I.D.O.Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2008 to Nov 2015
- Last 24 months
- 0 permits filed
61 permits since 2000: 56 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2015 | Completed final sign-off Aug 2016 | 127 Cotter St | kitchen remodeling. upgrade electrical and plumbing as need. no structural work.Details
kitchen remodeling. upgrade electrical and plumbing as need. no structural work. | $15,000 |
| Nov 2, 2015 | Completed final sign-off May 2016 | 758 Clayton St | replace gas fire place, ul listed, direct vent, install per mfr's installation requirements; update elec & plumb. as neededDetails
replace gas fire place, ul listed, direct vent, install per mfr's installation requirements; update elec & plumb. as needed | $10,000 |
| May 26, 2015 | Completed final sign-off Aug 2018 | 259 Duncan St | kitchen & bath remodel: replace cabinet, sink, counter top, appliances, install shower pan, tile, update electrical, & plumbing. no structural work.Details
kitchen & bath remodel: replace cabinet, sink, counter top, appliances, install shower pan, tile, update electrical, & plumbing. no structural work. | $40,000 |
| Mar 10, 2015 | Completed final sign-off Mar 2016 | 1655 Chestnut St | kitchen, hall bath remodeling, replace cabinet, tile, appliances, sinks, install new lighting, install hardwood floor. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13Details
kitchen, hall bath remodeling, replace cabinet, tile, appliances, sinks, install new lighting, install hardwood floor. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13 | $30,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 75 Seward St | master bath remodeling, replace cabinet, sink, toilet, tile, faucet, install shower pan, patch and paint. same area of the floor.Details
master bath remodeling, replace cabinet, sink, toilet, tile, faucet, install shower pan, patch and paint. same area of the floor. | $18,000 |
| Mar 10, 2015 | Completed final sign-off Oct 2015 | 2200 Sacramento St | kitchen & 2 baths remodeling, replace hardwood floor, cabinet, sink, toilet, tub, faucets, new shower pan, washer, dryer, patch & paint. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13Details
kitchen & 2 baths remodeling, replace hardwood floor, cabinet, sink, toilet, tub, faucets, new shower pan, washer, dryer, patch & paint. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13 | $60,000 |
| Mar 10, 2015 | Completed final sign-off May 2015 | 191 Carnelian Wy | hall bath remodeling, replace tub, tile, cabinet, sink, toilet, faucet, patch and paint. same area of the floor.Details
hall bath remodeling, replace tub, tile, cabinet, sink, toilet, faucet, patch and paint. same area of the floor. | $15,000 |
| Dec 16, 2014 | Completed final sign-off Dec 2015 | 25 Graystone Tr | bathroom remodeling. replace tile, tiolet, sink, bath tub, install lighting.Details
bathroom remodeling. replace tile, tiolet, sink, bath tub, install lighting. | $10,000 |
| Dec 3, 2014 | Completed final sign-off Jul 2016 | 758 Clayton St | rebuild deteriorated existing stair in-kind at rear of the house.Details
rebuild deteriorated existing stair in-kind at rear of the house. | $20,000 |
| Dec 1, 2014 | Completed final sign-off Apr 2015 | 40 Merced Av | install new master bath. renovate extg guest bath. install new lighting. install inset window back of house in extg location. install new skylight.Details
install new master bath. renovate extg guest bath. install new lighting. install inset window back of house in extg location. install new skylight. | $130,000 |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 1380 Greenwich St | kitchen remodeling: replace cabinet, sink, faucet, sink, counter top. appliances, patach and paint. no structural work no modification of walls. all work is within unit# 303Details
kitchen remodeling: replace cabinet, sink, faucet, sink, counter top. appliances, patach and paint. no structural work no modification of walls. all work is within unit# 303 | $9,000 |
| Apr 22, 2014 | Completed final sign-off Aug 2015 | 1655 Chestnut St | master bath remodeling: replace existing tile, cabinets, sink faucet, install new shower pan, toilet. install lighting, patch on paint, size 5'x8'x3"Details
master bath remodeling: replace existing tile, cabinets, sink faucet, install new shower pan, toilet. install lighting, patch on paint, size 5'x8'x3" | $8,000 |
| Feb 20, 2014 | Completed final sign-off May 2014 | 1650 Jackson St | bathroom remodeling: replace tile, faucet update electrical and plumbing. install new lighting, fan and heated floor., patch and paint. lighting to comply with cec 150(k) maintain 1 hr separation between units.Details
bathroom remodeling: replace tile, faucet update electrical and plumbing. install new lighting, fan and heated floor., patch and paint. lighting to comply with cec 150(k) maintain 1 hr separation between units. | $7,000 |
| Feb 14, 2014 | Completed final sign-off Jun 2014 | 203 Central Av | kitchen remodeling: repl cabinet coutner top, update electrical & plumbing, install lighting patch and paint, at upstairs unitDetails
kitchen remodeling: repl cabinet coutner top, update electrical & plumbing, install lighting patch and paint, at upstairs unit | $12,000 |
| Dec 27, 2013 | Completed final sign-off Mar 2014 | 191 Carnelian Wy | remodel kitchen and bathroom. to comply with cec150(k) 8 & 10; kitchen: replace all cabinets, countertop, sink, faucet, appliance install lighting, update electrical, plumbing as needed; bathroom: replace cabinets, counter top sink faucet, tile install lighting tile and shower pan, update elec asDetails
remodel kitchen and bathroom. to comply with cec150(k) 8 & 10; kitchen: replace all cabinets, countertop, sink, faucet, appliance install lighting, update electrical, plumbing as needed; bathroom: replace cabinets, counter top sink faucet, tile install lighting tile and shower pan, update elec as | $30,000 |
| Nov 25, 2013 | Completed final sign-off May 2014 | 2109 Bush St | bathroom remodeling: replace bath tub , tile cabinet sink, faucet tiolet. update electrical and plumbing patch and paint. size 5'x 8'Details
bathroom remodeling: replace bath tub , tile cabinet sink, faucet tiolet. update electrical and plumbing patch and paint. size 5'x 8' | $12,677 |
| Nov 4, 2013 | Completed final sign-off Sep 2014 | 25 Graystone Tr | unit #25 only - living room remodeling (400 sq.ft.): replace hardwood floor, (ul listed installed perm mfrs installation requirement), install new recess light, patch and paint.Details
unit #25 only - living room remodeling (400 sq.ft.): replace hardwood floor, (ul listed installed perm mfrs installation requirement), install new recess light, patch and paint. | $7,000 |
| Jul 12, 2013 | Completed final sign-off Oct 2013 | 1 Daniel Burnham Ct | kitchen and bath remodeling: demolish existgin cabinet counter top, tile, sink, update electrical, plumbing, install new cabine, tile, appliance, recess lights, patch and paint. (no windows, no door)Details
kitchen and bath remodeling: demolish existgin cabinet counter top, tile, sink, update electrical, plumbing, install new cabine, tile, appliance, recess lights, patch and paint. (no windows, no door) | $20,000 |
| May 20, 2013 | Completed final sign-off Aug 2013 | 2409 Green St | changing front windows. wood windows u-factor 0.4 maxDetails
changing front windows. wood windows u-factor 0.4 max | $3,500 |
| Apr 11, 2013 | Completed final sign-off Apr 2013 | 1857 Pine St | revision to app# 201301228419, only 1/2 bath been remodeling, cancel remodeling of full bath, reduction scope of work no plansDetails
revision to app# 201301228419, only 1/2 bath been remodeling, cancel remodeling of full bath, reduction scope of work no plans | |
| Mar 26, 2013 | Completed final sign-off Jul 2013 | 430 Masonic Av | kitchen remodeling - replace existing cabinet, counter top and appliances, install hardwood floor in kitchen area. update electrical and plumbing as needed. patch and paint. lighting change will comply w/cec 150(k).Details
kitchen remodeling - replace existing cabinet, counter top and appliances, install hardwood floor in kitchen area. update electrical and plumbing as needed. patch and paint. lighting change will comply w/cec 150(k). | $15,000 |
| Mar 13, 2013 | Completed final sign-off Apr 2013 | 624 Congo St | bath remodel - rpelace (e) fixtures and tile (no structural), replace shower pan (1 bath room remodel)Details
bath remodel - rpelace (e) fixtures and tile (no structural), replace shower pan (1 bath room remodel) | $15,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 55 Sussex St | kitchen remodeling: replace exiting cabinet, counter top update electrical plumbing as needed, install new appliance, cabinet and counter topDetails
kitchen remodeling: replace exiting cabinet, counter top update electrical plumbing as needed, install new appliance, cabinet and counter top | $18,000 |
| Jan 22, 2013 | Completed final sign-off Apr 2013 | 1857 Pine St | exiting full bath and half bath remodeling, replace exiting tu b toilet, tile and sink, update electrical plumbing, patch and paintDetails
exiting full bath and half bath remodeling, replace exiting tu b toilet, tile and sink, update electrical plumbing, patch and paint | $15,000 |
| Nov 8, 2012 | Completed final sign-off Apr 2013 | 3049 California St | bathroom remodeling: demolishing (e) shower, tile,vanity. install new shower pan, tile, faucet, sink, update electrical as needed. size: 3'-6"x8'. lighting must comply with cec 150(k)Details
bathroom remodeling: demolishing (e) shower, tile,vanity. install new shower pan, tile, faucet, sink, update electrical as needed. size: 3'-6"x8'. lighting must comply with cec 150(k) | $8,000 |
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 1650 Jackson St | kitchen and bath remodel. demolish existing cabinet couter top, tile, sink and appliance. update electrical, plumbing as needed. new cagints, counter, tile, sink, toilet, appliancesDetails
kitchen and bath remodel. demolish existing cabinet couter top, tile, sink and appliance. update electrical, plumbing as needed. new cagints, counter, tile, sink, toilet, appliances | $30,000 |
| Sep 26, 2012 | Completed final sign-off Sep 2013 | 675 Congo St | 2nd fl bathroom remodeling. demo (e) tile, sink, toilet, upgrade electrical, install new tile, sink fan and toilet, patch and paint ground floor. demo some non load bearing wall new closet bathroom, luandry room. replace uwater water and furnace, updage electrical and plumbing. reinforce (e) beamDetails
2nd fl bathroom remodeling. demo (e) tile, sink, toilet, upgrade electrical, install new tile, sink fan and toilet, patch and paint ground floor. demo some non load bearing wall new closet bathroom, luandry room. replace uwater water and furnace, updage electrical and plumbing. reinforce (e) beam | $30,000 |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 1111 Bay St | kitchen and (2) bathroom remodeling: demolish (e) cabinet counter top, tile, sink, update electrical, plumging. install new cabinet, tile, apppliances, hardwood floors. counter top and new shower pan, patch and paint.Details
kitchen and (2) bathroom remodeling: demolish (e) cabinet counter top, tile, sink, update electrical, plumging. install new cabinet, tile, apppliances, hardwood floors. counter top and new shower pan, patch and paint. | $3,500 |
| Aug 31, 2012 | Completed final sign-off Jul 2013 | 2201 Sacramento St | bathroom remodeling: demolish (e) tle, sink, toilet, iupdate electrical, install new tile, sink, toilet and faucet, patch and paint. no change in partition wall. no windows, doors, ceiling or floors - work on this permit.Details
bathroom remodeling: demolish (e) tle, sink, toilet, iupdate electrical, install new tile, sink, toilet and faucet, patch and paint. no change in partition wall. no windows, doors, ceiling or floors - work on this permit. | $8,000 |
| Aug 31, 2012 | Expired or cancelled cancelled Jan 2026 | 675 Congo St | 2nd floor bath room remodeling:demolish extg tile sink, toilet. install new tile sink faucet, fan, and toilet, patch and paint 1st floor. demolish some non oad bearing wall. building new closet. bathroom, laundry room. replace water heater and heater. update electrical and plumbing patch and paintDetails
2nd floor bath room remodeling:demolish extg tile sink, toilet. install new tile sink faucet, fan, and toilet, patch and paint 1st floor. demolish some non oad bearing wall. building new closet. bathroom, laundry room. replace water heater and heater. update electrical and plumbing patch and paint | $30,000 |
| Aug 14, 2012 | Completed final sign-off Nov 2012 | 1845 Market St | convert e retail store into nail beauty store, remodel bathDetails
convert e retail store into nail beauty store, remodel bath | $20,000 |
| Jun 14, 2012 | Completed final sign-off Sep 2012 | 40 Merced Av | revision to app#201202073700. revise center beam on roof.Details
revision to app#201202073700. revise center beam on roof. | |
| May 16, 2012 | Expired or cancelled expired Jan 2021 | 27 Sutro Heights Av | renovation & addition of both units.Details
renovation & addition of both units. | $400,000 |
| Apr 20, 2012 | Completed final sign-off Aug 2012 | 3 Mccormick St | kitchen remodel - replace cabinets, appliances, lighting, add new sub panel, replace new hood, enlarge window & replace window with 2 new windows @ east side front of house.Details
kitchen remodel - replace cabinets, appliances, lighting, add new sub panel, replace new hood, enlarge window & replace window with 2 new windows @ east side front of house. | $50,000 |
| Feb 7, 2012 | Completed final sign-off Sep 2012 | 40 Merced Av | kitcenn remodel. demolish existing cabinet and appliance. sink and faucet. change 3 windows. new cabinet appliances and counter top. update electrical. new recessed light. install stove hood. patch and paint. remove wall between kitchen and dining rm. new header and footing according to plan.Details
kitcenn remodel. demolish existing cabinet and appliance. sink and faucet. change 3 windows. new cabinet appliances and counter top. update electrical. new recessed light. install stove hood. patch and paint. remove wall between kitchen and dining rm. new header and footing according to plan. | $30,000 |
| Jan 30, 2012 | Completed final sign-off May 2012 | 2409 Green St | bath remodel. demolish existing cabinet,sink,toilet. new shower pan, new tile, cabinet, toilet, counter top, update electrical. new lighting. per cec 150kDetails
bath remodel. demolish existing cabinet,sink,toilet. new shower pan, new tile, cabinet, toilet, counter top, update electrical. new lighting. per cec 150k | $7,000 |
| Aug 25, 2011 | Never finaled issued Aug 2011, no final | 2650 Moraga St | second floor bathroom remodel: remove and replace bath tub, shower, sink, cabinet and toilet. install new tub, new shower pan, new cabinet and toilet, new tiles on floor and walls. patch and paint. same location. no structural work. change light fixtures - high efficacy or occupancy sensor.Details
second floor bathroom remodel: remove and replace bath tub, shower, sink, cabinet and toilet. install new tub, new shower pan, new cabinet and toilet, new tiles on floor and walls. patch and paint. same location. no structural work. change light fixtures - high efficacy or occupancy sensor. | $8,000 |
| Aug 25, 2011 | Completed final sign-off Nov 2011 | 681 Congo St | kitchen remodeling: demolish (e) cabinets and countertop. install (n) cabinets & countertop and faucet. remove and install all appliances. install (8) new recessed lights. patch & paint. same location. no structural work.Details
kitchen remodeling: demolish (e) cabinets and countertop. install (n) cabinets & countertop and faucet. remove and install all appliances. install (8) new recessed lights. patch & paint. same location. no structural work. | $15,000 |
| May 26, 2011 | Completed final sign-off Oct 2011 | 2201 Sacramento St | kitchen remodeling: demo cabinets, coutertop & appliances. update electrical & plumbing to accomodate. (n) appliances & light fixtures, install appliances, cabinets & (n) countertop, patch & paint.Details
kitchen remodeling: demo cabinets, coutertop & appliances. update electrical & plumbing to accomodate. (n) appliances & light fixtures, install appliances, cabinets & (n) countertop, patch & paint. | $25,000 |
| Mar 23, 2011 | Completed final sign-off Sep 2011 | 455 Vallejo St | kitchen & 1 bath remodeling. new lighting comply w/cec 150k. bath: demo old vanity, tub and tile. install new vanity, tub, toilet. install new tile, update electrical and replace (e) pocket door. kitchen: demo old cabinet, carpet and appliance. install new cabinet, counter top and appliance, hardwooDetails
kitchen & 1 bath remodeling. new lighting comply w/cec 150k. bath: demo old vanity, tub and tile. install new vanity, tub, toilet. install new tile, update electrical and replace (e) pocket door. kitchen: demo old cabinet, carpet and appliance. install new cabinet, counter top and appliance, hardwoo | $25,000 |
| Feb 14, 2011 | Completed final sign-off Jun 2011 | 2200 Sacramento St | unit # 207: kitchen remodeling: demo old cabinets and countertops. changing new appliances, install hard wood floors for kitchen, living and hallway. install carpet for bedrooms, patch and paint. install new kitchen cabinets and counter tops. updated new electrical panel.Details
unit # 207: kitchen remodeling: demo old cabinets and countertops. changing new appliances, install hard wood floors for kitchen, living and hallway. install carpet for bedrooms, patch and paint. install new kitchen cabinets and counter tops. updated new electrical panel. | $40,000 |
| Feb 14, 2011 | Completed final sign-off Sep 2011 | 2200 Sacramento St | unit # 906: kitchen and 2 baths remodeling: demo kitchen cabinets and countertops. remove old bath tile. install new kitchen cabinets. new appliances, install hard wood floor in kitchen, living and hallway. install new tile for both bathrooms and new shower pan, patch and paint.Details
unit # 906: kitchen and 2 baths remodeling: demo kitchen cabinets and countertops. remove old bath tile. install new kitchen cabinets. new appliances, install hard wood floor in kitchen, living and hallway. install new tile for both bathrooms and new shower pan, patch and paint. | $50,000 |
| Nov 12, 2010 | Completed final sign-off Mar 2011 | 2200 Sacramento St | unit # 208: two (e) bathroom remodeling: demo old cabinet, floor tile. install new shower pan, tile floor and walls, install new cabinet, new sink and faucet. new ceiling light. patch and paint.Details
unit # 208: two (e) bathroom remodeling: demo old cabinet, floor tile. install new shower pan, tile floor and walls, install new cabinet, new sink and faucet. new ceiling light. patch and paint. | $15,000 |
| Nov 12, 2010 | Completed final sign-off Feb 2011 | 56 Chilton Av | demolishing existing kitchen cabinet and counter top, update electrical, install new recess light, install nwe contract, new c-top new appliance, new sink and faucet, patch and paintDetails
demolishing existing kitchen cabinet and counter top, update electrical, install new recess light, install nwe contract, new c-top new appliance, new sink and faucet, patch and paint | $12,000 |
| Oct 6, 2010 | Completed final sign-off Dec 2010 | 138 Southwood Dr | replace damage wood, apply new stucco exterior on back of the house, 1st floor and paint.Details
replace damage wood, apply new stucco exterior on back of the house, 1st floor and paint. | $7,000 |
| Sep 23, 2010 | Completed final sign-off Jan 2011 | 758 Clayton St | work on #958 only- remodel existing bathroom, demolishing existing tiles, installing new tiles, sink, faucet and bath tub, patching and painting. new lighting comply cec 150(k). no structural changes.Details
work on #958 only- remodel existing bathroom, demolishing existing tiles, installing new tiles, sink, faucet and bath tub, patching and painting. new lighting comply cec 150(k). no structural changes. | $6,000 |
| Sep 23, 2010 | Completed final sign-off Feb 2011 | 2383 26th Av | changing window and interior patch & paint. replace in kind. u-facot=.040, only work on #2383.Details
changing window and interior patch & paint. replace in kind. u-facot=.040, only work on #2383. | $3,000 |
| Aug 31, 2010 | Expired or cancelled expired Feb 2014 | 2200 Sacramento St | unit #1305: kitchen: replace all kitchen cabinet. new appliances, upgrade electricity; bath: changing new cabinet, new tub, tile floor and wall aslong tub and shower. install new shower doors. update new elecgrical panel. install tile floor through out unit. patch and paint.Details
unit #1305: kitchen: replace all kitchen cabinet. new appliances, upgrade electricity; bath: changing new cabinet, new tub, tile floor and wall aslong tub and shower. install new shower doors. update new elecgrical panel. install tile floor through out unit. patch and paint. | $30,000 |
| Aug 3, 2010 | Completed final sign-off Apr 2011 | 2200 Sacramento St | revisions to pa# 2010.06.02.3646. remove wall between two bedrooms, build new wall for closet btn bedrooms. new wall in hall bathroom. enlarge closet in kitchenDetails
revisions to pa# 2010.06.02.3646. remove wall between two bedrooms, build new wall for closet btn bedrooms. new wall in hall bathroom. enlarge closet in kitchen | $4,000 |
| Jun 2, 2010 | Completed final sign-off Apr 2011 | 2200 Sacramento St | kitchen: changing cabinet, install new elec panel, new tile counter, hallway, top update elec provide high efficiency lighting per cec , bath, repl tub, new vanity, counter top, upgrade elec plumb, master bath: install shower, repl new vanity, counter top tiling,update elec .living rm: bedrm: new hDetails
kitchen: changing cabinet, install new elec panel, new tile counter, hallway, top update elec provide high efficiency lighting per cec , bath, repl tub, new vanity, counter top, upgrade elec plumb, master bath: install shower, repl new vanity, counter top tiling,update elec .living rm: bedrm: new h | $40,000 |
| May 27, 2010 | Completed final sign-off Feb 2011 | 1251 32nd Av | relocate half bathroom & wet bar at ground floor to comply with nov #200007421. convert bedroom & study room to laundry room & storage room at ground floor. enlarge garage depth. replace one existing window and add one new window at north wall.Details
relocate half bathroom & wet bar at ground floor to comply with nov #200007421. convert bedroom & study room to laundry room & storage room at ground floor. enlarge garage depth. replace one existing window and add one new window at north wall. | $25,000 |
| May 5, 2010 | Completed final sign-off Jun 2010 | 2200 Sacramento St | Details
| $12,000 |
| Apr 27, 2010 | Completed final sign-off Nov 2010 | 2200 Sacramento St | bathrm remodelinginstall new vanity, new tile, new bath tub, new toilet, install new hardwood floor living and hallway, update new electrical panel, new recessed light, patch & paint; provide high efficiency lights per cec 151Details
bathrm remodelinginstall new vanity, new tile, new bath tub, new toilet, install new hardwood floor living and hallway, update new electrical panel, new recessed light, patch & paint; provide high efficiency lights per cec 151 | $30,000 |
| Feb 17, 2010 | Completed final sign-off Apr 2010 | 138 Southwood Dr | guest bathroom remodeling which includes to install a new door,new tile floor. new toilet,tub, faucets, vanity sliding glass shower and recessed lights. also to update the electric and route and responding to the plumbing. demolishing the extg floor. no structural work.Details
guest bathroom remodeling which includes to install a new door,new tile floor. new toilet,tub, faucets, vanity sliding glass shower and recessed lights. also to update the electric and route and responding to the plumbing. demolishing the extg floor. no structural work. | $8,000 |
| Nov 9, 2009 | Completed final sign-off Jan 2010 | 2200 Sacramento St | kitchen and bthroom remodeling, which include to intall new cabnets, countertop, light fixtures and tiles. also to update the electric and paint the unit # 903Details
kitchen and bthroom remodeling, which include to intall new cabnets, countertop, light fixtures and tiles. also to update the electric and paint the unit # 903 | $30,000 |
| Oct 29, 2009 | Completed final sign-off Dec 2009 | 138 Southwood Dr | kitchen remodeling-remove 9e) cabinets & appliances, install new cabinets & appliances. install casing for 2 windows & 1 door. update electrical wires & plugs. install 3 recessed lightsDetails
kitchen remodeling-remove 9e) cabinets & appliances, install new cabinets & appliances. install casing for 2 windows & 1 door. update electrical wires & plugs. install 3 recessed lights | $18,000 |
| Aug 12, 2009 | Completed final sign-off Oct 2009 | 1650 Jackson St | kitchen & bath remodeling. kitchen- change counter top, cabinet, sink and tile floor, provide min 50% light watts in high afficancy lights. bath- tile floor and shower and one light provide high efficancy lights or "manual on" occupancy sensor.Details
kitchen & bath remodeling. kitchen- change counter top, cabinet, sink and tile floor, provide min 50% light watts in high afficancy lights. bath- tile floor and shower and one light provide high efficancy lights or "manual on" occupancy sensor. | $18,000 |
| Apr 30, 2009 | Completed final sign-off Jul 2009 | 1386 09th Av | remodel 2nd floor unit #3 kitchen and bath. enclose 2 bedrooms, 1 bath foor openings. relocate 2 door openingsDetails
remodel 2nd floor unit #3 kitchen and bath. enclose 2 bedrooms, 1 bath foor openings. relocate 2 door openings | $20,000 |
| Dec 11, 2008 | Completed final sign-off Mar 2009 | 2200 Sacramento St | kitchen and 2 bathrooms remodel remodel change cabinets, change tiles, change vanityDetails
kitchen and 2 bathrooms remodel remodel change cabinets, change tiles, change vanity | $30,000 |
| Sep 29, 2008 | Completed final sign-off Nov 2008 | 80 Hill St | 1 kitchen remodeling new cabinets, new tile floor 100 sqft kitchen: no change to door windows or existing.Details
1 kitchen remodeling new cabinets, new tile floor 100 sqft kitchen: no change to door windows or existing. | $16,850 |
| Sep 15, 2008 | Completed final sign-off Nov 2008 | 150 Lombard St | work @ unit# 804 only. kitchen & bathroom remodel.Details
work @ unit# 804 only. kitchen & bathroom remodel. | $11,000 |