Back to bathroom remodel contractors
Transbay Design Build Llc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to Sep 2024
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 13 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2024 | Completed final sign-off Mar 2025 | 775 08th Av | remodel of (e) bathroom including new tile, tub, toilet, vanity. upgrade of plumbing and electrical to meet code. no structural changes.Details
remodel of (e) bathroom including new tile, tub, toilet, vanity. upgrade of plumbing and electrical to meet code. no structural changes. | $25,000 |
| Jun 26, 2020 | Completed final sign-off Feb 2021 | 1716 Quesada Av | remodel bathroom at 2nd flr, convert (e) laundry to bathroom w/ (n) skylight at 2nd flr, relocate (e) laundry to garage.Details
remodel bathroom at 2nd flr, convert (e) laundry to bathroom w/ (n) skylight at 2nd flr, relocate (e) laundry to garage. | $48,000 |
| Jan 16, 2019 | Completed final sign-off Jul 2019 | 3118 Washington St | remodel 2 (e) bathrooms; rleocate closet on toplevel of building & remove wall to annex closet to bathroom.Details
remodel 2 (e) bathrooms; rleocate closet on toplevel of building & remove wall to annex closet to bathroom. | $50,000 |
| Oct 25, 2018 | Completed final sign-off Oct 2021 | 350 Joost Av | rear yard addition of (n) 1-story master bed & bath. (n) interior connecting stair. renovate (e) kitchen & bath. remove (e) rear bay window & add (n) sliding door in place. (n) laundry room at ground flr, plumbing, electrical, lighting & hvac.Details
rear yard addition of (n) 1-story master bed & bath. (n) interior connecting stair. renovate (e) kitchen & bath. remove (e) rear bay window & add (n) sliding door in place. (n) laundry room at ground flr, plumbing, electrical, lighting & hvac. | $275,000 |
| Dec 15, 2017 | Completed final sign-off Dec 2018 | 1597 Treat Av | fill in space under e porch space with new unconditioned storage space. new windows, door units and siding to match existing at rear ease and norht walls. int remodel of 1st fl kitchen, bath laundry, 2nd fl bath, 1 bedrooms and new wcDetails
fill in space under e porch space with new unconditioned storage space. new windows, door units and siding to match existing at rear ease and norht walls. int remodel of 1st fl kitchen, bath laundry, 2nd fl bath, 1 bedrooms and new wc | $150,000 |
| Nov 29, 2017 | Completed final sign-off Jun 2018 | 2355 44th Av | remodel of (e) bath and kitchen. new plumbing fixtures, new electrical fixtures and wiring. new kitchen appliances, enlarge 1 door opening is non-bearing wall, new insulation in opened walls & ceiling in new kitchen countertops & cabinets.Details
remodel of (e) bath and kitchen. new plumbing fixtures, new electrical fixtures and wiring. new kitchen appliances, enlarge 1 door opening is non-bearing wall, new insulation in opened walls & ceiling in new kitchen countertops & cabinets. | $44,000 |
| Sep 9, 2016 | Completed final sign-off Nov 2017 | 389 Roosevelt Wy | the project includes a ground floor infill addition below a permitted rear yard deck(200508120219). new rooms to include a home office, bathroom and family room. there will be a partial seismic upgrade, plbmg and electrical in the area of work.Details
the project includes a ground floor infill addition below a permitted rear yard deck(200508120219). new rooms to include a home office, bathroom and family room. there will be a partial seismic upgrade, plbmg and electrical in the area of work. | $100,000 |
| Dec 18, 2015 | Completed final sign-off Feb 2016 | 204 Congo St | voluntary upgrade of degraded foundation under new master bath under 201507171782. foundation work is perimeter of existing gr level storage rm. ufer on elec permitDetails
voluntary upgrade of degraded foundation under new master bath under 201507171782. foundation work is perimeter of existing gr level storage rm. ufer on elec permit | $11,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 204 Congo St | front facade - remove vinyl siding replace w/wood. remove (e) windows replace w/wood double hung. remove (e) double doors @ entry replace w/single window. demo (e) ramp, stairs, porch replace as drawn. remodel (e) master bath, extension of (e) rear deck w/stair.Details
front facade - remove vinyl siding replace w/wood. remove (e) windows replace w/wood double hung. remove (e) double doors @ entry replace w/single window. demo (e) ramp, stairs, porch replace as drawn. remodel (e) master bath, extension of (e) rear deck w/stair. | $50,000 |