Jingbo Yang
- Listed as
- architect, authorized agent-others, engineer, lessee
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Aug 2026
260 permits since 2000 (engineer on 235 permits, authorized agent-others on 14 permits, architect on 11 permits, lessee on 1 permit): 196 completed, 26 in progress, 17 never finaled, 21 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 260.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 1037 Filbert St | new deck light-well infill.Details
new deck light-well infill. | $25,000 | |
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 81 Bruce Av | revision to previous permit #202510288313. add a bathroom on 1st floor.Details
revision to previous permit #202510288313. add a bathroom on 1st floor. | $5,000 | |
| Jul 2, 2026 | In progress issued Jul 2026 | 1645 48th Av | revision to bpa#202603057027 & 202602115760. add deck and stairs to rear, modify front roofDetails
revision to bpa#202603057027 & 202602115760. add deck and stairs to rear, modify front roof | $15,000 | |
| Jun 29, 2026 | In progress issued Sep 2026 | 1835 18th Av | Gh Construction Inc. | 1/f: add 1 bedroom and 1.5 bath; office horizontal addition at rear. 2/f: remodel kitchen and bath,add 1 bath, interior stairs and deck at rear. replace window at front with existing openingDetails
1/f: add 1 bedroom and 1.5 bath; office horizontal addition at rear. 2/f: remodel kitchen and bath,add 1 bath, interior stairs and deck at rear. replace window at front with existing opening | $220,000 |
| Jun 22, 2026 | In progress issued Aug 2026 | 2551 30th Av | to comply with nov 202419354. reconfigure three bathrooms layout, convert bedroom into walk in closet add laundry, remove bearing wall to accommdate open layout into kitchen dining and living room on 2nd flr. all work on 2nd floor, not visible to the street.Details
to comply with nov 202419354. reconfigure three bathrooms layout, convert bedroom into walk in closet add laundry, remove bearing wall to accommdate open layout into kitchen dining and living room on 2nd flr. all work on 2nd floor, not visible to the street. | $50,000 | |
| Jun 11, 2026 | Completed final sign-off Aug 2026 | 1521 Hudson Av | Ac & Lc Corporation | revision to pa#: 202305107506. revise structuralDetails
revision to pa#: 202305107506. revise structural | |
| Jun 10, 2026 | In progress issued Jun 2026 | 81 Bruce Av | revision to pa# 202411225569 unit a: revise 1-hour rated exterior wall detail at property line. (n) cement lap siding at rear adu building.Details
revision to pa# 202411225569 unit a: revise 1-hour rated exterior wall detail at property line. (n) cement lap siding at rear adu building. | ||
| Mar 27, 2026 | Completed final sign-off Sep 2026 | 122 Flood Av | Kevin Lin Construction Inc | replace front stair in kindDetails
replace front stair in kind | $5,000 |
| Mar 27, 2026 | Completed final sign-off Aug 2026 | 2210 39th Av | Electric Current Construction Inc. | 1st fl, add one full bath. 2nd fl: remodel kitchen and bath. add deck at rear.Details
1st fl, add one full bath. 2nd fl: remodel kitchen and bath. add deck at rear. | $100,000 |
| Mar 11, 2026 | In progress filed Mar 2026, not yet issued | 2005 San Jose Av | unit 2005. 3rd flr: remodel kitchen and bathroom. relocate bedroom and 1 full bath. roof alteration on 3rd flr.Details
unit 2005. 3rd flr: remodel kitchen and bathroom. relocate bedroom and 1 full bath. roof alteration on 3rd flr. | $68,000 | |
| Mar 6, 2026 | In progress issued Mar 2026 | 1786 36th Av | C Plus E Construction Inc | 1st fl - add family, den and 1 full bath; 2nd fl - infill lightwell on south side; remodel kitchen and bath, add 1 full bath, reconfigure, interior stairs; replace front windows with wood windowsDetails
1st fl - add family, den and 1 full bath; 2nd fl - infill lightwell on south side; remodel kitchen and bath, add 1 full bath, reconfigure, interior stairs; replace front windows with wood windows | $300,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 931 Edinburgh St | Gh Construction Inc. | revision to pa #2025-0630-9852: lower (e) ground slab about 1ft. new foundation and slab. add new skylights to bathrooms.Details
revision to pa #2025-0630-9852: lower (e) ground slab about 1ft. new foundation and slab. add new skylights to bathrooms. | $10,000 |
| Feb 26, 2026 | In progress issued Mar 2026 | 928 Stockton St | tenant improvements: existing cafe 928 stockton st. install take out window. added space for new take out ordering room for cafe.Details
tenant improvements: existing cafe 928 stockton st. install take out window. added space for new take out ordering room for cafe. | $500 | |
| Feb 13, 2026 | In progress issued Mar 2026 | 2144 17th Av | Bjy Construction Inc | 1/f: add 2 bedroom, 2 full bath, laundry and family; 2/f: remodel kitchen and bathroom, add 1 full bath. infill at rear.Details
1/f: add 2 bedroom, 2 full bath, laundry and family; 2/f: remodel kitchen and bathroom, add 1 full bath. infill at rear. | $160,000 |
| Feb 6, 2026 | In progress issued Feb 2026 | 120 Shakespeare St | Yefa Construction Inc | revision to pa# 202111152408: 1/f- reconfigure kitchen and bedroom layouts. new opening between family and dining room. reconfigure rear deck.Details
revision to pa# 202111152408: 1/f- reconfigure kitchen and bedroom layouts. new opening between family and dining room. reconfigure rear deck. | |
| Jan 28, 2026 | In progress issued Feb 2026 | 21 Hollywood Ct | Hong's General Construction Inc | 1st fl - add family room; 2nd fl - remodel kitchen and bathroom, add 1 full bath and office; repair interior stairsDetails
1st fl - add family room; 2nd fl - remodel kitchen and bathroom, add 1 full bath and office; repair interior stairs | $78,000 |
| Jan 20, 2026 | In progress issued Feb 2026 | 1647 24th Av | Yao Star Construction | 1st fl: infill at rear. add 2 baths, laundry room, 2 bedroom and family room. 2nd fl: remodel kitchen and bath. add 1.5 bath, reconfigure interior stairs. replace front windows with vinyl windows.Details
1st fl: infill at rear. add 2 baths, laundry room, 2 bedroom and family room. 2nd fl: remodel kitchen and bath. add 1.5 bath, reconfigure interior stairs. replace front windows with vinyl windows. | $320,000 |
| Dec 15, 2025 | Completed final sign-off Jul 2026 | 1783 40th Av | Samco Construction Inc | construct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create..Details
construct a rear deck with stairs & infill lightwell at north side of the property and install new james hardie siding on the south and west sides of the property, add 2 bedrooms, a-3fixture bathroom, media room,laundry room and wet bar on the 1st floor; and removing walls on the 2nd fl to create.. | $150,000 |
| Nov 14, 2025 | Completed final sign-off May 2026 | 736 Lisbon St | Youngor Pro Construction | 2/f: total remodel, relocate living, kitchen, dining, bedroom and bathroom. add new bedroom, bathroom and playroom. new deck at rear, replace windows with vinyl, adding new cabinets.Details
2/f: total remodel, relocate living, kitchen, dining, bedroom and bathroom. add new bedroom, bathroom and playroom. new deck at rear, replace windows with vinyl, adding new cabinets. | $80,000 |
| Nov 13, 2025 | Completed final sign-off Sep 2026 | 2033 Clement St | R H Construction And Design Inc | 1st fl (unit #2035): install new steps & garage access door at foyer. remove partitions to accomodate open layout. lower flooring at rear of property (living, bedroom & bath). 2nd fl (unit #2033): replace two windows in dining room, one window in bedroom in kind. garage:new gas furnace & tankless whDetails
1st fl (unit #2035): install new steps & garage access door at foyer. remove partitions to accomodate open layout. lower flooring at rear of property (living, bedroom & bath). 2nd fl (unit #2033): replace two windows in dining room, one window in bedroom in kind. garage:new gas furnace & tankless wh | $30,000 |
| Nov 10, 2025 | In progress filed Nov 2025, not yet issued | 2074 24th Av | two story rear addition. 1st floor: remodel bath, add 2 bedrooms, family & 1 full bath. 2nd floor: remodel kitchen & bath, add 1 bedroom & full bath.Details
two story rear addition. 1st floor: remodel bath, add 2 bedrooms, family & 1 full bath. 2nd floor: remodel kitchen & bath, add 1 bedroom & full bath. | $100,000 | |
| Nov 3, 2025 | Completed final sign-off Apr 2026 | 862 York St | Yefa Construction Inc | revision to pa# 2025-0513-6374. 1st fl: reconfigure layout, remove 1 bedroom, add 1 family room and wet bar. 2nd fl: reconfiguration per plan. reduce scope of work. new skylights. relocate interiors stair.Details
revision to pa# 2025-0513-6374. 1st fl: reconfigure layout, remove 1 bedroom, add 1 family room and wet bar. 2nd fl: reconfiguration per plan. reduce scope of work. new skylights. relocate interiors stair. | $8,000 |
| Oct 28, 2025 | In progress issued Dec 2025 | 81 Bruce Av | Nova East Design Build Co. | vertical addition and east side light well infll at front building. 1st fl: convert 1 bedroom and 1 bath. 2nd fl: add 1 bedroom, 1 bath & 1 den.Details
vertical addition and east side light well infll at front building. 1st fl: convert 1 bedroom and 1 bath. 2nd fl: add 1 bedroom, 1 bath & 1 den. | $120,000 |
| Oct 17, 2025 | Expired or cancelled cancelled May 2026 | 3118 Rivera St | Castle Construction | 1st fl/ add 1 full bathroom , 2 bedrooms and one media room cantilever deck ar rear, infill lightwell at east side. 2nd fl: remodel kitchen and bath. add 1 full bath.Details
1st fl/ add 1 full bathroom , 2 bedrooms and one media room cantilever deck ar rear, infill lightwell at east side. 2nd fl: remodel kitchen and bath. add 1 full bath. | $225,000 |
| Oct 15, 2025 | Expired or cancelled suspend Jul 2026 | 1595 21st Av | W J L Construction Inc | 1st flr: remodel (e) bedrooms and bathrooms. add media. 1 bedroom and powder room. 2nd flr: total remodel. reconfigure kitchen and dining. add 2 full baths and office. relocate laundry and utilities. replace front and side windows with vinyl. new patio at rear.Details
1st flr: remodel (e) bedrooms and bathrooms. add media. 1 bedroom and powder room. 2nd flr: total remodel. reconfigure kitchen and dining. add 2 full baths and office. relocate laundry and utilities. replace front and side windows with vinyl. new patio at rear. | $200,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 667 39th Av | Castle Construction | 1st flr: remodel bath, bedrooms, add media room. 1 full bath and laundry. 2nd flr: remodel kitchen, baths, add 1 full bath. infill south side light well and infill rear. reconifure the interior stairs. new vinyl windows at rear & sideDetails
1st flr: remodel bath, bedrooms, add media room. 1 full bath and laundry. 2nd flr: remodel kitchen, baths, add 1 full bath. infill south side light well and infill rear. reconifure the interior stairs. new vinyl windows at rear & side | $270,000 |
| Sep 8, 2025 | Completed final sign-off Sep 2026 | 366 Naples St | Goliath Construction | 1st fl: relocate laundry & utilities. add media room with wetbar. 2 bedrooms and 1 full bath. 2nd fl: remodel (e) kitchen and bath. add 1 full bath and laundry. infill lightwell and new skylights. new deck at rear. replace front windows with in kind vinyl.Details
1st fl: relocate laundry & utilities. add media room with wetbar. 2 bedrooms and 1 full bath. 2nd fl: remodel (e) kitchen and bath. add 1 full bath and laundry. infill lightwell and new skylights. new deck at rear. replace front windows with in kind vinyl. | $170,000 |
| Sep 5, 2025 | In progress issued Sep 2025 | 1566 23rd Av | Tao's Construction Inc. | add two bedrooms and two bathroom, a kitchenette, a media room on 1st flr. relocate the laundry unit, install a new furnance and water heater, remove walls at the living, dining, and kitchen areas on the 2nd floor to create an open layout, convert the existing bathroom into two full bathrooms,Details
add two bedrooms and two bathroom, a kitchenette, a media room on 1st flr. relocate the laundry unit, install a new furnance and water heater, remove walls at the living, dining, and kitchen areas on the 2nd floor to create an open layout, convert the existing bathroom into two full bathrooms, | $160,000 |
| Aug 19, 2025 | Completed final sign-off May 2026 | 42 Granada Av | Nova East Design Build Co. | 1st fl. add laundry room, 2nd fl. remodel kitchen and batth, add 1 bedroom and 1 full bath. 3rd fl. add half bath. add deck at rearDetails
1st fl. add laundry room, 2nd fl. remodel kitchen and batth, add 1 bedroom and 1 full bath. 3rd fl. add half bath. add deck at rear | $100,000 |
| Aug 13, 2025 | Completed final sign-off Jun 2026 | 2317 30th Av | Huang Hua Construction Company | comply with nov 202431750, 1st fl: removel e bath, add wet bar and 2 burners @ e family rm. 2nd fl remodel kitchen and add 1 toiletDetails
comply with nov 202431750, 1st fl: removel e bath, add wet bar and 2 burners @ e family rm. 2nd fl remodel kitchen and add 1 toilet | $70,000 |
| Aug 13, 2025 | In progress issued Jan 2026 | 1542 22nd Av | Castle Construction | 1st floor: add 2 bedrooms, 1 full bath, laundry, media and home office. 2nd floor: remodel kitchen and bathroom. relocate bedroom & add 1.5 bath. rear addition: infill lightwell adn new patio at rear. replace front windows in kind (vinyl).Details
1st floor: add 2 bedrooms, 1 full bath, laundry, media and home office. 2nd floor: remodel kitchen and bathroom. relocate bedroom & add 1.5 bath. rear addition: infill lightwell adn new patio at rear. replace front windows in kind (vinyl). | $180,000 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 2124 18th Av | Hong's General Construction Inc | 1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear.Details
1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear. | $190,000 |
| Aug 12, 2025 | Completed final sign-off Jul 2026 | 2258 38th Av | Bingo Builders | 1/f: relocate laundry, add 2 bedrooms, family and 1 full bath; 2/f: remodel (e) kitchen, dining, living, bedrooms and bathroom, add 1 full bath; infill at rear.Details
1/f: relocate laundry, add 2 bedrooms, family and 1 full bath; 2/f: remodel (e) kitchen, dining, living, bedrooms and bathroom, add 1 full bath; infill at rear. | $150,000 |
| Jul 31, 2025 | In progress issued May 2026 | 1334 27th Av | Tao's Construction Inc. | enclose lightwell on both sides of bldg & space under (e) rear deck; removing as built roof over the north side light/stairwell; replacing 5 windows 2 ; relocating front entry door; installing (n) garage door; upgrade elec service to 125 am; add 2 bedrms; 2 baths, media rm & gym on 1st fl; reconDetails
enclose lightwell on both sides of bldg & space under (e) rear deck; removing as built roof over the north side light/stairwell; replacing 5 windows 2 ; relocating front entry door; installing (n) garage door; upgrade elec service to 125 am; add 2 bedrms; 2 baths, media rm & gym on 1st fl; recon | $200,000 |
| Jul 29, 2025 | Completed final sign-off Oct 2025 | 3890 Market St | Bc United Construction Inc | comply with complaint 202539495 & 202537813 remove unpermitted rear stairs and sheds at the yard. close door on units 2 and 3 at common storage area.Details
comply with complaint 202539495 & 202537813 remove unpermitted rear stairs and sheds at the yard. close door on units 2 and 3 at common storage area. | $5,000 |
| Jul 24, 2025 | Completed final sign-off Jan 2026 | 238 Hamilton St | Yao Star Construction | foundation rev to pa# 2025-0701-9946: lower concrete slabe 1'-0" new/replace foundation per plan all interior workDetails
foundation rev to pa# 2025-0701-9946: lower concrete slabe 1'-0" new/replace foundation per plan all interior work | $5,000 |
| Jul 18, 2025 | In progress issued Aug 2025 | 181 De Soto St | Brendan Waters Construction Inc | remodel kitchen and half bath on main level; remodel bathroom and add bathroom on upper level. no exterior workDetails
remodel kitchen and half bath on main level; remodel bathroom and add bathroom on upper level. no exterior work | $50,000 |
| Jun 27, 2025 | Expired or cancelled withdrawn Jul 2025 | 181 De Soto St | Brendan Waters Construction Inc | all interior work. remodel kitchen & bathroom on main level. remodel upper fl bathroom and add bathroom. remodel lower level bathroomDetails
all interior work. remodel kitchen & bathroom on main level. remodel upper fl bathroom and add bathroom. remodel lower level bathroom | $180,000 |
| Jun 12, 2025 | Completed final sign-off Mar 2026 | 554 18th Av | Junda Construction Inc | revision to pa# 202403278745: 1/f-reconfigure wetbar and laundry. relocate under stairs closet to common area. 2/f- remove bar cabinet at dining rm. add partial wall at stair landing. 3/f-add 1 skylight w/ 1 hr fire rated parapet, 1 new furnace, add 1 door to bathroom, and remove vanity from masterDetails
revision to pa# 202403278745: 1/f-reconfigure wetbar and laundry. relocate under stairs closet to common area. 2/f- remove bar cabinet at dining rm. add partial wall at stair landing. 3/f-add 1 skylight w/ 1 hr fire rated parapet, 1 new furnace, add 1 door to bathroom, and remove vanity from master | $500 |
| Apr 3, 2025 | In progress issued May 2025 | 81 Bruce Av | structural revision only to permit# 202411225569: keep (e) foundation, keep all exterior all, no shear wall, no holddown added.Details
structural revision only to permit# 202411225569: keep (e) foundation, keep all exterior all, no shear wall, no holddown added. | ||
| Apr 1, 2025 | Completed final sign-off May 2025 | 30 Lucy St | Mta Construction Inc | comply with nov 200449636 & 202297179: 1st fl. new deck at rear and remove unpermitted powder room in garage. 2nd fl. legalize 2 rear sliding doors and 2 new guardrails at rearDetails
comply with nov 200449636 & 202297179: 1st fl. new deck at rear and remove unpermitted powder room in garage. 2nd fl. legalize 2 rear sliding doors and 2 new guardrails at rear | $6,000 |
| Mar 20, 2025 | Completed final sign-off Jun 2025 | 331 London St | Winwin Construction Inc | new front stair with wood railing. new front facade. replace front door and in kind window replacement with wood (6 windows).Details
new front stair with wood railing. new front facade. replace front door and in kind window replacement with wood (6 windows). | $15,000 |
| Mar 14, 2025 | Completed final sign-off Jan 2026 | 2347 42nd Av | Hong's General Construction Inc | 1st floor: remodel (e) bathroom 2nd floor: remove 2'-6" section of partition wall at kitchen.Details
1st floor: remodel (e) bathroom 2nd floor: remove 2'-6" section of partition wall at kitchen. | $10,000 |
| Feb 24, 2025 | Completed final sign-off Apr 2026 | 806 Potrero Av | Winnie Wong Construction | lower fl: lower sub fl for ceiling height, add two bedrooms, media/entertainment, laundry, mech room, two 3-fixture bathrooms. install mini split hvac, tankless water heater, relocate stairs. upper fl: reconfigure for 2 bedrooms, two baths, walk in closet, kitchen, dining, living room, new furnace.Details
lower fl: lower sub fl for ceiling height, add two bedrooms, media/entertainment, laundry, mech room, two 3-fixture bathrooms. install mini split hvac, tankless water heater, relocate stairs. upper fl: reconfigure for 2 bedrooms, two baths, walk in closet, kitchen, dining, living room, new furnace. | $70,000 |
| Feb 11, 2025 | Completed final sign-off Dec 2025 | 1334 30th Av | Apex Pro Contractors Inc | 1st/f: relocate laundry, add new family, office, 2 bedrooms & 2 full baths. 2nd/f: remodel e) living, kitchen, dining, bedrooms, den & bathroom. add new 1.5 baths & laundrt. replace front stucco & rear siding in kind. revision to pa# 202504013460Details
1st/f: relocate laundry, add new family, office, 2 bedrooms & 2 full baths. 2nd/f: remodel e) living, kitchen, dining, bedrooms, den & bathroom. add new 1.5 baths & laundrt. replace front stucco & rear siding in kind. revision to pa# 202504013460 | $200,000 |
| Jan 17, 2025 | Completed final sign-off Aug 2026 | 507 29th Av | Cbs Construction Inc. | 1st floor (#507): remodel kitchen & bathroom. add 1 bedroom and 1 full bath. replace sheetrock and insultation throughout the unit.Details
1st floor (#507): remodel kitchen & bathroom. add 1 bedroom and 1 full bath. replace sheetrock and insultation throughout the unit. | $70,000 |
| Jan 9, 2025 | Completed final sign-off Jun 2025 | 331 London St | 1/f: relocate living, kitchen, dining, bedroom, bathroom & laundry per plan. add half bathroom. 2/f: remodel (e) media & bedrooms. relocate (e) bathroom and add 1 full bathroom.Details
1/f: relocate living, kitchen, dining, bedroom, bathroom & laundry per plan. add half bathroom. 2/f: remodel (e) media & bedrooms. relocate (e) bathroom and add 1 full bathroom. | $135,000 | |
| Dec 17, 2024 | In progress issued Mar 2025 | 81 Bruce Av | Nova East Design Build Co. | convert (e) rear yard cottage structure to a detached adu per state program in the the same location. retain the same dimension and height. adu no to be 81a. replace existing foundation for the adu building,Details
convert (e) rear yard cottage structure to a detached adu per state program in the the same location. retain the same dimension and height. adu no to be 81a. replace existing foundation for the adu building, | $40,000 |
| Dec 17, 2024 | Completed final sign-off Oct 2025 | 1000 Prague St | Hung Construction | comply to complaint # 202430490: 1/f - dryrot repair and siding replacement. 2/f - add home office, playroom, and half bath. (n) radiant heat system. playroom.Details
comply to complaint # 202430490: 1/f - dryrot repair and siding replacement. 2/f - add home office, playroom, and half bath. (n) radiant heat system. playroom. | $50,000 |
| Nov 13, 2024 | In progress issued Jun 2025 | 1018 Persia Av | comply with nov# 202420259. converting the (e) as-built rooms on the first floor into a fully functional accessory dwelling unit (adu) that includes one bedroom, two bathrooms, a living/dining area, a kitchen, and an office per government code section 65852.2.Details
comply with nov# 202420259. converting the (e) as-built rooms on the first floor into a fully functional accessory dwelling unit (adu) that includes one bedroom, two bathrooms, a living/dining area, a kitchen, and an office per government code section 65852.2. | $130,000 | |
| Oct 30, 2024 | Completed final sign-off Sep 2025 | 430 Rolph St | Hong's General Construction Inc | 1st fl: add family room with wet bar, 1 full bath & 2 bedrooms. relocate laundry & utilities. 2nd fl: total remodel, add 2 (n) bedrooms & 1 full bath. new patio at rear. all new window and door with fiberglassDetails
1st fl: add family room with wet bar, 1 full bath & 2 bedrooms. relocate laundry & utilities. 2nd fl: total remodel, add 2 (n) bedrooms & 1 full bath. new patio at rear. all new window and door with fiberglass | $230,000 |
| Oct 24, 2024 | Completed final sign-off Feb 2026 | 2020 20th Av | Jin's Construction Inc | 1st fl: add 1 office, bedroom, family & full bath. 2nd fl: remodel kitchen, bathroom, relocate 2 bedrooms, living & add 1 full bath. infill lightwell & bottom rearDetails
1st fl: add 1 office, bedroom, family & full bath. 2nd fl: remodel kitchen, bathroom, relocate 2 bedrooms, living & add 1 full bath. infill lightwell & bottom rear | $120,000 |
| Oct 21, 2024 | Completed final sign-off Jul 2025 | 243 Granada Av | Kevin Lin Construction Inc | 1st floor: add 1 bedroom, 1 family room, and one full bath. 2nd floor: remodel bathroom, relocate kitchen and bedrrom, add 1 full bath. to comply with nov #2022885151-12). replace windows at front wood aluminum clad. add (n) deck at rearDetails
1st floor: add 1 bedroom, 1 family room, and one full bath. 2nd floor: remodel bathroom, relocate kitchen and bedrrom, add 1 full bath. to comply with nov #2022885151-12). replace windows at front wood aluminum clad. add (n) deck at rear | $220,000 |
| Oct 7, 2024 | Completed final sign-off Dec 2025 | 1047 Plymouth Av | Tao's Construction Inc. | 1st fl convert 1st fl access door to window, relocate door, add 2 bedrooms, 2 bath, entertainment area, kitchenette, replace garage door. upgrade elec service to 125 ampe, new front stair and replace stone veneer w stucco. 2nd fl reconfigure layout w 2 bedrooms,2 bath, kitchen, dining living area.Details
1st fl convert 1st fl access door to window, relocate door, add 2 bedrooms, 2 bath, entertainment area, kitchenette, replace garage door. upgrade elec service to 125 ampe, new front stair and replace stone veneer w stucco. 2nd fl reconfigure layout w 2 bedrooms,2 bath, kitchen, dining living area. | $180,000 |
| Aug 16, 2024 | Completed final sign-off Sep 2025 | 467 Pennsylvania Av | D Construction Inc | structural revision to 202109037802, new floor beam to replace existing beam, roof skylite framing revision per plan. reference bpa 202405202526Details
structural revision to 202109037802, new floor beam to replace existing beam, roof skylite framing revision per plan. reference bpa 202405202526 | $5,000 |
| Aug 8, 2024 | Completed final sign-off Feb 2025 | 587 41st Av | Radiant Construction Company | 2nd fl remodel kitchen and bath. add 1 full bathDetails
2nd fl remodel kitchen and bath. add 1 full bath | $60,000 |
| Jul 29, 2024 | In progress issued Sep 2024 | 345 Taraval St | Brendan Lalor Construction | change of use from speciality grocery to full restaurant. no construction under this permit.Details
change of use from speciality grocery to full restaurant. no construction under this permit. | |
| Jun 5, 2024 | Expired or cancelled cancelled Jul 2024 | 345 Taraval St | Brendan Lalor Construction | change of use from specialty grocery to a limited restaurant. no work on this permit. all work completed under 202209263138, 202305157769Details
change of use from specialty grocery to a limited restaurant. no work on this permit. all work completed under 202209263138, 202305157769 | |
| May 28, 2024 | Completed final sign-off Jul 2024 | 38 Caselli Av | G Construction Service Inc | reconfigure bathroom per plan at top (4th) floor unit. interior remodel.Details
reconfigure bathroom per plan at top (4th) floor unit. interior remodel. | $12,000 |
| May 23, 2024 | Completed final sign-off Apr 2025 | 5624 Fulton St | Tao's Construction Inc. | revision to bpa# 2023-0711-1846: 1st fl- add built in co in bldg 3: reduce size of bath #4, add a door provide access to garage, add a door under ext stairs for maintance purpose. new center steel beam under 2nd fl (structural) 2nd fl change fixture layout in bath #1 reduce size of bath #2 relocateDetails
revision to bpa# 2023-0711-1846: 1st fl- add built in co in bldg 3: reduce size of bath #4, add a door provide access to garage, add a door under ext stairs for maintance purpose. new center steel beam under 2nd fl (structural) 2nd fl change fixture layout in bath #1 reduce size of bath #2 relocate | |
| May 15, 2024 | Completed final sign-off Dec 2025 | 2530 27th Av | Pacific Peninsula Construction Managemen | 1st fl: add 2 bedroom, 2 full bath and family room 2nd fl: remodel (e) kitchen and bathroom. add 1 full bath. add 4" retaining wall at the rear addition. new skylights on roof. new windows and sliding doors at the rearDetails
1st fl: add 2 bedroom, 2 full bath and family room 2nd fl: remodel (e) kitchen and bathroom. add 1 full bath. add 4" retaining wall at the rear addition. new skylights on roof. new windows and sliding doors at the rear | $150,000 |
| Apr 22, 2024 | Completed final sign-off Mar 2026 | 554 18th Av | Junda Construction Inc | 3 story horizontal addition - 1st fl - add 2 bedrooms, 1 full bath, and media room; 2nd fl - remodel, kitchen & bath; add deck @ rear; 3rd fl l- remodel bath, and add 1 full bath; reconfigure interior stairsDetails
3 story horizontal addition - 1st fl - add 2 bedrooms, 1 full bath, and media room; 2nd fl - remodel, kitchen & bath; add deck @ rear; 3rd fl l- remodel bath, and add 1 full bath; reconfigure interior stairs | $500,000 |
| Apr 19, 2024 | Completed final sign-off Aug 2024 | 65 Howth St | replace front stair in kind.Details
replace front stair in kind. | $5,000 | |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 240 Leavenworth St | lower height of rear storage shed to 8' or less.Details
lower height of rear storage shed to 8' or less. | ||
| Apr 9, 2024 | Completed final sign-off Oct 2024 | 240 Leavenworth St | legalize (e) security gate to comply w/ planning enforcement case# 2024-001404enf.Details
legalize (e) security gate to comply w/ planning enforcement case# 2024-001404enf. | $200 | |
| Apr 9, 2024 | Completed final sign-off Oct 2024 | 240 Leavenworth St | sign - 'ryans laundro' 24" x 24" x 54'6"Details
sign - 'ryans laundro' 24" x 24" x 54'6" | ||
| Apr 9, 2024 | Completed final sign-off Oct 2024 | 240 Leavenworth St | sign - 'ryans laundromat wash fold' 32" x 15" x 7'9Details
sign - 'ryans laundromat wash fold' 32" x 15" x 7'9 | ||
| Mar 22, 2024 | Completed final sign-off Feb 2025 | 503 Lakeview Av | Pacific Core Builders Group Inc. | replace front & side stairs on grade (work within property line do not affect public right of way)Details
replace front & side stairs on grade (work within property line do not affect public right of way) | $10,000 |
| Feb 9, 2024 | Completed final sign-off Sep 2024 | 531 09th Av | Fresh Homes | 2/f: remodel kitchen and half bath. 3/f: remodel bathroom and add 1 full bath. add new deck at rear. infill lightwell.Details
2/f: remodel kitchen and half bath. 3/f: remodel bathroom and add 1 full bath. add new deck at rear. infill lightwell. | $78,000 |
| Jan 4, 2024 | Completed final sign-off Nov 2024 | 84 Huntington Dr | Quality Home Builders Construction Inc | revision to 202312051945. infill at rear. reconfigure front facade. replace front windows in -kind.Details
revision to 202312051945. infill at rear. reconfigure front facade. replace front windows in -kind. | $10,000 |
| Dec 22, 2023 | In progress issued Apr 2024 | 667 02nd Av | Red House Construction | reconfigure extg bathroom and add a half bath in both unit floors. 2 remodel bath and 2 new half bath. total 4.Details
reconfigure extg bathroom and add a half bath in both unit floors. 2 remodel bath and 2 new half bath. total 4. | $20,000 |
| Nov 20, 2023 | Completed final sign-off Jul 2024 | 425 Holloway Av | G Construction Service Inc | replace foundation at rear wall, level patio at rer yard with new drain.Details
replace foundation at rear wall, level patio at rer yard with new drain. | $10,000 |
| Nov 1, 2023 | Completed final sign-off Apr 2025 | 723 Lisbon St | Dbf Construction Co Inc | revision to pa 2023-0801-3487 1st fl - add 2 bedrooms, office, media & 1 full bath; 2nd fl - total remodel. relocate rooms & add 1 full bath; attic - add sprial stairs; replace all front windows; add new dormer; new deck & patio at rearDetails
revision to pa 2023-0801-3487 1st fl - add 2 bedrooms, office, media & 1 full bath; 2nd fl - total remodel. relocate rooms & add 1 full bath; attic - add sprial stairs; replace all front windows; add new dormer; new deck & patio at rear | $180,000 |
| Oct 25, 2023 | Completed final sign-off Apr 2024 | 430 Arch St | Astorga Construction Inc | to comply with novs 202308584 and 202311911. new patio at rear on the 1/f less than 3' height.Details
to comply with novs 202308584 and 202311911. new patio at rear on the 1/f less than 3' height. | $3,500 |
| Oct 13, 2023 | Completed final sign-off Jul 2025 | 1426 39th Av | Zhongwei Construction | interior remodel of ground floor addition of bathroom, laundry and office. demolition of non-structural partitions. 2nd floor nic. the rear is modified new doors and windowsDetails
interior remodel of ground floor addition of bathroom, laundry and office. demolition of non-structural partitions. 2nd floor nic. the rear is modified new doors and windows | $60,000 |
| Oct 12, 2023 | Completed final sign-off Apr 2025 | 5624 Fulton St | Tao's Construction Inc. | new deck & stairs at rear of building @ 2nd floor.Details
new deck & stairs at rear of building @ 2nd floor. | $20,000 |
| Sep 7, 2023 | Completed final sign-off Jul 2025 | 2546 35th Av | Two Bricks Design Build | 1st fl. add 3 bedrooms, 2 full bath, office and media 2nd fl. remodel kitchen and bathroom, add 1 full bath infill court yard replace new garage door (wood)Details
1st fl. add 3 bedrooms, 2 full bath, office and media 2nd fl. remodel kitchen and bathroom, add 1 full bath infill court yard replace new garage door (wood) | $280,000 |
| Aug 4, 2023 | Completed final sign-off Jul 2024 | 795 Naples St | Integrity General Construction Inc | 1st flr: infill at rear, add media room, bedroom, office and 2 full baths. 2nd flr: infill light-wells. add 1 full bath and bedroom. remodel (e) bathroom and to relocate kitchen and dining. (e) rear deck to be legalized under separate permit.Details
1st flr: infill at rear, add media room, bedroom, office and 2 full baths. 2nd flr: infill light-wells. add 1 full bath and bedroom. remodel (e) bathroom and to relocate kitchen and dining. (e) rear deck to be legalized under separate permit. | $260,000 |
| Jul 11, 2023 | Completed final sign-off Apr 2025 | 5624 Fulton St | Tao's Construction Inc. | 1f)garage door replace in-kind, upgrade electrical service to 125amps, add 2-bedrm, 2-full baths & 1-media rm, 2f)replace front facade windows in-kind, enclose west & east side lightwell, reconfigure interior layout w/2bedrms, 2-baths, a kitchen, dining & living area. 3f reconfiguire master suite,Details
1f)garage door replace in-kind, upgrade electrical service to 125amps, add 2-bedrm, 2-full baths & 1-media rm, 2f)replace front facade windows in-kind, enclose west & east side lightwell, reconfigure interior layout w/2bedrms, 2-baths, a kitchen, dining & living area. 3f reconfiguire master suite, | $180,000 |
| Jul 7, 2023 | Completed final sign-off Jan 2024 | 1535 31st Av | Mo Construction | 1st flr: add 1-bedroom, 1-family room, 1-full bath, wet bar, and office per plan.Details
1st flr: add 1-bedroom, 1-family room, 1-full bath, wet bar, and office per plan. | $100,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 103 Amazon Av | Youngor Pro Construction | rebuild front stairs and hand rail in-kind. replace side & rear siding with stucco approximately 520 sq.ft. enlarge front garage door opening to 8'-0" wide.Details
rebuild front stairs and hand rail in-kind. replace side & rear siding with stucco approximately 520 sq.ft. enlarge front garage door opening to 8'-0" wide. | $5,000 |
| Jun 26, 2023 | Completed final sign-off Apr 2024 | 1799 Ocean Av | Success Construction ***See Notes*** | accessible business entrance program per ordinance 51-16 proposed ada barrier remediation installation of new powered door operator at entry to comply with accessible business entrance program install new threshold with max 1/2" high threshold ab #201912300482Details
accessible business entrance program per ordinance 51-16 proposed ada barrier remediation installation of new powered door operator at entry to comply with accessible business entrance program install new threshold with max 1/2" high threshold ab #201912300482 | $6,000 |
| Jun 1, 2023 | Completed final sign-off Apr 2024 | 1422 41st Av | ist fl - add 3 bedrooms, 3.5 bath and media; 2nd fl - remodel kitchen and bathroom; add 1 den and 1 full bath; replace front windows with in-kind; replace garage door (wood); in-fill court and lightwellDetails
ist fl - add 3 bedrooms, 3.5 bath and media; 2nd fl - remodel kitchen and bathroom; add 1 den and 1 full bath; replace front windows with in-kind; replace garage door (wood); in-fill court and lightwell | $120,000 | |
| May 26, 2023 | Completed final sign-off Jan 2024 | 1382 07th Av | reconfigure bathroom, add bathroom @ 2/f, interior remodelDetails
reconfigure bathroom, add bathroom @ 2/f, interior remodel | $25,000 | |
| May 24, 2023 | Completed final sign-off Mar 2024 | 36 Harold Av | Nova East Design Build Co. | reconfigure bathroom & add half bath, interior remodel kitchen & baths, modify sloped ceiling.Details
reconfigure bathroom & add half bath, interior remodel kitchen & baths, modify sloped ceiling. | $40,000 |
| May 17, 2023 | Completed final sign-off Dec 2023 | 3446 Balboa St | Seamus Collins Construction, Inc. | new and updated accessibilty for beauty salon spa and massage, update accessible all gender restroom and provide accesible shower, expand (e) salon room for accessible sized room new sfdph app. for beauty salone and massage at 3446 balboa st.Details
new and updated accessibilty for beauty salon spa and massage, update accessible all gender restroom and provide accesible shower, expand (e) salon room for accessible sized room new sfdph app. for beauty salone and massage at 3446 balboa st. | $5,000 |
| May 15, 2023 | Completed final sign-off Sep 2023 | 345 Taraval St | Brendan Lalor Construction | revision to pa 2022-0926-3138. new framed in stair and landing for (e) pbx & internet roomDetails
revision to pa 2022-0926-3138. new framed in stair and landing for (e) pbx & internet room | $5,000 |
| May 10, 2023 | Completed final sign-off Aug 2026 | 1521 Hudson Av | Devoted Construction Incorporated, Ac & Lc Corporation | to comply with nov202302664: legalize increased roof height at rear 10ft of the building. at 3/f & kitchen relocation.Details
to comply with nov202302664: legalize increased roof height at rear 10ft of the building. at 3/f & kitchen relocation. | $5,000 |
| Apr 25, 2023 | Never finaled filed Apr 2023, never issued | 350 Athens St | rev to pa201704073455: reconfigure kitchen & bathroom per layout per plans. enlarge ceiling height of (e) attic.Details
rev to pa201704073455: reconfigure kitchen & bathroom per layout per plans. enlarge ceiling height of (e) attic. | $20,000 | |
| Jan 31, 2023 | Completed final sign-off Sep 2023 | 270 Upland Dr | He & Kuang Inc | rebuild front stair in-kindDetails
rebuild front stair in-kind | $2,000 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 1378 16th Av | Castle Construction | 3rd floor top unit: reconfigure laundry room add a full bathroom.Details
3rd floor top unit: reconfigure laundry room add a full bathroom. | $12,000 |
| Jan 13, 2023 | Never finaled filed Jan 2023, never issued | 31 Ramona Av | Yefa Construction Inc | comply with complaint 200560142. legalize new deck at rearDetails
comply with complaint 200560142. legalize new deck at rear | $50,000 |
| Dec 9, 2022 | Completed final sign-off May 2025 | 145 Miraloma Dr | Success Construction ***See Notes*** | 2nd fl. total remodel layout and convert half bath to a full bathDetails
2nd fl. total remodel layout and convert half bath to a full bath | $70,000 |
| Nov 4, 2022 | Completed final sign-off Dec 2023 | 753 Jackson St | Wah Wong Construction Inc | (e) retail store t.i., response to health insp report. provide new mop sink, replace (e) handsink, (e) tankless hot water heater, replace shelving. new health application formsDetails
(e) retail store t.i., response to health insp report. provide new mop sink, replace (e) handsink, (e) tankless hot water heater, replace shelving. new health application forms | $2,000 |
| Nov 4, 2022 | Expired or cancelled cancelled Jan 2026 | 2883 San Bruno Av | (e) retail store t.i., compliance of health insp report. install walk-in refrigerator unit, new floor sinks, new stainless steel table counter, new display acrylic fish tanks & tank equipment.Details
(e) retail store t.i., compliance of health insp report. install walk-in refrigerator unit, new floor sinks, new stainless steel table counter, new display acrylic fish tanks & tank equipment. | $15,000 | |
| Oct 11, 2022 | Completed final sign-off Nov 2023 | 1218 18th Av | Junda Construction Inc | 1st fl: add utility room. 2nd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom. 3rd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom.cDetails
1st fl: add utility room. 2nd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom. 3rd fl: remodel kitchen, bathroom, add 1 full bath & 1 bedroom.c | $95,000 |
| Sep 26, 2022 | Completed final sign-off Sep 2023 | 345 Taraval St | Brendan Lalor Construction | tenant improvement for remodel of (e) specialty grocery store. update appliances & equipment. ada upgrades. refinish & repaint (e) surfaces & floors.Details
tenant improvement for remodel of (e) specialty grocery store. update appliances & equipment. ada upgrades. refinish & repaint (e) surfaces & floors. | $50,000 |
| Sep 23, 2022 | Completed final sign-off Mar 2023 | 450 Amherst St | Tao's Construction Inc. | replace front window with aluminum clad wood w/fixed/casement windows, w/new 2 rear windows on 2/f floor.Details
replace front window with aluminum clad wood w/fixed/casement windows, w/new 2 rear windows on 2/f floor. | $1,500 |
| Sep 23, 2022 | Completed final sign-off Mar 2023 | 450 Amherst St | Tao's Construction Inc. | 2/f relocate kitchen, remodel 1 bath, and add 1 bathroom and bedroom.Details
2/f relocate kitchen, remodel 1 bath, and add 1 bathroom and bedroom. | $40,000 |
| Sep 23, 2022 | Completed final sign-off Apr 2026 | 1938 Ocean Av | D Construction Inc | 1st floor remodel commercial space into optometry. comply with complaint #202288500, 202288439. relocate the stairs for unit #1940 (2nd fl).Details
1st floor remodel commercial space into optometry. comply with complaint #202288500, 202288439. relocate the stairs for unit #1940 (2nd fl). | $196,000 |