Back to kitchen remodel contractors
I.D.O.Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2008 to Nov 2015
- Last 24 months
- 0 permits filed
61 permits since 2000: 56 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
30 kitchen remodel permits: 28 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2015 | Completed final sign-off Aug 2016 | 127 Cotter St | kitchen remodeling. upgrade electrical and plumbing as need. no structural work.Details
kitchen remodeling. upgrade electrical and plumbing as need. no structural work. | $15,000 |
| May 26, 2015 | Completed final sign-off Aug 2018 | 259 Duncan St | kitchen & bath remodel: replace cabinet, sink, counter top, appliances, install shower pan, tile, update electrical, & plumbing. no structural work.Details
kitchen & bath remodel: replace cabinet, sink, counter top, appliances, install shower pan, tile, update electrical, & plumbing. no structural work. | $40,000 |
| Mar 10, 2015 | Completed final sign-off Mar 2016 | 1655 Chestnut St | kitchen, hall bath remodeling, replace cabinet, tile, appliances, sinks, install new lighting, install hardwood floor. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13Details
kitchen, hall bath remodeling, replace cabinet, tile, appliances, sinks, install new lighting, install hardwood floor. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13 | $30,000 |
| Mar 10, 2015 | Completed final sign-off Oct 2015 | 2200 Sacramento St | kitchen & 2 baths remodeling, replace hardwood floor, cabinet, sink, toilet, tub, faucets, new shower pan, washer, dryer, patch & paint. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13Details
kitchen & 2 baths remodeling, replace hardwood floor, cabinet, sink, toilet, tub, faucets, new shower pan, washer, dryer, patch & paint. in same area of the unit, lighting & control per cec 150(k). n/a ordinance #155-13 | $60,000 |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 1380 Greenwich St | kitchen remodeling: replace cabinet, sink, faucet, sink, counter top. appliances, patach and paint. no structural work no modification of walls. all work is within unit# 303Details
kitchen remodeling: replace cabinet, sink, faucet, sink, counter top. appliances, patach and paint. no structural work no modification of walls. all work is within unit# 303 | $9,000 |
| Feb 14, 2014 | Completed final sign-off Jun 2014 | 203 Central Av | kitchen remodeling: repl cabinet coutner top, update electrical & plumbing, install lighting patch and paint, at upstairs unitDetails
kitchen remodeling: repl cabinet coutner top, update electrical & plumbing, install lighting patch and paint, at upstairs unit | $12,000 |
| Dec 27, 2013 | Completed final sign-off Mar 2014 | 191 Carnelian Wy | remodel kitchen and bathroom. to comply with cec150(k) 8 & 10; kitchen: replace all cabinets, countertop, sink, faucet, appliance install lighting, update electrical, plumbing as needed; bathroom: replace cabinets, counter top sink faucet, tile install lighting tile and shower pan, update elec asDetails
remodel kitchen and bathroom. to comply with cec150(k) 8 & 10; kitchen: replace all cabinets, countertop, sink, faucet, appliance install lighting, update electrical, plumbing as needed; bathroom: replace cabinets, counter top sink faucet, tile install lighting tile and shower pan, update elec as | $30,000 |
| Jul 12, 2013 | Completed final sign-off Oct 2013 | 1 Daniel Burnham Ct | kitchen and bath remodeling: demolish existgin cabinet counter top, tile, sink, update electrical, plumbing, install new cabine, tile, appliance, recess lights, patch and paint. (no windows, no door)Details
kitchen and bath remodeling: demolish existgin cabinet counter top, tile, sink, update electrical, plumbing, install new cabine, tile, appliance, recess lights, patch and paint. (no windows, no door) | $20,000 |
| Mar 26, 2013 | Completed final sign-off Jul 2013 | 430 Masonic Av | kitchen remodeling - replace existing cabinet, counter top and appliances, install hardwood floor in kitchen area. update electrical and plumbing as needed. patch and paint. lighting change will comply w/cec 150(k).Details
kitchen remodeling - replace existing cabinet, counter top and appliances, install hardwood floor in kitchen area. update electrical and plumbing as needed. patch and paint. lighting change will comply w/cec 150(k). | $15,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 55 Sussex St | kitchen remodeling: replace exiting cabinet, counter top update electrical plumbing as needed, install new appliance, cabinet and counter topDetails
kitchen remodeling: replace exiting cabinet, counter top update electrical plumbing as needed, install new appliance, cabinet and counter top | $18,000 |
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 1650 Jackson St | kitchen and bath remodel. demolish existing cabinet couter top, tile, sink and appliance. update electrical, plumbing as needed. new cagints, counter, tile, sink, toilet, appliancesDetails
kitchen and bath remodel. demolish existing cabinet couter top, tile, sink and appliance. update electrical, plumbing as needed. new cagints, counter, tile, sink, toilet, appliances | $30,000 |
| Sep 26, 2012 | Completed final sign-off Apr 2013 | 1111 Bay St | kitchen and (2) bathroom remodeling: demolish (e) cabinet counter top, tile, sink, update electrical, plumging. install new cabinet, tile, apppliances, hardwood floors. counter top and new shower pan, patch and paint.Details
kitchen and (2) bathroom remodeling: demolish (e) cabinet counter top, tile, sink, update electrical, plumging. install new cabinet, tile, apppliances, hardwood floors. counter top and new shower pan, patch and paint. | $3,500 |
| Apr 20, 2012 | Completed final sign-off Aug 2012 | 3 Mccormick St | kitchen remodel - replace cabinets, appliances, lighting, add new sub panel, replace new hood, enlarge window & replace window with 2 new windows @ east side front of house.Details
kitchen remodel - replace cabinets, appliances, lighting, add new sub panel, replace new hood, enlarge window & replace window with 2 new windows @ east side front of house. | $50,000 |
| Feb 7, 2012 | Completed final sign-off Sep 2012 | 40 Merced Av | kitcenn remodel. demolish existing cabinet and appliance. sink and faucet. change 3 windows. new cabinet appliances and counter top. update electrical. new recessed light. install stove hood. patch and paint. remove wall between kitchen and dining rm. new header and footing according to plan.Details
kitcenn remodel. demolish existing cabinet and appliance. sink and faucet. change 3 windows. new cabinet appliances and counter top. update electrical. new recessed light. install stove hood. patch and paint. remove wall between kitchen and dining rm. new header and footing according to plan. | $30,000 |
| Aug 25, 2011 | Completed final sign-off Nov 2011 | 681 Congo St | kitchen remodeling: demolish (e) cabinets and countertop. install (n) cabinets & countertop and faucet. remove and install all appliances. install (8) new recessed lights. patch & paint. same location. no structural work.Details
kitchen remodeling: demolish (e) cabinets and countertop. install (n) cabinets & countertop and faucet. remove and install all appliances. install (8) new recessed lights. patch & paint. same location. no structural work. | $15,000 |
| May 26, 2011 | Completed final sign-off Oct 2011 | 2201 Sacramento St | kitchen remodeling: demo cabinets, coutertop & appliances. update electrical & plumbing to accomodate. (n) appliances & light fixtures, install appliances, cabinets & (n) countertop, patch & paint.Details
kitchen remodeling: demo cabinets, coutertop & appliances. update electrical & plumbing to accomodate. (n) appliances & light fixtures, install appliances, cabinets & (n) countertop, patch & paint. | $25,000 |
| Mar 23, 2011 | Completed final sign-off Sep 2011 | 455 Vallejo St | kitchen & 1 bath remodeling. new lighting comply w/cec 150k. bath: demo old vanity, tub and tile. install new vanity, tub, toilet. install new tile, update electrical and replace (e) pocket door. kitchen: demo old cabinet, carpet and appliance. install new cabinet, counter top and appliance, hardwooDetails
kitchen & 1 bath remodeling. new lighting comply w/cec 150k. bath: demo old vanity, tub and tile. install new vanity, tub, toilet. install new tile, update electrical and replace (e) pocket door. kitchen: demo old cabinet, carpet and appliance. install new cabinet, counter top and appliance, hardwoo | $25,000 |
| Feb 14, 2011 | Completed final sign-off Jun 2011 | 2200 Sacramento St | unit # 207: kitchen remodeling: demo old cabinets and countertops. changing new appliances, install hard wood floors for kitchen, living and hallway. install carpet for bedrooms, patch and paint. install new kitchen cabinets and counter tops. updated new electrical panel.Details
unit # 207: kitchen remodeling: demo old cabinets and countertops. changing new appliances, install hard wood floors for kitchen, living and hallway. install carpet for bedrooms, patch and paint. install new kitchen cabinets and counter tops. updated new electrical panel. | $40,000 |
| Feb 14, 2011 | Completed final sign-off Sep 2011 | 2200 Sacramento St | unit # 906: kitchen and 2 baths remodeling: demo kitchen cabinets and countertops. remove old bath tile. install new kitchen cabinets. new appliances, install hard wood floor in kitchen, living and hallway. install new tile for both bathrooms and new shower pan, patch and paint.Details
unit # 906: kitchen and 2 baths remodeling: demo kitchen cabinets and countertops. remove old bath tile. install new kitchen cabinets. new appliances, install hard wood floor in kitchen, living and hallway. install new tile for both bathrooms and new shower pan, patch and paint. | $50,000 |
| Nov 12, 2010 | Completed final sign-off Feb 2011 | 56 Chilton Av | demolishing existing kitchen cabinet and counter top, update electrical, install new recess light, install nwe contract, new c-top new appliance, new sink and faucet, patch and paintDetails
demolishing existing kitchen cabinet and counter top, update electrical, install new recess light, install nwe contract, new c-top new appliance, new sink and faucet, patch and paint | $12,000 |
| Aug 31, 2010 | Expired or cancelled expired Feb 2014 | 2200 Sacramento St | unit #1305: kitchen: replace all kitchen cabinet. new appliances, upgrade electricity; bath: changing new cabinet, new tub, tile floor and wall aslong tub and shower. install new shower doors. update new elecgrical panel. install tile floor through out unit. patch and paint.Details
unit #1305: kitchen: replace all kitchen cabinet. new appliances, upgrade electricity; bath: changing new cabinet, new tub, tile floor and wall aslong tub and shower. install new shower doors. update new elecgrical panel. install tile floor through out unit. patch and paint. | $30,000 |
| Aug 3, 2010 | Completed final sign-off Apr 2011 | 2200 Sacramento St | revisions to pa# 2010.06.02.3646. remove wall between two bedrooms, build new wall for closet btn bedrooms. new wall in hall bathroom. enlarge closet in kitchenDetails
revisions to pa# 2010.06.02.3646. remove wall between two bedrooms, build new wall for closet btn bedrooms. new wall in hall bathroom. enlarge closet in kitchen | $4,000 |
| Jun 2, 2010 | Completed final sign-off Apr 2011 | 2200 Sacramento St | kitchen: changing cabinet, install new elec panel, new tile counter, hallway, top update elec provide high efficiency lighting per cec , bath, repl tub, new vanity, counter top, upgrade elec plumb, master bath: install shower, repl new vanity, counter top tiling,update elec .living rm: bedrm: new hDetails
kitchen: changing cabinet, install new elec panel, new tile counter, hallway, top update elec provide high efficiency lighting per cec , bath, repl tub, new vanity, counter top, upgrade elec plumb, master bath: install shower, repl new vanity, counter top tiling,update elec .living rm: bedrm: new h | $40,000 |
| Nov 9, 2009 | Completed final sign-off Jan 2010 | 2200 Sacramento St | kitchen and bthroom remodeling, which include to intall new cabnets, countertop, light fixtures and tiles. also to update the electric and paint the unit # 903Details
kitchen and bthroom remodeling, which include to intall new cabnets, countertop, light fixtures and tiles. also to update the electric and paint the unit # 903 | $30,000 |
| Oct 29, 2009 | Completed final sign-off Dec 2009 | 138 Southwood Dr | kitchen remodeling-remove 9e) cabinets & appliances, install new cabinets & appliances. install casing for 2 windows & 1 door. update electrical wires & plugs. install 3 recessed lightsDetails
kitchen remodeling-remove 9e) cabinets & appliances, install new cabinets & appliances. install casing for 2 windows & 1 door. update electrical wires & plugs. install 3 recessed lights | $18,000 |
| Aug 12, 2009 | Completed final sign-off Oct 2009 | 1650 Jackson St | kitchen & bath remodeling. kitchen- change counter top, cabinet, sink and tile floor, provide min 50% light watts in high afficancy lights. bath- tile floor and shower and one light provide high efficancy lights or "manual on" occupancy sensor.Details
kitchen & bath remodeling. kitchen- change counter top, cabinet, sink and tile floor, provide min 50% light watts in high afficancy lights. bath- tile floor and shower and one light provide high efficancy lights or "manual on" occupancy sensor. | $18,000 |
| Apr 30, 2009 | Completed final sign-off Jul 2009 | 1386 09th Av | remodel 2nd floor unit #3 kitchen and bath. enclose 2 bedrooms, 1 bath foor openings. relocate 2 door openingsDetails
remodel 2nd floor unit #3 kitchen and bath. enclose 2 bedrooms, 1 bath foor openings. relocate 2 door openings | $20,000 |
| Dec 11, 2008 | Completed final sign-off Mar 2009 | 2200 Sacramento St | kitchen and 2 bathrooms remodel remodel change cabinets, change tiles, change vanityDetails
kitchen and 2 bathrooms remodel remodel change cabinets, change tiles, change vanity | $30,000 |
| Sep 29, 2008 | Completed final sign-off Nov 2008 | 80 Hill St | 1 kitchen remodeling new cabinets, new tile floor 100 sqft kitchen: no change to door windows or existing.Details
1 kitchen remodeling new cabinets, new tile floor 100 sqft kitchen: no change to door windows or existing. | $16,850 |
| Sep 15, 2008 | Completed final sign-off Nov 2008 | 150 Lombard St | work @ unit# 804 only. kitchen & bathroom remodel.Details
work @ unit# 804 only. kitchen & bathroom remodel. | $11,000 |