Tony Fong
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Apr 2019
459 permits since 2000 (engineer on 383 permits, architect on 37 permits, authorized agent-others on 30 permits, designer on 5 permits, pmt consultant/expediter on 5 permits, attorney on 1 permit): 344 completed, 34 never finaled, 81 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 459.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 5, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | new connecting stair between levels 25 & 28. consturction of new metal stair, handrails, guards, stair opening guards, and associated structurl work at slabs.Details
new connecting stair between levels 25 & 28. consturction of new metal stair, handrails, guards, stair opening guards, and associated structurl work at slabs. | $300,000 | |
| Sep 29, 2015 | Completed final sign-off Dec 2016 | 2429 Bay St | L.G. Construction Co.,Inc | provide as built plan for pa#201404183632 to show add (n) beams. n/a ordinance #155-13 to show add (n) beams structural support only.Details
provide as built plan for pa#201404183632 to show add (n) beams. n/a ordinance #155-13 to show add (n) beams structural support only. | |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 1712 Noe St | Pan Geo Construction | revision to appl #2015.0127.6762 - replace (e) wall heater at back building. replace (e) rotted siding wherever necessary at front & rear ground floor area at front building.Details
revision to appl #2015.0127.6762 - replace (e) wall heater at back building. replace (e) rotted siding wherever necessary at front & rear ground floor area at front building. | $5,000 |
| Apr 14, 2015 | Never finaled filed Apr 2015, never issued | 372 07th Av | legalize acupunture doctor's office and 4 acupuncture and massage treatment rooms at existing g/f. work includes (n) ada bathroom.Details
legalize acupunture doctor's office and 4 acupuncture and massage treatment rooms at existing g/f. work includes (n) ada bathroom. | $20,000 | |
| Apr 3, 2015 | Completed final sign-off May 2015 | 2557 Polk St | revsion to 201409297602. revise shear walls, holdowns, eliminate shear walls per building inspectors instructions. maher not reqDetails
revsion to 201409297602. revise shear walls, holdowns, eliminate shear walls per building inspectors instructions. maher not req | ||
| Jan 8, 2015 | Completed final sign-off Aug 2015 | 156 Upland Dr | Seabee Construction | add a family room and a full bath at ground floorDetails
add a family room and a full bath at ground floor | $15,000 |
| Oct 23, 2014 | Completed final sign-off May 2015 | 1623 Moraga St | convert ground floor -2 bedrooms, 1 storage & a full bath to 1 bedroom, 1 bath and a family room. legalize one bedroom, no bldg extension, no work at front facade.Details
convert ground floor -2 bedrooms, 1 storage & a full bath to 1 bedroom, 1 bath and a family room. legalize one bedroom, no bldg extension, no work at front facade. | $5,000 | |
| Oct 3, 2014 | Completed final sign-off Dec 2014 | 1802 Funston Av | Ideal Carpentry** See Contractor's Note* | dryrot repair of e deck less than 50%Details
dryrot repair of e deck less than 50% | $3,000 |
| Sep 30, 2014 | Completed final sign-off Aug 2015 | 1746 23rd Av | add a full bathroom, a closet, relocate (e) kitchen. remove (e) interior stair and add a (n) stair from 2nd floor to ground floor, add 2 bedrooms and a family room at ground floor.Details
add a full bathroom, a closet, relocate (e) kitchen. remove (e) interior stair and add a (n) stair from 2nd floor to ground floor, add 2 bedrooms and a family room at ground floor. | $40,000 | |
| Sep 29, 2014 | Completed final sign-off Feb 2015 | 235 Oak Park Dr | required to submit rear elevation view for approved rear deck construction, rear deck approved plan #201310159228Details
required to submit rear elevation view for approved rear deck construction, rear deck approved plan #201310159228 | ||
| Sep 29, 2014 | Completed final sign-off May 2015 | 2557 Polk St | soft story retrofitDetails
soft story retrofit | $10,000 | |
| Sep 15, 2014 | Completed final sign-off Jul 2015 | 830 40th Av | Cht Properties Development | convert extg toilet and e closet into a full bath on extg 2nd floor. replace and reinstall furnace and extg washer w/h at rear of extg garage area. to comply with complaint #20141912Details
convert extg toilet and e closet into a full bath on extg 2nd floor. replace and reinstall furnace and extg washer w/h at rear of extg garage area. to comply with complaint #20141912 | $6,000 |
| Jul 29, 2014 | Completed final sign-off Aug 2017 | 80 Missouri St | I E General Const Inc | extend existing corridor & add two doors at ground floor at existing warehouse & storage. n/a for maherDetails
extend existing corridor & add two doors at ground floor at existing warehouse & storage. n/a for maher | $3,000 |
| Jul 17, 2014 | Never finaled issued Jul 2014, no final | 1055 Taraval St | All Applied Construction Inc | repair fire damaged area in extg restaurant rear existing walk-in freezer. replace sub floor, mezz floor and ceiling fire damage member same size and same location. put tile for all flooring. repair existing rear stairway in kind.Details
repair fire damaged area in extg restaurant rear existing walk-in freezer. replace sub floor, mezz floor and ceiling fire damage member same size and same location. put tile for all flooring. repair existing rear stairway in kind. | $8,000 |
| Jul 10, 2014 | Completed final sign-off Oct 2015 | 1745 16th Av | Spectrum Development Co. | replace extg front window with new 4'x4' double pane window u=0.40Details
replace extg front window with new 4'x4' double pane window u=0.40 | $500 |
| Jul 8, 2014 | Completed final sign-off Oct 2015 | 1745 16th Av | Spectrum Development Co. | add a family room, storage & full bath at the side of (e) ground floor (garage area).Details
add a family room, storage & full bath at the side of (e) ground floor (garage area). | $7,000 |
| Jul 1, 2014 | Never finaled issued Aug 2014, no final | 121 Apollo St | construct a 5'6" w x 15' l @ 2nd floor rear deck.Details
construct a 5'6" w x 15' l @ 2nd floor rear deck. | $3,000 | |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 2416 Chestnut St | Edenavow Construction & Design | remove all electrical & plumbing for a vacant laundromat. ab-017 applies, n/a maher ordinanceDetails
remove all electrical & plumbing for a vacant laundromat. ab-017 applies, n/a maher ordinance | $1,000 |
| May 23, 2014 | Expired or cancelled withdrawn Sep 2015 | 2429 Bay St | voluntary add support beams on (e) 2nd floor between (e) breakfast room and (e) kitchen. revision appl. 201404183632.Details
voluntary add support beams on (e) 2nd floor between (e) breakfast room and (e) kitchen. revision appl. 201404183632. | $3,000 | |
| May 22, 2014 | Completed final sign-off Jul 2014 | 717 Grand View Av | Edenavow Construction & Design | dry-rot repair to 3 story rear balcony. replace extg rotted members with same size. redwood on p.t. wood.Details
dry-rot repair to 3 story rear balcony. replace extg rotted members with same size. redwood on p.t. wood. | $4,500 |
| May 21, 2014 | Completed final sign-off Jun 2014 | 1710 48th Av | Edenavow Construction & Design | dry rot repair for extg rear deck and stairs.Details
dry rot repair for extg rear deck and stairs. | $5,000 |
| May 6, 2014 | Completed final sign-off Nov 2014 | 2414 38th Av | add a bedroom and a family room and a toilet at rear of (e) garage areaDetails
add a bedroom and a family room and a toilet at rear of (e) garage area | $8,000 | |
| Apr 23, 2014 | Completed final sign-off Oct 2015 | 1712 Noe St | Pan Geo Construction | back rear building:tile extg bathroom, handrail, new steps.Details
back rear building:tile extg bathroom, handrail, new steps. | $1,000 |
| Apr 18, 2014 | Expired or cancelled expired Dec 2016 | 2429 Bay St | L.G. Construction Co.,Inc | interior remodeling - relocate one-bedroom, one bath & interior stairs at ground floor. relocate half bath, add central island, a 3 l.f. cabinets & 3.5 lf counter @ 2nd floor kitchen at 2nd floor. remodel 2 bths @ 3rd floor & repair stair handrail.Details
interior remodeling - relocate one-bedroom, one bath & interior stairs at ground floor. relocate half bath, add central island, a 3 l.f. cabinets & 3.5 lf counter @ 2nd floor kitchen at 2nd floor. remodel 2 bths @ 3rd floor & repair stair handrail. | $40,000 |
| Mar 28, 2014 | Completed final sign-off Feb 2015 | 235 Oak Park Dr | to comply with nov #201339201. remove approx. 8 ln ft of non bearing wall between extg kitchen and extg dinning area. no change in layout of extg kitchen. no remodeling extg 2 bathrooms, only replace tile of extg bathroom flooring under app#201310078692Details
to comply with nov #201339201. remove approx. 8 ln ft of non bearing wall between extg kitchen and extg dinning area. no change in layout of extg kitchen. no remodeling extg 2 bathrooms, only replace tile of extg bathroom flooring under app#201310078692 | $500 | |
| Mar 25, 2014 | Completed final sign-off Jul 2014 | 26 Saint Charles Av | revise approved app#201401025444. revise bath room at ground floor and add closet to extg bedroom at ground floor. convert a toilet into a full bath and convert a bathoom to extg closet. relocate kitchen on second flr.Details
revise approved app#201401025444. revise bath room at ground floor and add closet to extg bedroom at ground floor. convert a toilet into a full bath and convert a bathoom to extg closet. relocate kitchen on second flr. | ||
| Mar 24, 2014 | Never finaled issued Mar 2014, no final | 2557 Polk St | voluntary add 5/8"x 12" anchor bolts with 2"x2"x1/4" thick washer to existing foundation with epoxy wherever reachable at approx. 36" o.c. na ordinance #155-13.Details
voluntary add 5/8"x 12" anchor bolts with 2"x2"x1/4" thick washer to existing foundation with epoxy wherever reachable at approx. 36" o.c. na ordinance #155-13. | $6,000 | |
| Mar 21, 2014 | Expired or cancelled withdrawn Dec 2015 | 3004 Taraval St | convert an (e) bicycle shop to coffee shopDetails
convert an (e) bicycle shop to coffee shop | $20,000 | |
| Jan 8, 2014 | Completed final sign-off Jan 2015 | 410 11th Av | convert (e) storage area into 2 bedrooms, a sunroom, a storage and a toilet at rear of (e) garage.Details
convert (e) storage area into 2 bedrooms, a sunroom, a storage and a toilet at rear of (e) garage. | $30,000 | |
| Jan 6, 2014 | Completed final sign-off Jun 2014 | 2362 20th Av | John Jin Hang Wai | add a storage room, an office and a toilet at ground floor. to comply with 201343101Details
add a storage room, an office and a toilet at ground floor. to comply with 201343101 | $15,000 |
| Jan 6, 2014 | Completed final sign-off Jun 2014 | 1435 21st Av | John Jin Hang Wai | add rooms at ground floor. comply w/sfgbc table 4Details
add rooms at ground floor. comply w/sfgbc table 4 | $25,000 |
| Dec 12, 2013 | Completed final sign-off Dec 2013 | 220 Turk St | John Jin Hang Wai | submit as built plan for approved stair construction. revision per pa# 2013-0509-6482Details
submit as built plan for approved stair construction. revision per pa# 2013-0509-6482 | $300 |
| Nov 19, 2013 | Expired or cancelled cancelled Jan 2023 | 2723 37th Av | remove non permit build kitchen at ground floor storage area.Details
remove non permit build kitchen at ground floor storage area. | $5,000 | |
| Oct 15, 2013 | Completed final sign-off May 2018 | 2547 Noriega St | convert (e) vacant grocery store space to a full service restaurant.Details
convert (e) vacant grocery store space to a full service restaurant. | $20,000 | |
| Oct 15, 2013 | Completed final sign-off Feb 2015 | 235 Oak Park Dr | add rooms + bathroom at rear of (e)garage level.add a 2nd fl deckDetails
add rooms + bathroom at rear of (e)garage level.add a 2nd fl deck | $75,000 | |
| Oct 4, 2013 | Expired or cancelled withdrawn Jul 2014 | 2151 Irving St | convert one extg vacant office to employment office. remodel extg toilet and shower become accessible. to comply with nov dated 9/5/13Details
convert one extg vacant office to employment office. remodel extg toilet and shower become accessible. to comply with nov dated 9/5/13 | $25,000 | |
| Oct 3, 2013 | Completed final sign-off Apr 2014 | 2157 Polk St | convert (e) kitchen area into an accessible toilet & use (e) toilet space as kitchen in an existing restaurant.Details
convert (e) kitchen area into an accessible toilet & use (e) toilet space as kitchen in an existing restaurant. | $5,000 | |
| Aug 20, 2013 | Completed final sign-off May 2014 | 2022 22nd Av | remodel 2nd floor-2 bathrooms & kitchen. add a rear deck & stairs to back yard. add 2 bedrooms, 1 family room, 1 game room & a bathroom at ground floorDetails
remodel 2nd floor-2 bathrooms & kitchen. add a rear deck & stairs to back yard. add 2 bedrooms, 1 family room, 1 game room & a bathroom at ground floor | $30,000 | |
| Aug 19, 2013 | Expired or cancelled cancelled Jan 2026 | 710 Post St | convert extg day spa with accessory massage to full massage establishment.Details
convert extg day spa with accessory massage to full massage establishment. | $1,000 | |
| Jul 29, 2013 | Completed final sign-off Nov 2013 | 3332 Taraval St | C T Construction & Plumb | remodel (e) ground floor unit-relocate (e) water heater, furnaces & (e) kitchen. add 1 hour fire rated wall exit corridor. add new furnace.Details
remodel (e) ground floor unit-relocate (e) water heater, furnaces & (e) kitchen. add 1 hour fire rated wall exit corridor. add new furnace. | $20,000 |
| Jul 11, 2013 | Completed final sign-off Jul 2014 | 79 Inverness Dr | Spectrum Development Co. | add 1 bedroom, 1 family room & 1 bathroom at ground floorDetails
add 1 bedroom, 1 family room & 1 bathroom at ground floor | $20,000 |
| Jun 26, 2013 | Completed final sign-off Sep 2014 | 463 17th Av | Gil Construction & Assoc Inc. | cap (e) north side (e) foundation approx, 35lf, support (e) north side (e) bldg, before start work.Details
cap (e) north side (e) foundation approx, 35lf, support (e) north side (e) bldg, before start work. | $2,000 |
| Jun 25, 2013 | Completed final sign-off Jul 2013 | 139 Noe St | Speedy Construction ****See Note | revision to pa# 2013-0522-7623-add bracing & repair details to dry rot repairs to (e) rear deck & stairsDetails
revision to pa# 2013-0522-7623-add bracing & repair details to dry rot repairs to (e) rear deck & stairs | $3,000 |
| Jun 24, 2013 | Completed final sign-off Aug 2013 | 2115 Quesada Av | build a rear deck from 2nd floor to rear yard. convert 2nd floor one of rear bedroom window into a sliding door. to comply with complaint # 201308241Details
build a rear deck from 2nd floor to rear yard. convert 2nd floor one of rear bedroom window into a sliding door. to comply with complaint # 201308241 | $5,000 | |
| Jun 19, 2013 | Completed final sign-off Jan 2014 | 706 Sacramento St | Greatwall Building Construction Inc | convert (e) vacant bookstore into an accupuncture doctors officeDetails
convert (e) vacant bookstore into an accupuncture doctors office | $20,000 |
| Jun 13, 2013 | Expired or cancelled expired Jun 2020 | 471 40th Av | Western City Construction Co | add a bedroom, a family room and a bathroom at ground floorDetails
add a bedroom, a family room and a bathroom at ground floor | $20,000 |
| May 23, 2013 | Completed final sign-off Mar 2014 | 621 24th Av | Project Contractor Inc | remodel ground floor-(e) family room into 2 guest bedrooms, add 2 half bathrooms & 1 storage room at ground floorDetails
remodel ground floor-(e) family room into 2 guest bedrooms, add 2 half bathrooms & 1 storage room at ground floor | $20,000 |
| May 22, 2013 | Completed final sign-off Jul 2013 | 139 Noe St | Speedy Construction ****See Note | dryrot repair (e) rear deck and stairs for residence to back yard. build a one hour rated wall at property line with redwood siding to mtach (e).Details
dryrot repair (e) rear deck and stairs for residence to back yard. build a one hour rated wall at property line with redwood siding to mtach (e). | $4,000 |
| May 15, 2013 | Completed final sign-off Apr 2014 | 415 Tehama St | Markoff Structural Pest Control | dry rot repair extg at rear 2nd exit stairs and replace some extg concrete footings to comply with complaint #201261521 and 201264601.Details
dry rot repair extg at rear 2nd exit stairs and replace some extg concrete footings to comply with complaint #201261521 and 201264601. | $53,000 |
| May 9, 2013 | Completed final sign-off Dec 2013 | 220 Turk St | John Jin Hang Wai | change of use, add a new stair from ground floor retail to store to (e) basement storage. remodel retail store front entrance to become level landing. handicapp accessible entranceDetails
change of use, add a new stair from ground floor retail to store to (e) basement storage. remodel retail store front entrance to become level landing. handicapp accessible entrance | $2,000 |
| May 6, 2013 | Expired or cancelled cancelled Oct 2013 | 184 Francisco St | Gil Construction & Assoc Inc. | unit # 5:remove upper portion of extg partition between extg kitchen and extg living on extg 2nd floor.Details
unit # 5:remove upper portion of extg partition between extg kitchen and extg living on extg 2nd floor. | $2,000 |
| Apr 26, 2013 | Completed final sign-off Apr 2014 | 2817 San Bruno Av | W. Wong Construction Co. Inc. | abate nov# 201238223-repair fire damage buildingDetails
abate nov# 201238223-repair fire damage building | $70,000 |
| Apr 22, 2013 | Expired or cancelled cancelled Jan 2026 | 1331 47th Av | legalize extg sun room, bedroom,family room, storage room and a bath at rear portion of extg ground floor.Details
legalize extg sun room, bedroom,family room, storage room and a bath at rear portion of extg ground floor. | $15,000 | |
| Apr 16, 2013 | Completed final sign-off Jun 2013 | 110 Loehr St | Innovative Construction & Design Co. | add rooms & bathroom at ground floor.Details
add rooms & bathroom at ground floor. | $15,000 |
| Apr 16, 2013 | Expired or cancelled cancelled Jan 2026 | 1336 45th Av | remodel ground floor (e) study room, family room and full bath at rear of (e) garage level. remodel (e) bathroom 2nd floor. convert (e) bath tub to shower.Details
remodel ground floor (e) study room, family room and full bath at rear of (e) garage level. remodel (e) bathroom 2nd floor. convert (e) bath tub to shower. | $15,000 | |
| Apr 12, 2013 | Never finaled issued Aug 2013, no final | 2843 Mission St | Lee Family Corp | move (e) both front entrance doors to upstairs apt. approx 6" to front.Details
move (e) both front entrance doors to upstairs apt. approx 6" to front. | $500 |
| Apr 8, 2013 | Expired or cancelled cancelled Jan 2026 | 1331 47th Av | add a 15'x7' rear decks 2nd floor bedroom to back yard with a stair from the deck to backyard; convert 2nd floor bedroom window to a 60x80 sliding with 4x8 header.Details
add a 15'x7' rear decks 2nd floor bedroom to back yard with a stair from the deck to backyard; convert 2nd floor bedroom window to a 60x80 sliding with 4x8 header. | $6,000 | |
| Mar 29, 2013 | Completed final sign-off Oct 2013 | 242 Divisadero St | Gil Construction & Assoc Inc. | additional concrete foundation & concrete slab to approved pa# 2012-1119-4496Details
additional concrete foundation & concrete slab to approved pa# 2012-1119-4496 | $8,000 |
| Mar 25, 2013 | Expired or cancelled expired Aug 2019 | 714 Monterey Bl | convert (e) vacant full service bar into an art studio; convert (e) toilet to accessible toilet.Details
convert (e) vacant full service bar into an art studio; convert (e) toilet to accessible toilet. | $8,000 | |
| Mar 25, 2013 | Completed final sign-off Jul 2013 | 716 Monterey Bl | 2nd floor front unit - remove illegal built partitoin to divided front bedroom into two, now restore to original. to partially comply with nov #201387963 as noted on plan.Details
2nd floor front unit - remove illegal built partitoin to divided front bedroom into two, now restore to original. to partially comply with nov #201387963 as noted on plan. | $1,000 | |
| Mar 22, 2013 | Completed final sign-off Sep 2013 | 711 Cambridge St | legalize (e) family room and a bath at ground floor. remodel existing kitchen, add bath, remodel bath on 2nd floor. to comply with nov# 200867361Details
legalize (e) family room and a bath at ground floor. remodel existing kitchen, add bath, remodel bath on 2nd floor. to comply with nov# 200867361 | $10,000 | |
| Mar 15, 2013 | Never finaled issued Mar 2013, no final | 604 Russia Av | World Construction Co. | legalize rooms at ground floor: 2 bedrooms, 2 storage rooms & a toilet.Details
legalize rooms at ground floor: 2 bedrooms, 2 storage rooms & a toilet. | $20,000 |
| Feb 13, 2013 | Completed final sign-off Jun 2013 | 138 Niagara Av | legalize (e) family room, master bedroom with a full bath and walk-in closet at ground floor. add 2nd floor rear deck & convert one window into a glass door to step out to (n) deck. to comply with nov# 201386013. remodel rear storage shedDetails
legalize (e) family room, master bedroom with a full bath and walk-in closet at ground floor. add 2nd floor rear deck & convert one window into a glass door to step out to (n) deck. to comply with nov# 201386013. remodel rear storage shed | $15,000 | |
| Feb 4, 2013 | Never finaled issued Feb 2013, no final | 767 Tehama St | to comply with complaint #201247141 - remodel (e) kitchen at rear of (e) unit.Details
to comply with complaint #201247141 - remodel (e) kitchen at rear of (e) unit. | $10,000 | |
| Feb 4, 2013 | Expired or cancelled expired Jan 2022 | 769 Tehama St | to comply with nov 200562232, 200732433, 200790045 remodel 2nd floor 2 unit extg bathrooms and kitchen, patch up holes on walls. to comply with nov 201168472. repair front stair 1st 2 steps and dryrot repair rear stairDetails
to comply with nov 200562232, 200732433, 200790045 remodel 2nd floor 2 unit extg bathrooms and kitchen, patch up holes on walls. to comply with nov 201168472. repair front stair 1st 2 steps and dryrot repair rear stair | $12,000 | |
| Jan 11, 2013 | Completed final sign-off Apr 2013 | 232 Theresa St | Macro Builder Inc | remodel (e) ground floor, family room and bedroom, remove (e) full bath, add a toilet in (e) family room, replace 2 rear windows.Details
remodel (e) ground floor, family room and bedroom, remove (e) full bath, add a toilet in (e) family room, replace 2 rear windows. | $12,000 |
| Jan 4, 2013 | Completed final sign-off May 2013 | 4268 22nd St | add an electrical panel at ground floor, remodel (e) kitchen at 2nd floor. convert/legalize 2 bedrooms into a master bedroom & full bathroom on 3rd floor (attic)Details
add an electrical panel at ground floor, remodel (e) kitchen at 2nd floor. convert/legalize 2 bedrooms into a master bedroom & full bathroom on 3rd floor (attic) | $15,000 | |
| Jan 4, 2013 | Completed final sign-off Mar 2013 | 443 Plymouth Av | add 2 bedrooms, 2 bathrooms, 1 storage at ground floor (garage). replace water heater at ground floorDetails
add 2 bedrooms, 2 bathrooms, 1 storage at ground floor (garage). replace water heater at ground floor | $20,000 | |
| Dec 28, 2012 | Completed final sign-off Mar 2013 | 675 Noriega St | Traube Construction Company | remodel (e) kitchen, replacing (e) cabinets & counter tops. replace one (e) 2x6 support post with 6x6 post.Details
remodel (e) kitchen, replacing (e) cabinets & counter tops. replace one (e) 2x6 support post with 6x6 post. | $5,000 |
| Dec 21, 2012 | Completed final sign-off Nov 2013 | 338 19th Av | remodel (e) kitchen, convert (e) one bath & toilet into two baths on 3rd floor unit. convert dining room to new bedroom.Details
remodel (e) kitchen, convert (e) one bath & toilet into two baths on 3rd floor unit. convert dining room to new bedroom. | $5,000 | |
| Dec 20, 2012 | Completed final sign-off Apr 2013 | 1222 11th Av | revision to appl #2012.0312.5858 for (e) kitchen & bath remodel.Details
revision to appl #2012.0312.5858 for (e) kitchen & bath remodel. | ||
| Dec 3, 2012 | Completed final sign-off Sep 2013 | 2600 47th Av | add a bedroom, family room & full bath. repair (e) concrete slab & relocate (e) water heater. all work at ground floor. remove rear yard enclosure.Details
add a bedroom, family room & full bath. repair (e) concrete slab & relocate (e) water heater. all work at ground floor. remove rear yard enclosure. | $10,000 | |
| Nov 21, 2012 | Never finaled issued Dec 2012, no final | 615 Minna St | comply with compaint #201228501-replace rotted rear stair, landing & porch. replace rotted wood members with p.t wood or redwood. replace entire rear stair structure, see attached photosDetails
comply with compaint #201228501-replace rotted rear stair, landing & porch. replace rotted wood members with p.t wood or redwood. replace entire rear stair structure, see attached photos | $5,000 | |
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 90 Stoneybrook Av | J C M Construction Inc. | remove one story non-permit built rear addition, legalize one (e) storage room and a bath at ground floor, to comply with n.o.v. 201163387.Details
remove one story non-permit built rear addition, legalize one (e) storage room and a bath at ground floor, to comply with n.o.v. 201163387. | $20,000 |
| Nov 19, 2012 | Completed final sign-off Oct 2013 | 242 Divisadero St | Gil Construction & Assoc Inc. | replace (e) concrete foundation & some concrete footings with reinforced concrete foundation & footingsDetails
replace (e) concrete foundation & some concrete footings with reinforced concrete foundation & footings | $10,000 |
| Nov 6, 2012 | Completed final sign-off May 2013 | 230 Santa Paula Av | S F Bay Construction Inc | revision to app#201208097007. replace extg foundation with new reinforced concrete foundation.Details
revision to app#201208097007. replace extg foundation with new reinforced concrete foundation. | $100,000 |
| Oct 31, 2012 | Completed final sign-off Jun 2013 | 3414 22nd St | convert (e) vacant retail pots & pans store into a coff & bakery take out shop (no cooking.) mechanical will be seperate permit.Details
convert (e) vacant retail pots & pans store into a coff & bakery take out shop (no cooking.) mechanical will be seperate permit. | $15,000 | |
| Oct 22, 2012 | Completed final sign-off Apr 2014 | 28 Crestlake Dr | remodel (e) kitchen, remove (e) brick chimey, convert (e) bath into two baths on 2nd floor. convert (e) family room into one bedroom and one family room on ground floor. remodel (e) full baht, remove (e) brick fireplace at rear portion of (e) garage level.Details
remodel (e) kitchen, remove (e) brick chimey, convert (e) bath into two baths on 2nd floor. convert (e) family room into one bedroom and one family room on ground floor. remodel (e) full baht, remove (e) brick fireplace at rear portion of (e) garage level. | $20,000 | |
| Oct 12, 2012 | Completed final sign-off Jun 2013 | 567 Athens St | comply with complaint# 201041493-add 2 storage rooms & half bathroom on ground floor (garage)Details
comply with complaint# 201041493-add 2 storage rooms & half bathroom on ground floor (garage) | $10,000 | |
| Oct 11, 2012 | Completed final sign-off Oct 2013 | 1108 Stockton St | Jd Construction | repair extg toilet in extg market to become accessible toilet. replace extg toilet hand sin and floor tile with 3/8" radius cove tile base min 6" up to extg walls. to comply with complaint #201269303Details
repair extg toilet in extg market to become accessible toilet. replace extg toilet hand sin and floor tile with 3/8" radius cove tile base min 6" up to extg walls. to comply with complaint #201269303 | $12,000 |
| Oct 10, 2012 | Completed final sign-off Oct 2012 | 1731 Buchanan St | no change on (e) condition of building. usage change from law office (b-10) to skincare (b-33) spaceDetails
no change on (e) condition of building. usage change from law office (b-10) to skincare (b-33) space | ||
| Oct 5, 2012 | Completed final sign-off Apr 2013 | 1484 Portola Dr | Peter Liu Construction Inc | remodel (e) kitchen & bathroom on 1st floor, replace (e) concrete foundation with reinforced concrete foundation & (e) concrete slab with water proof membranes under in (e) garage levelDetails
remodel (e) kitchen & bathroom on 1st floor, replace (e) concrete foundation with reinforced concrete foundation & (e) concrete slab with water proof membranes under in (e) garage level | $25,000 |
| Oct 2, 2012 | Expired or cancelled cancelled Feb 2024 | 1674 Fulton St | remodel extg rear unit only: relocate extg kitchen and living rooms to ground floor. remove extg exterior stair to 2nd floor. build an interior stairs,add one bathroom at 2nd floor. convert extg living room to a new bedroom on 2nd floor. reinforce extg foundation and structural.Details
remodel extg rear unit only: relocate extg kitchen and living rooms to ground floor. remove extg exterior stair to 2nd floor. build an interior stairs,add one bathroom at 2nd floor. convert extg living room to a new bedroom on 2nd floor. reinforce extg foundation and structural. | $50,000 | |
| Sep 25, 2012 | Completed final sign-off Jan 2013 | 2530 33rd Av | Peter Liu Construction Inc | add a bath and 3 storage areas at ground floor.Details
add a bath and 3 storage areas at ground floor. | $15,000 |
| Sep 24, 2012 | Completed final sign-off Dec 2012 | 3783 20th St | Markoff Structural Pest Control | dryrot repair (e) roof deck for the top unit. replace rotted wood members with pt wood or red wood, same size. to comply with nov#201261541 dated 9/11/12.Details
dryrot repair (e) roof deck for the top unit. replace rotted wood members with pt wood or red wood, same size. to comply with nov#201261541 dated 9/11/12. | $3,000 |
| Sep 17, 2012 | Completed final sign-off Dec 2013 | 726 Ellsworth St | convert (e) storage into a storage room & a bath, the other (e) storage to remain.Details
convert (e) storage into a storage room & a bath, the other (e) storage to remain. | $5,000 | |
| Sep 12, 2012 | Completed final sign-off Dec 2012 | 6255 Geary Bl | voluntary remodel (e) two baths into h.c accessible. all work is barrier removal.Details
voluntary remodel (e) two baths into h.c accessible. all work is barrier removal. | $15,000 | |
| Sep 12, 2012 | Never finaled issued Jul 2013, no final | 871 24th Av | this two stories sfd rooms are legally built under approved pa# 2000/09/27/1648 & pa# 2001/09/24/9056. now add a kitchen & a hallway @ grount floor. to legalize ground floor unit for rh-2 zoning area.Details
this two stories sfd rooms are legally built under approved pa# 2000/09/27/1648 & pa# 2001/09/24/9056. now add a kitchen & a hallway @ grount floor. to legalize ground floor unit for rh-2 zoning area. | $8,000 | |
| Sep 10, 2012 | Completed final sign-off Sep 2014 | 1979 42nd Av | remodel (e) front entrance patio and add a side & rear deck to (e) house, rear deck with a stair to back yard.Details
remodel (e) front entrance patio and add a side & rear deck to (e) house, rear deck with a stair to back yard. | $5,000 | |
| Aug 21, 2012 | Completed final sign-off Dec 2012 | 210 Rolph St | comply with complaint 201255263. legalize e storage, utility and laundry room and full bath at ground floor.Details
comply with complaint 201255263. legalize e storage, utility and laundry room and full bath at ground floor. | $20,000 | |
| Aug 20, 2012 | Completed final sign-off Nov 2012 | 1455 Sacramento St | Peter Liu Construction Inc | apt. #3: remodel apt 3 on 2nd floor, remodel (e) bath, add a (n) bath, convert (e) living room to a (n) bedroom, replace some cabinets in (e) kitchen for apt #3 only.Details
apt. #3: remodel apt 3 on 2nd floor, remodel (e) bath, add a (n) bath, convert (e) living room to a (n) bedroom, replace some cabinets in (e) kitchen for apt #3 only. | $15,000 |
| Aug 17, 2012 | Completed final sign-off Dec 2012 | 210 Rolph St | remodel (e) kitchen 2nd floor , replace cabinets, countertop & floor tiles. for complaint # 201255263 under separate permit.Details
remodel (e) kitchen 2nd floor , replace cabinets, countertop & floor tiles. for complaint # 201255263 under separate permit. | $8,000 | |
| Aug 14, 2012 | Completed final sign-off Nov 2012 | 1845 Market St | I.D.O.Construction Inc. | convert e retail store into nail beauty store, remodel bathDetails
convert e retail store into nail beauty store, remodel bath | $20,000 |
| Aug 9, 2012 | Completed final sign-off Nov 2012 | 485 04th Av | to comply with complaint #200681717 to remove side stair plastic enclosure and windows on plastic enclosure.Details
to comply with complaint #200681717 to remove side stair plastic enclosure and windows on plastic enclosure. | $500 | |
| Jul 30, 2012 | Completed final sign-off Aug 2016 | 1767 North Point St | 1 story rear addition to become living room. building is (e) 3 unit, 3 story. new fire sprinkler system per nfpa 13r (unit) and 13 (passageway) in expanded ground floor unit and (n) egress passageway provided under separate permit. see ref legal description, bldg is an (e) r-2, 3 unit bldg.Details
1 story rear addition to become living room. building is (e) 3 unit, 3 story. new fire sprinkler system per nfpa 13r (unit) and 13 (passageway) in expanded ground floor unit and (n) egress passageway provided under separate permit. see ref legal description, bldg is an (e) r-2, 3 unit bldg. | $30,000 | |
| Jul 23, 2012 | Completed final sign-off Feb 2013 | 615 Moscow St | to comply with nov# 201246841 dated 7/13/12 - legalize (e) bedroom, bathroom & hallway on ground floorDetails
to comply with nov# 201246841 dated 7/13/12 - legalize (e) bedroom, bathroom & hallway on ground floor | $10,000 | |
| Jul 20, 2012 | Completed final sign-off Nov 2012 | 2138 35th Av | Bing Shou Louie(Louie Bing Shou Constr) | add a bedroom, a family room & a bath at rear of (e) garage level.Details
add a bedroom, a family room & a bath at rear of (e) garage level. | $20,000 |
| Jul 12, 2012 | Completed final sign-off Oct 2012 | 2166 27th Av | K & K Construction | convert e family room into a new bedroom, add a new bath & hallway at rear of e garage level. convert part of e bath and e closet to a toilet on 2nd floorDetails
convert e family room into a new bedroom, add a new bath & hallway at rear of e garage level. convert part of e bath and e closet to a toilet on 2nd floor | $12,000 |
| Jul 11, 2012 | Completed final sign-off Mar 2014 | 460 Hamilton St | Adam's General Construction | comply with complaint #201153231-remodel (e) kitchen, bathrooms, laundry area. add toilet at ground floor, convert (e) family room to a bedroom with a bathroom & closet on 2nd floor. voluntary reinforce 9e) wood frame structureDetails
comply with complaint #201153231-remodel (e) kitchen, bathrooms, laundry area. add toilet at ground floor, convert (e) family room to a bedroom with a bathroom & closet on 2nd floor. voluntary reinforce 9e) wood frame structure | $40,000 |
| Jul 5, 2012 | Expired or cancelled withdrawn Jan 2019 | 2362 42nd Av | remove illegal built kitchen at ground floor.Details
remove illegal built kitchen at ground floor. | $1,000 |