Back to bathroom remodel contractors
J C M Construction Inc.
- Based in
- Redwood City
- On San Francisco permits
- Dec 2003 to Sep 2019
- Last 24 months
- 0 permits filed
21 permits since 2000: 18 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 2 never finaled. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2019 | Completed final sign-off Jan 2020 | 3518 Judah St | divide 1 (e) bathroom to 2 bathroom; replace (e) bath tub with (n) bath tub w/shower headDetails
divide 1 (e) bathroom to 2 bathroom; replace (e) bath tub with (n) bath tub w/shower head | $1,000 |
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 90 Stoneybrook Av | remove one story non-permit built rear addition, legalize one (e) storage room and a bath at ground floor, to comply with n.o.v. 201163387.Details
remove one story non-permit built rear addition, legalize one (e) storage room and a bath at ground floor, to comply with n.o.v. 201163387. | $20,000 |
| Nov 16, 2011 | Completed final sign-off Jun 2012 | 2022 16th Av | kitchen remodel including removal of bearing wall bathroom remodels, electrical upgrade,drywall replacement. new wet bar at ground floor. revision to app201109205119Details
kitchen remodel including removal of bearing wall bathroom remodels, electrical upgrade,drywall replacement. new wet bar at ground floor. revision to app201109205119 | $17,000 |
| Sep 20, 2011 | Completed final sign-off Jun 2012 | 2022 16th Av | kitchen remodel, bathroom remodel, dry wall replacement.Details
kitchen remodel, bathroom remodel, dry wall replacement. | $15,000 |
| Jun 29, 2011 | Completed final sign-off Dec 2011 | 627 Sargent St | add 1 new bathroom bedroom, family room & storage room at ground floor per planDetails
add 1 new bathroom bedroom, family room & storage room at ground floor per plan | $35,000 |
| Oct 5, 2010 | Never finaled issued Oct 2010, no final | 301 Felton St | remodel bathroom, upgrade main electrical panel, mechanical. sheetrock rock repair, relocate water heater, replace furnace in basement.Details
remodel bathroom, upgrade main electrical panel, mechanical. sheetrock rock repair, relocate water heater, replace furnace in basement. | $12,000 |
| Jun 4, 2008 | Completed final sign-off Sep 2008 | 1855 27th Av | sheet rock repair. wall repair @ kitchen, bedroom & bathroom. non structural. in kind.Details
sheet rock repair. wall repair @ kitchen, bedroom & bathroom. non structural. in kind. | $3,000 |
| Sep 6, 2007 | Completed final sign-off Nov 2007 | 3812 Kirkham St | divides existing full bathroom into two separate full bathrooms. on the 2nd floor.Details
divides existing full bathroom into two separate full bathrooms. on the 2nd floor. | $8,000 |
| Jun 7, 2007 | Completed final sign-off Jun 2008 | 291 Wheeler Av | ground floor remodeling of a s.f.d. add bedroom, home office, family room on ground floor. add baths on ground floor. electrical, plumbing to be under separate permit.Details
ground floor remodeling of a s.f.d. add bedroom, home office, family room on ground floor. add baths on ground floor. electrical, plumbing to be under separate permit. | $38,000 |
| Mar 9, 2006 | Completed final sign-off Nov 2006 | 1794 30th Av | add rooms at ground floor. exercise room, computer room & full bath. remodel (e) kitchen, bath & toilet at 2nd floor. replace some (e) windows.Details
add rooms at ground floor. exercise room, computer room & full bath. remodel (e) kitchen, bath & toilet at 2nd floor. replace some (e) windows. | $40,000 |
| Jan 23, 2006 | Completed final sign-off Jul 2006 | 191 Tucker Av | new bed & bath in basement, replace f.a.v., replace exising kitchen & bath fixtures; replace garage door; r3pair windows and sidingDetails
new bed & bath in basement, replace f.a.v., replace exising kitchen & bath fixtures; replace garage door; r3pair windows and siding | $20,000 |
| Dec 8, 2003 | Completed final sign-off Aug 2004 | 184 Ofarrell St | renovate existing interior space, new flooring & finishes, new h.c. accessible bathrooms for men & wDetails
renovate existing interior space, new flooring & finishes, new h.c. accessible bathrooms for men & w | $105,000 |