C Plus E Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2025 to Jun 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 2 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jul 2026 | 1630 33rd Av | 1/f: renovate with new media room, bedroom, wetbar, and laundry. 2 new bathrooms. 2/f: infill center patio, new kitchen and bathrooms. new deck at rear.Details
1/f: renovate with new media room, bedroom, wetbar, and laundry. 2 new bathrooms. 2/f: infill center patio, new kitchen and bathrooms. new deck at rear. | $200,000 |
| Mar 6, 2026 | In progress issued Mar 2026 | 1786 36th Av | 1st fl - add family, den and 1 full bath; 2nd fl - infill lightwell on south side; remodel kitchen and bath, add 1 full bath, reconfigure, interior stairs; replace front windows with wood windowsDetails
1st fl - add family, den and 1 full bath; 2nd fl - infill lightwell on south side; remodel kitchen and bath, add 1 full bath, reconfigure, interior stairs; replace front windows with wood windows | $300,000 |
| Dec 19, 2025 | Completed final sign-off Sep 2026 | 975 Darien Wy | revision to #202504174661, new stucco on the front side of property, replace five windows on the front side of house, same location, same opening, wood to vinyl, max u factor 0.3Details
revision to #202504174661, new stucco on the front side of property, replace five windows on the front side of house, same location, same opening, wood to vinyl, max u factor 0.3 | $10,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 1434 25th Av | 1st fl: add media room, 2 full bath and 1 bedroom. 2nd fl: remodel kitchen, add 1/2 bath, replace (e) deck at rear. 3rd fl: remodel bath, add 1 full bath. add roof deck at rear.Details
1st fl: add media room, 2 full bath and 1 bedroom. 2nd fl: remodel kitchen, add 1/2 bath, replace (e) deck at rear. 3rd fl: remodel bath, add 1 full bath. add roof deck at rear. | $300,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 110 Forest Side Av | 1/f: add 2 bedroom, 2 full bath, office and family room. 2/f: remodel kitchen and bath, add 1.5 bath. 3/f: remodel bath.Details
1/f: add 2 bedroom, 2 full bath, office and family room. 2/f: remodel kitchen and bath, add 1.5 bath. 3/f: remodel bath. | $350,000 |
| Nov 14, 2025 | In progress issued Nov 2025 | 311 Shotwell St | revision to pa# 202501037706: replace front windows with wood. revise mechanical pwoer to include radiant heating and mini split unit with ac. remove duct leakage special inspection. windows at front ot be wood or wood aluminum clad hung windowsDetails
revision to pa# 202501037706: replace front windows with wood. revise mechanical pwoer to include radiant heating and mini split unit with ac. remove duct leakage special inspection. windows at front ot be wood or wood aluminum clad hung windows | $2,000 |
| Apr 17, 2025 | Completed final sign-off Sep 2026 | 975 Darien Wy | add (n) rear deck, 2 bedrooms, bathroom & laundry room on 1/f. relocate interior staircase & kitchen on 2/f. add (n) master bathrooms & closets on 2/f.Details
add (n) rear deck, 2 bedrooms, bathroom & laundry room on 1/f. relocate interior staircase & kitchen on 2/f. add (n) master bathrooms & closets on 2/f. | $200,000 |
| Mar 5, 2025 | In progress issued Oct 2025 | 311 Shotwell St | 1/f: add 2 bedrooms, 2 full baths, laundry, and media. 2/f: remodel kitchen and bathroom. add family room. 3/f: convert attic into living space, add 1 bedroom and bathroom. add new patio and deck at rear. add 4 formers, infill lightwell.Details
1/f: add 2 bedrooms, 2 full baths, laundry, and media. 2/f: remodel kitchen and bathroom. add family room. 3/f: convert attic into living space, add 1 bedroom and bathroom. add new patio and deck at rear. add 4 formers, infill lightwell. | $250,000 |