Jun Hong Zhou
- Listed as
- contractor, designer
- Firm
- Hong's General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2013 to Aug 2026
165 permits since 2000 (contractor on 165 permits, designer on 1 permit): 110 completed, 19 in progress, 24 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 165.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 180 De Soto St | Hong's General Construction Inc | recommencement and completion of work approved under pa#202501178619.Details
recommencement and completion of work approved under pa#202501178619. | $93,000 |
| Aug 19, 2026 | In progress issued Aug 2026 | 2342 26th Av | Hong's General Construction Inc | comply with complaint# 202660766. repair front stair in kind. less than 50%.Details
comply with complaint# 202660766. repair front stair in kind. less than 50%. | $3,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 1444 Ulloa St | Hong's General Construction Inc | 1st fl - add 2 bedroom, 2.5 bath and laundry; 2nd fl remodel kitchen and bathroom; in-fill lightwellDetails
1st fl - add 2 bedroom, 2.5 bath and laundry; 2nd fl remodel kitchen and bathroom; in-fill lightwell | $110,000 |
| Jul 24, 2026 | In progress issued Jul 2026 | 1423 31st Av | Hong's General Construction Inc | remodel (e) upstairs kitchen (180 sf) and (2) bathrooms (80 sf), in-kind. ho new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5.Details
remodel (e) upstairs kitchen (180 sf) and (2) bathrooms (80 sf), in-kind. ho new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5. | $45,000 |
| Jul 6, 2026 | Expired or cancelled cancelled Aug 2026 | 180 De Soto St | Hong's General Construction Inc | to obtain final inspection for work approved under pa# 202501178619. all work is complete.Details
to obtain final inspection for work approved under pa# 202501178619. all work is complete. | |
| Jul 2, 2026 | In progress issued Jul 2026 | 55 Oliver St | Hong's General Construction Inc | interior remodel/convert 1st fl into living space. 2nd fl - add new deck in the rear; 1st fl - add new bathrooms, new office, new bedrooms, new living room and storageDetails
interior remodel/convert 1st fl into living space. 2nd fl - add new deck in the rear; 1st fl - add new bathrooms, new office, new bedrooms, new living room and storage | $150,000 |
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 38 Chenery St | Hong's General Construction Inc | revision to pa# 202101192880, to use state adu program instead of local program, to remove the fire sprinklers as no longer required under adu r3, keep 2ft existing nonconforming rear structure, remove side door into exterior hallway. no change to building envelope.Details
revision to pa# 202101192880, to use state adu program instead of local program, to remove the fire sprinklers as no longer required under adu r3, keep 2ft existing nonconforming rear structure, remove side door into exterior hallway. no change to building envelope. | $1,000 |
| Apr 30, 2026 | In progress issued Jul 2026 | 57 Loomis St | Hong's General Construction Inc | to comply with complaint 202545245 of (e) commercial space. no change of use or t.i. to show as-built conditions. removal of non permitted work, installation of metal decking and bringing existing restroom to compliance.Details
to comply with complaint 202545245 of (e) commercial space. no change of use or t.i. to show as-built conditions. removal of non permitted work, installation of metal decking and bringing existing restroom to compliance. | $5,000 |
| Apr 24, 2026 | Completed final sign-off Jun 2026 | 235 Holyoke St | Hong's General Construction Inc | to comply with nov 202426211 - infill internal stair, addition of bathroom and walls, and bathroom remodel.Details
to comply with nov 202426211 - infill internal stair, addition of bathroom and walls, and bathroom remodel. | $10,000 |
| Mar 27, 2026 | Completed final sign-off Mar 2026 | 2124 18th Av | Hong's General Construction Inc | rev 202508122872: overlay tiles in (e) front stairs in-kind.Details
rev 202508122872: overlay tiles in (e) front stairs in-kind. | $4,000 |
| Jan 28, 2026 | In progress issued Feb 2026 | 21 Hollywood Ct | Hong's General Construction Inc | 1st fl - add family room; 2nd fl - remodel kitchen and bathroom, add 1 full bath and office; repair interior stairsDetails
1st fl - add family room; 2nd fl - remodel kitchen and bathroom, add 1 full bath and office; repair interior stairs | $78,000 |
| Jan 20, 2026 | In progress issued Mar 2026 | 2342 26th Av | Hong's General Construction Inc | 1st fl - relocate family, bathrm and laundry; add wet bar and bedrm; 2nd fl - reconfigure family, kitchen and dining rooms; remodel (e) bedrooms and bathrooms per layout; new patio at rear; new skylightDetails
1st fl - relocate family, bathrm and laundry; add wet bar and bedrm; 2nd fl - reconfigure family, kitchen and dining rooms; remodel (e) bedrooms and bathrooms per layout; new patio at rear; new skylight | $230,000 |
| Jan 15, 2026 | Completed final sign-off Sep 2026 | 24 Lawrence Av | Hong's General Construction Inc | 1/f: add 2 bedroom, 1 full bath , family room. 2/f: remodel kitchen, bathroom. add 1 full bath. infill lightwell. add new deck at rear. replace front windows in-kind (vinyl).Details
1/f: add 2 bedroom, 1 full bath , family room. 2/f: remodel kitchen, bathroom. add 1 full bath. infill lightwell. add new deck at rear. replace front windows in-kind (vinyl). | $130,000 |
| Oct 21, 2025 | In progress issued Oct 2025 | 180 De Soto St | Hong's General Construction Inc | replace existing plaster to 5/8" type x sheetrock for walls and ceilings at: 1st fl: master suite, bedroom, office, living room and family room, 2nd fl: (n) suite.Details
replace existing plaster to 5/8" type x sheetrock for walls and ceilings at: 1st fl: master suite, bedroom, office, living room and family room, 2nd fl: (n) suite. | $28,000 |
| Oct 17, 2025 | In progress issued Oct 2025 | 200 Colon Av | Hong's General Construction Inc | add 1 more bathroom on main floor.Details
add 1 more bathroom on main floor. | $20,000 |
| Sep 24, 2025 | In progress issued Oct 2025 | 1009 Portola Dr | Hong's General Construction Inc | 1/f: add 2 bedroom, 2 full bath and family. 2/f: remodel kitchen and bathroom, add 1 full bath, add patio at rear. 9 new vinyl windows, new side stair with 1 hr rated wall, 2 replacement rear windows with vinyl.Details
1/f: add 2 bedroom, 2 full bath and family. 2/f: remodel kitchen and bathroom, add 1 full bath, add patio at rear. 9 new vinyl windows, new side stair with 1 hr rated wall, 2 replacement rear windows with vinyl. | $150,000 |
| Sep 24, 2025 | Completed final sign-off Oct 2025 | 1224 Athens St | Hong's General Construction Inc | revision to 202410012096 - reduce bedroom size to add an office on 1/f garage level.Details
revision to 202410012096 - reduce bedroom size to add an office on 1/f garage level. | |
| Aug 14, 2025 | Completed final sign-off Apr 2026 | 735 Naples St | Hong's General Construction Inc | repair fire damage in compliance to nov 202538013: repair and replace plumbing and electrical systems in front unit and back unit. repair doors from fire damage front of home, street visible,. replace drywall damaged with 5/8" type x sheetrock at ceiling and walls . all in kind.Details
repair fire damage in compliance to nov 202538013: repair and replace plumbing and electrical systems in front unit and back unit. repair doors from fire damage front of home, street visible,. replace drywall damaged with 5/8" type x sheetrock at ceiling and walls . all in kind. | $10,000 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 2124 18th Av | Hong's General Construction Inc | 1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear.Details
1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear. | $190,000 |
| Aug 12, 2025 | Completed final sign-off Apr 2026 | 571 Gates St | Hong's General Construction Inc | revision to pa # 2024-0716-6597. 2nd fl: reconfigure front bedroom layout. add built in closet at rear bedroom. new bathtub in bedroom.Details
revision to pa # 2024-0716-6597. 2nd fl: reconfigure front bedroom layout. add built in closet at rear bedroom. new bathtub in bedroom. | |
| Jul 29, 2025 | Completed final sign-off Sep 2025 | 1851 Stockton St | Hong's General Construction Inc | unit b : repair back yard wood stairs in kind less than 50%. not street visible.Details
unit b : repair back yard wood stairs in kind less than 50%. not street visible. | $8,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 2055 42nd Av | Hong's General Construction Inc | 2nd fl: change e) bedroom to new office. in fill light well & new sky lightDetails
2nd fl: change e) bedroom to new office. in fill light well & new sky light | $5,000 |
| May 28, 2025 | Completed final sign-off Aug 2025 | 26 Albion St | Hong's General Construction Inc | remodel existing kitchen, one full bathroom with shower and one powder room.Details
remodel existing kitchen, one full bathroom with shower and one powder room. | $50,000 |
| May 12, 2025 | Completed final sign-off Jun 2025 | 78 Lee Av | Hong's General Construction Inc | repair or replace siding hardie plank in kind on left side of building, around 1000 sqft. not street visible.Details
repair or replace siding hardie plank in kind on left side of building, around 1000 sqft. not street visible. | $10,000 |
| May 9, 2025 | In progress issued Nov 2025 | 180 De Soto St | Hong's General Construction Inc | provide temporary shoring to facilitate excavation & construction of this proposed remodel per pa# 202503253026Details
provide temporary shoring to facilitate excavation & construction of this proposed remodel per pa# 202503253026 | $8,000 |
| Apr 21, 2025 | In progress issued Sep 2025 | 180 De Soto St | Hong's General Construction Inc | excavating e) basement to create 9' ceiling & add new bathroom, bedroom, and family room at basement level. align exterior wall below first floor roof deck at south elevationDetails
excavating e) basement to create 9' ceiling & add new bathroom, bedroom, and family room at basement level. align exterior wall below first floor roof deck at south elevation | $100,000 |
| Mar 14, 2025 | Completed final sign-off Jan 2026 | 2347 42nd Av | Hong's General Construction Inc | 1st floor: remodel (e) bathroom 2nd floor: remove 2'-6" section of partition wall at kitchen.Details
1st floor: remodel (e) bathroom 2nd floor: remove 2'-6" section of partition wall at kitchen. | $10,000 |
| Feb 25, 2025 | Completed final sign-off Sep 2025 | 430 Rolph St | Hong's General Construction Inc | revision to pa 202410304066: 1st fl - resize (n) bedroom; 2nd fl - reconfigure kitchen & (n) bathroom layout; reconfigure interior stairDetails
revision to pa 202410304066: 1st fl - resize (n) bedroom; 2nd fl - reconfigure kitchen & (n) bathroom layout; reconfigure interior stair | |
| Jan 17, 2025 | In progress issued Apr 2025 | 180 De Soto St | Hong's General Construction Inc | interior remodel: reconfigure 1st/f with new bathrooms & remoel (e) kitchen. enlarge 2/f bathroom. no change of (e) building envelope and facade. no habitable sf ft addedDetails
interior remodel: reconfigure 1st/f with new bathrooms & remoel (e) kitchen. enlarge 2/f bathroom. no change of (e) building envelope and facade. no habitable sf ft added | $68,000 |
| Dec 17, 2024 | Completed final sign-off Feb 2025 | 78 Lee Av | Hong's General Construction Inc | comply to nov 202426949. new landscape in front of propertyDetails
comply to nov 202426949. new landscape in front of property | $3,500 |
| Dec 6, 2024 | Completed final sign-off Dec 2024 | 154 Gaven St | Hong's General Construction Inc | to obtain final inspection for work approved under pa#202106253278. all work is complete.Details
to obtain final inspection for work approved under pa#202106253278. all work is complete. | |
| Oct 30, 2024 | Completed final sign-off Sep 2025 | 430 Rolph St | Hong's General Construction Inc | 1st fl: add family room with wet bar, 1 full bath & 2 bedrooms. relocate laundry & utilities. 2nd fl: total remodel, add 2 (n) bedrooms & 1 full bath. new patio at rear. all new window and door with fiberglassDetails
1st fl: add family room with wet bar, 1 full bath & 2 bedrooms. relocate laundry & utilities. 2nd fl: total remodel, add 2 (n) bedrooms & 1 full bath. new patio at rear. all new window and door with fiberglass | $230,000 |
| Oct 16, 2024 | In progress issued Jan 2025 | 1747 Buchanan St | 328 Construction, Hong's General Construction Inc | tenant impovement to e ground floor restaurant at 1747 buchanan stDetails
tenant impovement to e ground floor restaurant at 1747 buchanan st | $180,000 |
| Oct 1, 2024 | Completed final sign-off Oct 2025 | 1224 Athens St | Hong's General Construction Inc | 1st fl: add 2 bedrooms, 2 full baths, and wet bar. relocate laundry and utilities. 2nd fl: add 1 full bath, remodel living and dining room. 3rd fl: convert bedrm to office, remodel bathrooms. replace sheetrock throughout. infill and new deck at rearDetails
1st fl: add 2 bedrooms, 2 full baths, and wet bar. relocate laundry and utilities. 2nd fl: add 1 full bath, remodel living and dining room. 3rd fl: convert bedrm to office, remodel bathrooms. replace sheetrock throughout. infill and new deck at rear | $150,000 |
| Sep 18, 2024 | Completed final sign-off Oct 2024 | 9 Mayfair Dr | Hong's General Construction Inc | revision to pa# 202310209124. to correct sheet a-2.3 deck joist to 2x8 @ 12 o.c., no posts adjacent to building.Details
revision to pa# 202310209124. to correct sheet a-2.3 deck joist to 2x8 @ 12 o.c., no posts adjacent to building. | $600 |
| Aug 5, 2024 | Completed final sign-off May 2025 | 2055 42nd Av | Hong's General Construction Inc | 1st fl adu prev approved. 2nd fl: remove internal stair, reconfigure bathrooms lyout add deck and stair to connect rear yard and 2nd flDetails
1st fl adu prev approved. 2nd fl: remove internal stair, reconfigure bathrooms lyout add deck and stair to connect rear yard and 2nd fl | $30,000 |
| Jul 16, 2024 | Completed final sign-off Apr 2026 | 571 Gates St | Hong's General Construction Inc | 1st fl: relocate kitchen & living room from 2nd fl. add powder room. 2nd fl: remodel bedrooms and bathroom. add 1 bedroom & 1 full bath. replace new fence 6' high at rear. add new patio at rear. replace garage door with wood in kind. 2 story rear additionDetails
1st fl: relocate kitchen & living room from 2nd fl. add powder room. 2nd fl: remodel bedrooms and bathroom. add 1 bedroom & 1 full bath. replace new fence 6' high at rear. add new patio at rear. replace garage door with wood in kind. 2 story rear addition | $150,000 |
| Jul 3, 2024 | In progress filed Jul 2024, not yet issued | 1747 Buchanan St | Hong's General Construction Inc | exploratory work at ceiling and walls. remove 3ft x 3ft sections to inspect ceiling framing and wall framing. re-sheetrock openings after inspection. no remodel under this permit.Details
exploratory work at ceiling and walls. remove 3ft x 3ft sections to inspect ceiling framing and wall framing. re-sheetrock openings after inspection. no remodel under this permit. | $2,000 |
| May 29, 2024 | In progress filed May 2024, not yet issued | 3529 Mission St | Hong's General Construction Inc | to comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building.Details
to comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building. | $180,000 |
| Apr 9, 2024 | Completed final sign-off Sep 2025 | 494 46th Av | Hong's General Construction Inc | replace 26 windows in kind street visible. to be aluminum-clad woodDetails
replace 26 windows in kind street visible. to be aluminum-clad wood | $10,000 |
| Apr 8, 2024 | Completed final sign-off May 2025 | 2307 35th Av | Hong's General Construction Inc | revision to pa # 202311291568 for minor wall layout change on g/f.Details
revision to pa # 202311291568 for minor wall layout change on g/f. | |
| Mar 29, 2024 | Completed final sign-off Sep 2025 | 494 46th Av | Hong's General Construction Inc | 1/f: add 2 bedrooms, 2 full baths, family room and laundry. 2/f: remodel kitchen and bath, add 1 full bath and interior stairs.Details
1/f: add 2 bedrooms, 2 full baths, family room and laundry. 2/f: remodel kitchen and bath, add 1 full bath and interior stairs. | $300,000 |
| Mar 12, 2024 | Completed final sign-off Aug 2024 | 224 Shields St | Hong's General Construction Inc | 1st fl: add new full bathroom. 2nd fl: add new shower, add new workshop 3rd fl: add new full bathroomDetails
1st fl: add new full bathroom. 2nd fl: add new shower, add new workshop 3rd fl: add new full bathroom | $10,000 |
| Mar 12, 2024 | Completed final sign-off Apr 2024 | 1738 22nd Av | Hong's General Construction Inc | new landscape at front setbackDetails
new landscape at front setback | $2,000 |
| Feb 28, 2024 | Completed final sign-off May 2025 | 2307 35th Av | Hong's General Construction Inc | revision pa #202311291568: move partition wall forward to garage & move bathroom to bedroom at g/f. replace partial (e) footing w/ new (25'-0" lf).Details
revision pa #202311291568: move partition wall forward to garage & move bathroom to bedroom at g/f. replace partial (e) footing w/ new (25'-0" lf). | $15,000 |
| Nov 29, 2023 | Completed final sign-off May 2025 | 2307 35th Av | Hong's General Construction Inc | construct 2 bedroom, 2 bath, media room, install wet bar at gr fl. remodel kitchen, bath, construct 1 new bath rm and study room at 2nd fl; seismic strengthen upper an lowr levelDetails
construct 2 bedroom, 2 bath, media room, install wet bar at gr fl. remodel kitchen, bath, construct 1 new bath rm and study room at 2nd fl; seismic strengthen upper an lowr level | $234,960 |
| Nov 28, 2023 | Completed final sign-off Mar 2025 | 1101 Silliman St | Hong's General Construction Inc | 1/f: add 2-bedrooms, 1-full bathroom & media room.Details
1/f: add 2-bedrooms, 1-full bathroom & media room. | $65,000 |
| Oct 20, 2023 | Completed final sign-off Oct 2024 | 9 Mayfair Dr | Hong's General Construction Inc | proposed new deck platform to access the backyard at 2nd fl with new sliding door. at 1st fl modify existing exterior stair to comply with todays code and easy to access the upper back yard. relocated existing furnace to 2nd and 3rd fls. no change of existing building envelope at front facadeDetails
proposed new deck platform to access the backyard at 2nd fl with new sliding door. at 1st fl modify existing exterior stair to comply with todays code and easy to access the upper back yard. relocated existing furnace to 2nd and 3rd fls. no change of existing building envelope at front facade | $13,000 |
| Oct 19, 2023 | Completed final sign-off May 2024 | 165 Madrid St | Hong's General Construction Inc | add one more layer of cement hard siding on (e) siding in kind, right side and left side around 1900 sq ft. not visible from st.Details
add one more layer of cement hard siding on (e) siding in kind, right side and left side around 1900 sq ft. not visible from st. | $15,000 |
| Oct 13, 2023 | Completed final sign-off Jan 2024 | 2241 17th Av | Hong's General Construction Inc | revision to pa#: 202304075341. 1st flr: resize bedroom, bathroom, and closet. 2nd floor: relocate kitchen sink to islandDetails
revision to pa#: 202304075341. 1st flr: resize bedroom, bathroom, and closet. 2nd floor: relocate kitchen sink to island | |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 1738 22nd Av | Hong's General Construction Inc | structural revision to pa# 202306210544. new beam at living room, replace foundation at g/fDetails
structural revision to pa# 202306210544. new beam at living room, replace foundation at g/f | $18,000 |
| Jun 21, 2023 | Completed final sign-off Apr 2024 | 1738 22nd Av | Hong's General Construction Inc | to comply w/ nov #202303319: 1st fl. add 2 bed rooms, 2 full bath and media. 2nd fl. remodel kitchen and bathroom, add 1 den and 1 full bath, add new deck at rear. replace front windows with in-kind alum clad wood, replace fire damage siding (north)Details
to comply w/ nov #202303319: 1st fl. add 2 bed rooms, 2 full bath and media. 2nd fl. remodel kitchen and bathroom, add 1 den and 1 full bath, add new deck at rear. replace front windows with in-kind alum clad wood, replace fire damage siding (north) | $430,000 |
| Jun 16, 2023 | Completed final sign-off Jun 2024 | 9 Mayfair Dr | Hong's General Construction Inc | replace (e) windows in kind w/wood material total 10 windows, 4 facing the front street, and 6 on the side of the house. u-factor = 0.30 maxDetails
replace (e) windows in kind w/wood material total 10 windows, 4 facing the front street, and 6 on the side of the house. u-factor = 0.30 max | $20,000 |
| Jun 8, 2023 | Completed final sign-off Feb 2024 | 248 Ordway St | Hong's General Construction Inc | replace front 2 windows in kind with thin profile fiberglass window. basement: add office, family rm, 1 full bath, 1 media, & storage. 1/f: add full bath, den & laundry. 2/f: remodel kitchen & bath. (total add living space 975 sf) new rear deck.Details
replace front 2 windows in kind with thin profile fiberglass window. basement: add office, family rm, 1 full bath, 1 media, & storage. 1/f: add full bath, den & laundry. 2/f: remodel kitchen & bath. (total add living space 975 sf) new rear deck. | $220,000 |
| Jun 2, 2023 | Never finaled issued Jun 2023, no final | 38 Chenery St | Hong's General Construction Inc | front siding in-kind around 600 sqft, replace in kind . repair front of stairs in kind less than 50%Details
front siding in-kind around 600 sqft, replace in kind . repair front of stairs in kind less than 50% | $10,000 |
| Jun 2, 2023 | Completed final sign-off Oct 2023 | 1101 Silliman St | Hong's General Construction Inc | remodel one full bathroom on second floor to comply w/ nov# 202307700. no new wall and no existing wall relocation. plumbing fixtures count remain same. new lighting shall comply with cec 150.0 (k)5.Details
remodel one full bathroom on second floor to comply w/ nov# 202307700. no new wall and no existing wall relocation. plumbing fixtures count remain same. new lighting shall comply with cec 150.0 (k)5. | $15,000 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 177 Baltimore Wy | Hong's General Construction Inc | revision to t202210033608. 1st fl: 1 new window on north east (left side) not visible from the street. change family room to media room.Details
revision to t202210033608. 1st fl: 1 new window on north east (left side) not visible from the street. change family room to media room. | $500 |
| May 18, 2023 | Completed final sign-off Sep 2023 | 567 Head St | Hong's General Construction Inc | revision to bpa#202304145789, add new deck @ rearDetails
revision to bpa#202304145789, add new deck @ rear | $15,000 |
| Apr 14, 2023 | Completed final sign-off Sep 2023 | 567 Head St | Hong's General Construction Inc | 1st fl new bedroom, family and full bath. 2nd fl remodel kitchen, bath, living rm, replace interior stair.Details
1st fl new bedroom, family and full bath. 2nd fl remodel kitchen, bath, living rm, replace interior stair. | $130,000 |
| Apr 7, 2023 | Completed final sign-off Jan 2024 | 2241 17th Av | Hong's General Construction Inc | 1/f: add 2 bedrooms, media, home office and 2 full bath. add new patio. 2/f: remodel kitchen, bathroom. add 1 full bath. 5 new skylights infill lightwellsDetails
1/f: add 2 bedrooms, media, home office and 2 full bath. add new patio. 2/f: remodel kitchen, bathroom. add 1 full bath. 5 new skylights infill lightwells | $150,000 |
| Apr 4, 2023 | Completed final sign-off Apr 2023 | 1260 Alemany Bl | Hong's General Construction Inc | revision to bpa# 202209061902: no windows replacements.Details
revision to bpa# 202209061902: no windows replacements. | $3,000 |
| Mar 1, 2023 | Completed final sign-off Jun 2024 | 9 Mayfair Dr | Hong's General Construction Inc | interior remodel on 2nd and 3rd floor. remodel extg 2 kitchens and extg 2 bathrooms. adding 2 new bathrooms. no work on 1st floor. no change of front and bldg envelope. remove 2nd fl fireplaceDetails
interior remodel on 2nd and 3rd floor. remodel extg 2 kitchens and extg 2 bathrooms. adding 2 new bathrooms. no work on 1st floor. no change of front and bldg envelope. remove 2nd fl fireplace | $87,000 |
| Jan 19, 2023 | Completed final sign-off May 2025 | 2055 42nd Av | Hong's General Construction Inc | comply with nov #201488731 and nov #201714481. legalizing of dwelling unit on 1st floor per adu program under state program. remodel of 2nd floor, new deck @ rear yard under separate permit.Details
comply with nov #201488731 and nov #201714481. legalizing of dwelling unit on 1st floor per adu program under state program. remodel of 2nd floor, new deck @ rear yard under separate permit. | $80,000 |
| Dec 5, 2022 | Completed final sign-off Oct 2023 | 271 Seneca Av | Hong's General Construction Inc | construct 2 bedroom, 2 bathroom, & media room at g/f. add 1 full bathroom at 2/f.Details
construct 2 bedroom, 2 bathroom, & media room at g/f. add 1 full bathroom at 2/f. | $145,000 |
| Nov 1, 2022 | Expired or cancelled cancelled May 2025 | 2055 42nd Av | Hong's General Construction Inc | replace first floor and second floor sheetrock in the rear area. around 450 sq ft, where the weater leak damaged. (does not cover 3 currently active his complaints.)Details
replace first floor and second floor sheetrock in the rear area. around 450 sq ft, where the weater leak damaged. (does not cover 3 currently active his complaints.) | $1,500 |
| Oct 18, 2022 | Completed final sign-off Jun 2023 | 177 Baltimore Wy | Hong's General Construction Inc | replace 3 front windows in kind with aluminum clad woodDetails
replace 3 front windows in kind with aluminum clad wood | $800 |
| Oct 3, 2022 | Completed final sign-off Jun 2023 | 177 Baltimore Wy | Hong's General Construction Inc | 1st fl: add 2 bedrooms, family and 1 full bath. 2nd fl: remodel kitchen, bathroom, add 1 full bath.Details
1st fl: add 2 bedrooms, family and 1 full bath. 2nd fl: remodel kitchen, bathroom, add 1 full bath. | $85,000 |
| Sep 6, 2022 | Completed final sign-off Apr 2023 | 1260 Alemany Bl | Hong's General Construction Inc | repair front in kind stucco on bay. replace 4 front windows like for like, aluminum. same size, same location max u-factor 0.30Details
repair front in kind stucco on bay. replace 4 front windows like for like, aluminum. same size, same location max u-factor 0.30 | $10,000 |
| Aug 23, 2022 | Completed final sign-off Feb 2026 | 494 46th Av | Hong's General Construction Inc | remove the water damaged sheet rock in the second floor bedroom around 250 sq ft. dig six holes in the basement to observe how deep the foundation is. refill hole.Details
remove the water damaged sheet rock in the second floor bedroom around 250 sq ft. dig six holes in the basement to observe how deep the foundation is. refill hole. | $1,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2023 | 271 Seneca Av | Hong's General Construction Inc | remodel existing kitchen and existing bathroom with shower. add recess light in living room. dinner room, kitchenDetails
remodel existing kitchen and existing bathroom with shower. add recess light in living room. dinner room, kitchen | $46,000 |
| May 31, 2022 | Expired or cancelled cancelled Mar 2024 | 3529 Mission St | Hong's General Construction Inc | revision under pa #201802090958: comply w/ complaint #202290782 - install 2x4 stud wall in living room for new bedroom on 2nd floor. convert back to original at attic space.Details
revision under pa #201802090958: comply w/ complaint #202290782 - install 2x4 stud wall in living room for new bedroom on 2nd floor. convert back to original at attic space. | $12,000 |
| May 23, 2022 | Completed final sign-off May 2023 | 165 Madrid St | Hong's General Construction Inc | comply with complaint# 202290801. construct 1 full bathroom & media room. all work at ground floor.Details
comply with complaint# 202290801. construct 1 full bathroom & media room. all work at ground floor. | $42,000 |
| May 18, 2022 | Completed final sign-off Oct 2024 | 139 San Pablo Av | Hong's General Construction Inc | g/f: convert unconditioned space to condition space with new bedroom. 3 street facing windows to be replace. no change in footprint is proposed. amend to (e) 202204262968 as additional work.Details
g/f: convert unconditioned space to condition space with new bedroom. 3 street facing windows to be replace. no change in footprint is proposed. amend to (e) 202204262968 as additional work. | $20,000 |
| May 17, 2022 | Completed final sign-off Nov 2022 | 520 Brazil Av | Hong's General Construction Inc | 1st fl: add 1 den, media, family room and full bath. 2nd fl: remodel kitchen, bathroom add 1 full bath and interior stair.Details
1st fl: add 1 den, media, family room and full bath. 2nd fl: remodel kitchen, bathroom add 1 full bath and interior stair. | $120,000 |
| Apr 26, 2022 | Completed final sign-off Oct 2024 | 139 San Pablo Av | Hong's General Construction Inc | add bathroom & laundry to interior. no increase in bldg footprint.Details
add bathroom & laundry to interior. no increase in bldg footprint. | $24,000 |
| Apr 19, 2022 | Completed final sign-off Feb 2023 | 1254 36th Av | Hong's General Construction Inc | revision under pa #202202077454: replace (e) foundation to accomodate lowering of (e) floor height (approx. 12")Details
revision under pa #202202077454: replace (e) foundation to accomodate lowering of (e) floor height (approx. 12") | $28,000 |
| Apr 8, 2022 | Completed final sign-off Jul 2022 | 1208 Stockton St | Hong's General Construction Inc | remodel 4 (e) bathroom in-kind with shower pan. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5.Details
remodel 4 (e) bathroom in-kind with shower pan. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5. | $60,000 |
| Apr 4, 2022 | Never finaled issued Apr 2022, no final | 3529 Mission St | Hong's General Construction Inc | recommencement and completion of work approved under pa#201802090958.Details
recommencement and completion of work approved under pa#201802090958. | $70,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 431 32nd Av | Hong's General Construction Inc | construct 1 bedroom, 1 full bath, & family room at g/f. replace partial existing footing w/ new.Details
construct 1 bedroom, 1 full bath, & family room at g/f. replace partial existing footing w/ new. | $90,000 |
| Feb 23, 2022 | Completed final sign-off Jul 2022 | 22 Bridgeview Dr | Hong's General Construction Inc | replace new siding on the rear area, all in kind and right side area. total 900 sq. ft.Details
replace new siding on the rear area, all in kind and right side area. total 900 sq. ft. | $13,000 |
| Feb 23, 2022 | Completed final sign-off Dec 2022 | 1390 Hampshire St | Hong's General Construction Inc | 1st fl: remove (e) shed at rear. reconfigure 2-bed & 1-bath. infill south side lightwell. add wetbar, 1 media rm, 1 bath & wic. replace wall with handrail. relocate mech appliances. add laundry unit. 2nd fl: reconfigure interior layout with 2-bed, 1 master bath & wic, common bath & office, kitchen,Details
1st fl: remove (e) shed at rear. reconfigure 2-bed & 1-bath. infill south side lightwell. add wetbar, 1 media rm, 1 bath & wic. replace wall with handrail. relocate mech appliances. add laundry unit. 2nd fl: reconfigure interior layout with 2-bed, 1 master bath & wic, common bath & office, kitchen, | $80,000 |
| Feb 18, 2022 | Completed final sign-off Aug 2022 | 431 32nd Av | Hong's General Construction Inc | relocate kitchen, remodel bathroom. construct 1 new full bathroom & install (4) 18x36 skylight & upgrade ceiling joists. replace (e) sheet rock w/ new. all work on 2/f.Details
relocate kitchen, remodel bathroom. construct 1 new full bathroom & install (4) 18x36 skylight & upgrade ceiling joists. replace (e) sheet rock w/ new. all work on 2/f. | $60,000 |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 1390 Hampshire St | Hong's General Construction Inc | remodel existing kitchen on second floor and replace all sheetrock on second floor. use 5/8" type x along property line walls.Details
remodel existing kitchen on second floor and replace all sheetrock on second floor. use 5/8" type x along property line walls. | $25,000 |
| Feb 7, 2022 | Completed final sign-off Feb 2023 | 1254 36th Av | Hong's General Construction Inc | construct 2 bedroom, 1 full bathroom, media room, & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bathroom & replace (e) sheetrock w/ new at 2nd floor. remove/replace (e) interior staircase w/ new.Details
construct 2 bedroom, 1 full bathroom, media room, & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bathroom & replace (e) sheetrock w/ new at 2nd floor. remove/replace (e) interior staircase w/ new. | $154,000 |
| Nov 16, 2021 | Completed final sign-off Oct 2023 | 511 Lakeview Av | Hong's General Construction Inc | interior change of approaved plan pa 2016-1221-5539. the approved plans changed to 13" smaller. see drawingsDetails
interior change of approaved plan pa 2016-1221-5539. the approved plans changed to 13" smaller. see drawings | $6,000 |
| Nov 1, 2021 | Completed final sign-off Nov 2021 | 440 Silliman St | Hong's General Construction Inc | revision to pa# 202108045823. delete 11 front windows from scope of work under pa# 202108045823. replace 13 windows in the back of the house with vinyl double panel in kind. not face to street. u=.30maxDetails
revision to pa# 202108045823. delete 11 front windows from scope of work under pa# 202108045823. replace 13 windows in the back of the house with vinyl double panel in kind. not face to street. u=.30max | $5,000 |
| Aug 6, 2021 | Completed final sign-off Sep 2021 | 721 Amazon Av | Hong's General Construction Inc | remodel bathroom and kitchen upstair, no structural work, no plans, no location changes. comply cec 150.(k) and 150.0 (k)5Details
remodel bathroom and kitchen upstair, no structural work, no plans, no location changes. comply cec 150.(k) and 150.0 (k)5 | $35,000 |
| Aug 4, 2021 | Completed final sign-off Dec 2021 | 100 Foerster St | Hong's General Construction Inc | replace 5 windows in-kind @ front w/ wood flame & fiber, 3 in the middle fixed, 2 in the left and right casement. replace 5 windows in the left side. 3 windows in the back w/ vinyl. repair rear sifing 200 sf.Details
replace 5 windows in-kind @ front w/ wood flame & fiber, 3 in the middle fixed, 2 in the left and right casement. replace 5 windows in the left side. 3 windows in the back w/ vinyl. repair rear sifing 200 sf. | $15,000 |
| Aug 4, 2021 | Completed final sign-off Nov 2021 | 440 Silliman St | Hong's General Construction Inc | replace 11 windows in-kind @ front w/ wood frame & 2 vinyl window in the back in -kind. remodel (e) kitchen and (e) bathroom upstair. remodel 1 (e) bathroom in the basement. no structural work.Details
replace 11 windows in-kind @ front w/ wood frame & 2 vinyl window in the back in -kind. remodel (e) kitchen and (e) bathroom upstair. remodel 1 (e) bathroom in the basement. no structural work. | $38,000 |
| Aug 2, 2021 | Never finaled issued Aug 2021, no final | 8 Cuvier St | Hong's General Construction Inc | rev to pa201709199026: remove property line window in entertainment room on 1/f. reconfigure doors on 1/f.Details
rev to pa201709199026: remove property line window in entertainment room on 1/f. reconfigure doors on 1/f. | $4,000 |
| Jun 25, 2021 | Expired or cancelled expired Nov 2024 | 154 Gaven St | Hong's General Construction Inc | interior remodel: 1st fl adding new bathroom & relocate (e) bathroom; 2nd fl - remodel (e) kitchen and add new bathroom and remodel (e) bathroom.Details
interior remodel: 1st fl adding new bathroom & relocate (e) bathroom; 2nd fl - remodel (e) kitchen and add new bathroom and remodel (e) bathroom. | $46,000 |
| Jun 7, 2021 | Completed final sign-off Oct 2021 | 1371 44th Av | Hong's General Construction Inc | priovide/to install plywood around the interior house perimeter at 1st & 2nd fl. all drawings are reference from ap #202012070381.Details
priovide/to install plywood around the interior house perimeter at 1st & 2nd fl. all drawings are reference from ap #202012070381. | $100,000 |
| Apr 26, 2021 | Completed final sign-off Nov 2021 | 916 Vienna St | Hong's General Construction Inc | construct 2 bedrooms, 2 full bathroom, & family room at ground floor. remodel (e) kitchen, bathroom. construct (3) 1.5'x 3' skylight. replace (e) sheetrock with new at 2nd floor.Details
construct 2 bedrooms, 2 full bathroom, & family room at ground floor. remodel (e) kitchen, bathroom. construct (3) 1.5'x 3' skylight. replace (e) sheetrock with new at 2nd floor. | $120,000 |
| Mar 1, 2021 | Completed final sign-off Dec 2021 | 100 Foerster St | Hong's General Construction Inc | 1) construct two bed room, one full bath room, and family room at ground floor. 2)remodel extg kitchen, bath room, add one full bathroom and replace extg sheet rock with new at 2nd floor.Details
1) construct two bed room, one full bath room, and family room at ground floor. 2)remodel extg kitchen, bath room, add one full bathroom and replace extg sheet rock with new at 2nd floor. | $105,000 |
| Jan 19, 2021 | In progress issued Dec 2025 | 38 Chenery St | Hong's General Construction Inc | adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802.Details
adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802. | $138,000 |
| Dec 7, 2020 | Completed final sign-off Oct 2021 | 1371 44th Av | Hong's General Construction Inc | comply with nov 202064487. interior remodel: upgrade kitchen and bath at (e) location. replace the stairs from 2-f to (e) habitable attic. new interior stairs to 1-f. excavate garage for headroom and bathroom.Details
comply with nov 202064487. interior remodel: upgrade kitchen and bath at (e) location. replace the stairs from 2-f to (e) habitable attic. new interior stairs to 1-f. excavate garage for headroom and bathroom. | $100,000 |
| Nov 18, 2020 | Completed final sign-off Jul 2022 | 22 Bridgeview Dr | Hong's General Construction Inc | 1st floor:construct (n)bedroom,family,bathrm & (n)deck w/stairs to rear yard.2nd floor: construct(n)master bedrm suite,laundry w/ wet bar & cantilever deck.3rd floor:remodel kitchen, dining & living rm. construct (n)bathrm;remodel(e)bathrm.infill small lightwell.(n)kylight;window & garage doorDetails
1st floor:construct (n)bedroom,family,bathrm & (n)deck w/stairs to rear yard.2nd floor: construct(n)master bedrm suite,laundry w/ wet bar & cantilever deck.3rd floor:remodel kitchen, dining & living rm. construct (n)bathrm;remodel(e)bathrm.infill small lightwell.(n)kylight;window & garage door | $120,000 |
| Sep 23, 2020 | Completed final sign-off May 2023 | 38 Chenery St | Hong's General Construction Inc | for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately.Details
for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately. | $120,000 |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 361 Molimo Dr | Hong's General Construction Inc | interior remodel at 1st floor & 2nd floor. replace existing kitchen cabinets and countertop. replace existing bathrooms.Details
interior remodel at 1st floor & 2nd floor. replace existing kitchen cabinets and countertop. replace existing bathrooms. | $82,000 |
| Sep 10, 2020 | Completed final sign-off Jan 2021 | 574 38th Av | Hong's General Construction Inc | #2: remodel interior kitchen and bathroom. repair and replace in kind.Details
#2: remodel interior kitchen and bathroom. repair and replace in kind. | $35,000 |