Adam's General Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2004 to Feb 2026
- Last 24 months
- 2 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2026 | In progress filed Feb 2026, not yet issued | 147 Hyde St | install drywall due to fire damageDetails
install drywall due to fire damage | $1,000 |
| Jun 16, 2025 | In progress issued Jun 2025 | 155 Hyde St | comply w/ nov# 202538872: repair door, paint all burn interior, some exterior, rooms, and electrical panel. work in ground floor, 1st floor, and mezzanine. all in kind.Details
comply w/ nov# 202538872: repair door, paint all burn interior, some exterior, rooms, and electrical panel. work in ground floor, 1st floor, and mezzanine. all in kind. | $20,000 |
| Jul 11, 2012 | Completed final sign-off Mar 2014 | 460 Hamilton St | comply with complaint #201153231-remodel (e) kitchen, bathrooms, laundry area. add toilet at ground floor, convert (e) family room to a bedroom with a bathroom & closet on 2nd floor. voluntary reinforce 9e) wood frame structureDetails
comply with complaint #201153231-remodel (e) kitchen, bathrooms, laundry area. add toilet at ground floor, convert (e) family room to a bedroom with a bathroom & closet on 2nd floor. voluntary reinforce 9e) wood frame structure | $40,000 |
| May 5, 2006 | Completed final sign-off Jun 2006 | 200 Leavenworth St | remove extg ilegal partition on 2nd floor(to abate the n.o.v. #200666006) 2nd floor will be reverted back to as previously approved as shown on app 9212371Details
remove extg ilegal partition on 2nd floor(to abate the n.o.v. #200666006) 2nd floor will be reverted back to as previously approved as shown on app 9212371 | $1,000 |
| Jan 8, 2004 | Completed final sign-off Feb 2004 | 428 Taraval St | kitchen remodel, bathroom remodel, remodel bathtub, one toilet, one small hand washing sink. replaceDetails
kitchen remodel, bathroom remodel, remodel bathtub, one toilet, one small hand washing sink. replace | $12,000 |