation per prev approved permit 201712156552 | |
| Dec 15, 2017 | Completed final sign-off Dec 2018 | 1597 Treat Av | fill in space under e porch space with new unconditioned storage space. new windows, door units and siding to match existing at rear ease and norht walls. int remodel of 1st fl kitchen, bath laundry, 2nd fl bath, 1 bedrooms and new wcDetails
fill in space under e porch space with new unconditioned storage space. new windows, door units and siding to match existing at rear ease and norht walls. int remodel of 1st fl kitchen, bath laundry, 2nd fl bath, 1 bedrooms and new wc | $150,000 |
| Nov 29, 2017 | Completed final sign-off Jun 2018 | 2355 44th Av | 2 front and 2 rear windows replacement - remove exiting single pane aluminum inserts from the front façade and replace with aluminum exterior clad wood windows.no change of (e) openings. max u-factor 0.32.Details
2 front and 2 rear windows replacement - remove exiting single pane aluminum inserts from the front façade and replace with aluminum exterior clad wood windows.no change of (e) openings. max u-factor 0.32. | $6,000 |
| Nov 29, 2017 | Completed final sign-off Jun 2018 | 2355 44th Av | remodel of (e) bath and kitchen. new plumbing fixtures, new electrical fixtures and wiring. new kitchen appliances, enlarge 1 door opening is non-bearing wall, new insulation in opened walls & ceiling in new kitchen countertops & cabinets.Details
remodel of (e) bath and kitchen. new plumbing fixtures, new electrical fixtures and wiring. new kitchen appliances, enlarge 1 door opening is non-bearing wall, new insulation in opened walls & ceiling in new kitchen countertops & cabinets. | $44,000 |
| Jul 26, 2017 | Completed final sign-off Nov 2017 | 389 Roosevelt Wy | rev. to pa#201609097344: it was discovered that the rear wall stucco was poorly installed and leaking. this applic. is ffor the removal of more stucco than originally anticipated and installation of wood siding.also replacement of damaged single glazed windowsDetails
rev. to pa#201609097344: it was discovered that the rear wall stucco was poorly installed and leaking. this applic. is ffor the removal of more stucco than originally anticipated and installation of wood siding.also replacement of damaged single glazed windows | $5,000 |
| Sep 9, 2016 | Completed final sign-off Nov 2017 | 389 Roosevelt Wy | the project includes a ground floor infill addition below a permitted rear yard deck(200508120219). new rooms to include a home office, bathroom and family room. there will be a partial seismic upgrade, plbmg and electrical in the area of work.Details
the project includes a ground floor infill addition below a permitted rear yard deck(200508120219). new rooms to include a home office, bathroom and family room. there will be a partial seismic upgrade, plbmg and electrical in the area of work. | $100,000 |
| Jun 1, 2016 | Completed final sign-off Mar 2017 | 21 Homestead St | top unit: add 2 skylights. update sprinkler, elec, mech. layout inknitting room. no change to exterior envelope.Details
top unit: add 2 skylights. update sprinkler, elec, mech. layout inknitting room. no change to exterior envelope. | $22,000 |
| Dec 18, 2015 | Completed final sign-off Feb 2016 | 204 Congo St | voluntary upgrade of degraded foundation under new master bath under 201507171782. foundation work is perimeter of existing gr level storage rm. ufer on elec permitDetails
voluntary upgrade of degraded foundation under new master bath under 201507171782. foundation work is perimeter of existing gr level storage rm. ufer on elec permit | $11,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 204 Congo St | front facade - remove vinyl siding replace w/wood. remove (e) windows replace w/wood double hung. remove (e) double doors @ entry replace w/single window. demo (e) ramp, stairs, porch replace as drawn. remodel (e) master bath, extension of (e) rear deck w/stair.Details
front facade - remove vinyl siding replace w/wood. remove (e) windows replace w/wood double hung. remove (e) double doors @ entry replace w/single window. demo (e) ramp, stairs, porch replace as drawn. remodel (e) master bath, extension of (e) rear deck w/stair. | $50,000 |