Block 1867, lot 016
1595 21st Ave
- City’s use
- Single Family Residential
- Built
- 1931
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,169 sq ft
- Lot
- 2,374 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2026 | Expired or cancelled suspend Aug 2026 | 1595 21st Av | W J L Construction Inc | revision to #202510157454: 1/f reconfigure layout. turn half into full bath. 2/f: reconfigure bathroom layout. replace front & side stucco with in-kind. infill lightwell.Details
revision to #202510157454: 1/f reconfigure layout. turn half into full bath. 2/f: reconfigure bathroom layout. replace front & side stucco with in-kind. infill lightwell. | $9,000 |
| Oct 15, 2025 | Expired or cancelled suspend Jul 2026 | 1595 21st Av | W J L Construction Inc | 1st flr: remodel (e) bedrooms and bathrooms. add media. 1 bedroom and powder room. 2nd flr: total remodel. reconfigure kitchen and dining. add 2 full baths and office. relocate laundry and utilities. replace front and side windows with vinyl. new patio at rear.Details
1st flr: remodel (e) bedrooms and bathrooms. add media. 1 bedroom and powder room. 2nd flr: total remodel. reconfigure kitchen and dining. add 2 full baths and office. relocate laundry and utilities. replace front and side windows with vinyl. new patio at rear. | $200,000 |
| Aug 4, 2021 | Completed final sign-off Sep 2021 | 1595 21st Av | F Liu Construction | replace exterior wood siding at rear of house approx. 550 sf.Details
replace exterior wood siding at rear of house approx. 550 sf. | $2,000 |
| Oct 9, 2008 | Completed final sign-off Aug 2009 | 1595 21st Av | renew pa# 2005/12/05/9503 to start & complete work.Details
renew pa# 2005/12/05/9503 to start & complete work. | $500 | |
| Oct 9, 2008 | Completed final sign-off Aug 2009 | 1595 21st Av | renew pa# 2005/12/09/9989 to start & complete work.Details
renew pa# 2005/12/09/9989 to start & complete work. | $4,000 | |
| Dec 9, 2005 | Expired or cancelled expired Aug 2009 | 1595 21st Av | add bathroom in garage spaceDetails
add bathroom in garage space | $4,000 | |
| Dec 5, 2005 | Expired or cancelled expired Apr 2011 | 1595 21st Av | change sheetrock to 5/8 inch in storage room move washer and dryer from storage room to the garageDetails
change sheetrock to 5/8 inch in storage room move washer and dryer from storage room to the garage | $500 | |
| Jun 15, 2004 | Completed final sign-off Jul 2004 | 1595 21st Av | Y D Construction Co. Inc. | repair stucco dry rot underneath window & above garage door, plus part of side of wallDetails
repair stucco dry rot underneath window & above garage door, plus part of side of wall | $4,000 |
| May 20, 2004 | Completed final sign-off Jul 2004 | 1595 21st Av | repair stucco dry rot underneath window & above garage door x/50 sq ftDetails
repair stucco dry rot underneath window & above garage door x/50 sq ft | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- W J L Construction Inc (2), F Liu Construction, Y D Construction Co. Inc.
- Engineers
- Jingbo Yang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.