J C M Construction Inc.
- Based in
- Redwood City
- On San Francisco permits
- Dec 2003 to Sep 2019
- Last 24 months
- 0 permits filed
21 permits since 2000: 18 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2019 | Completed final sign-off Jan 2020 | 3518 Judah St | divide 1 (e) bathroom to 2 bathroom; replace (e) bath tub with (n) bath tub w/shower headDetails
divide 1 (e) bathroom to 2 bathroom; replace (e) bath tub with (n) bath tub w/shower head | $1,000 |
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 90 Stoneybrook Av | remove one story non-permit built rear addition, legalize one (e) storage room and a bath at ground floor, to comply with n.o.v. 201163387.Details
remove one story non-permit built rear addition, legalize one (e) storage room and a bath at ground floor, to comply with n.o.v. 201163387. | $20,000 |
| Nov 1, 2012 | Completed final sign-off Mar 2013 | 204 Waterville St | comply w/nov #201235341 - demolish illegal kitchen with counter, sink & oven, then cover & patch walls on 1st floor.Details
comply w/nov #201235341 - demolish illegal kitchen with counter, sink & oven, then cover & patch walls on 1st floor. | $8,000 |
| Nov 16, 2011 | Completed final sign-off Jun 2012 | 2022 16th Av | kitchen remodel including removal of bearing wall bathroom remodels, electrical upgrade,drywall replacement. new wet bar at ground floor. revision to app201109205119Details
kitchen remodel including removal of bearing wall bathroom remodels, electrical upgrade,drywall replacement. new wet bar at ground floor. revision to app201109205119 | $17,000 |
| Sep 20, 2011 | Completed final sign-off Jun 2012 | 2022 16th Av | kitchen remodel, bathroom remodel, dry wall replacement.Details
kitchen remodel, bathroom remodel, dry wall replacement. | $15,000 |
| Jun 29, 2011 | Completed final sign-off Dec 2011 | 627 Sargent St | add 1 new bathroom bedroom, family room & storage room at ground floor per planDetails
add 1 new bathroom bedroom, family room & storage room at ground floor per plan | $35,000 |
| May 4, 2011 | Completed final sign-off Jul 2011 | 269 Jefferson St | replace (e) grill w/new storefront glass, replace (e) susp. act. ceiling w/n. gyp board, lighting & flooring, patch & paint. add new accessible restroom.Details
replace (e) grill w/new storefront glass, replace (e) susp. act. ceiling w/n. gyp board, lighting & flooring, patch & paint. add new accessible restroom. | $20,000 |
| Mar 24, 2011 | Completed final sign-off May 2012 | 1800 Bryant St | add ventitation system for each unit total 42 units- mechanical, electrical. t.i. ref #201101319355. (franklin square lofts)Details
add ventitation system for each unit total 42 units- mechanical, electrical. t.i. ref #201101319355. (franklin square lofts) | $50,000 |
| Oct 28, 2010 | Completed final sign-off Dec 2010 | 2106 Chestnut St | replace existing door with pair of doors at storefront. replace e cabs wit new cabinets, install new flooring-partial, patching and paintingDetails
replace existing door with pair of doors at storefront. replace e cabs wit new cabinets, install new flooring-partial, patching and painting | $35,000 |
| Oct 5, 2010 | Never finaled issued Oct 2010, no final | 301 Felton St | remodel bathroom, upgrade main electrical panel, mechanical. sheetrock rock repair, relocate water heater, replace furnace in basement.Details
remodel bathroom, upgrade main electrical panel, mechanical. sheetrock rock repair, relocate water heater, replace furnace in basement. | $12,000 |
| Oct 21, 2008 | Completed final sign-off Mar 2009 | 2110 36th Av | replace & repair dry wall interior. not to exceed 50% total. replace main electrical panel & existing wire outlet switches. replace iron pipe to copper. replace gas pipe inside house.Details
replace & repair dry wall interior. not to exceed 50% total. replace main electrical panel & existing wire outlet switches. replace iron pipe to copper. replace gas pipe inside house. | $30,000 |
| Aug 27, 2008 | Completed final sign-off Sep 2008 | 277 30th St | replace/repair an existing leak roof in kind and (13'x14') -42" high, redwood railing over on top of rear romm (roof)Details
replace/repair an existing leak roof in kind and (13'x14') -42" high, redwood railing over on top of rear romm (roof) | $4,000 |
| Jun 16, 2008 | Completed final sign-off Sep 2008 | 201 Felton St | repair & repl drywall @2nd wall & ceiling 100% replacement, approx 500 sqft, repair & repl rotted wood siding on rear exterior wall approx 500 sq.ft., repair & rebuilt replace plumbing pipe entire building, upgrade maine lectrical service to 125 amps entire building,Details
repair & repl drywall @2nd wall & ceiling 100% replacement, approx 500 sqft, repair & repl rotted wood siding on rear exterior wall approx 500 sq.ft., repair & rebuilt replace plumbing pipe entire building, upgrade maine lectrical service to 125 amps entire building, | $15,000 |
| Jun 4, 2008 | Completed final sign-off Sep 2008 | 1855 27th Av | sheet rock repair. wall repair @ kitchen, bedroom & bathroom. non structural. in kind.Details
sheet rock repair. wall repair @ kitchen, bedroom & bathroom. non structural. in kind. | $3,000 |
| Sep 6, 2007 | Completed final sign-off Nov 2007 | 3812 Kirkham St | divides existing full bathroom into two separate full bathrooms. on the 2nd floor.Details
divides existing full bathroom into two separate full bathrooms. on the 2nd floor. | $8,000 |
| Jun 7, 2007 | Completed final sign-off Jun 2008 | 291 Wheeler Av | ground floor remodeling of a s.f.d. add bedroom, home office, family room on ground floor. add baths on ground floor. electrical, plumbing to be under separate permit.Details
ground floor remodeling of a s.f.d. add bedroom, home office, family room on ground floor. add baths on ground floor. electrical, plumbing to be under separate permit. | $38,000 |
| Apr 14, 2006 | Never finaled issued Apr 2006, no final | 191 Tucker Av | change basement bedroom to storage (non-habitable space) revision to appl#200601232830Details
change basement bedroom to storage (non-habitable space) revision to appl#200601232830 | |
| Mar 9, 2006 | Completed final sign-off Nov 2006 | 1794 30th Av | add rooms at ground floor. exercise room, computer room & full bath. remodel (e) kitchen, bath & toilet at 2nd floor. replace some (e) windows.Details
add rooms at ground floor. exercise room, computer room & full bath. remodel (e) kitchen, bath & toilet at 2nd floor. replace some (e) windows. | $40,000 |
| Jan 23, 2006 | Completed final sign-off Jul 2006 | 191 Tucker Av | new bed & bath in basement, replace f.a.v., replace exising kitchen & bath fixtures; replace garage door; r3pair windows and sidingDetails
new bed & bath in basement, replace f.a.v., replace exising kitchen & bath fixtures; replace garage door; r3pair windows and siding | $20,000 |
| May 7, 2004 | Completed final sign-off Aug 2004 | 184 Ofarrell St | rev. to pa#2003//12/08/1753 - "as built" grease exhaust systemDetails
rev. to pa#2003//12/08/1753 - "as built" grease exhaust system | $10,000 |
| Dec 8, 2003 | Completed final sign-off Aug 2004 | 184 Ofarrell St | renovate existing interior space, new flooring & finishes, new h.c. accessible bathrooms for men & wDetails
renovate existing interior space, new flooring & finishes, new h.c. accessible bathrooms for men & w | $105,000 |