Jian Huang
- Listed as
- architect, authorized agent-others, engineer
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2004 to Oct 2026
91 permits since 2000 (engineer on 83 permits, architect on 4 permits, authorized agent-others on 4 permits): 52 completed, 21 in progress, 12 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1340 Stockton St | F C Company | sidewalk repair over sub- sidewalk vault.Details
sidewalk repair over sub- sidewalk vault. | $25,000 |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 130 Caine Av | relocate/remodel (e) kitchen, bedroom & bathroom. add one bedroom & 1 full bathroom. rmeodel (e) front deck. add tankless water heater.Details
relocate/remodel (e) kitchen, bedroom & bathroom. add one bedroom & 1 full bathroom. rmeodel (e) front deck. add tankless water heater. | $100,000 | |
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 431 Munich St | comply with complaint case# 202306140 & nov# 202543103. to add 790 sq.ft. an attached state adu on ground floor unit.Details
comply with complaint case# 202306140 & nov# 202543103. to add 790 sq.ft. an attached state adu on ground floor unit. | $100,000 | |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 27 Ceres St | F C Company | comply with complaint #202547103. remove unpermitted horizontal addition, add back the original garage door, replace the front steel stair back to wooden stair, lower the steel fence to 6 feet.Details
comply with complaint #202547103. remove unpermitted horizontal addition, add back the original garage door, replace the front steel stair back to wooden stair, lower the steel fence to 6 feet. | $8,000 |
| May 21, 2026 | In progress issued Jun 2026 | 320 College Av | Gao Wu Construction Inc | excavate about 1 ft of soil 51.4 cubic yard of soil on the gr fl. add 2 bedroom, 2 full bath, 1 1/2 bath and new family room on gr fl. relocate and renew e furnance and water heater.Details
excavate about 1 ft of soil 51.4 cubic yard of soil on the gr fl. add 2 bedroom, 2 full bath, 1 1/2 bath and new family room on gr fl. relocate and renew e furnance and water heater. | $130,000 |
| May 12, 2026 | In progress issued May 2026 | 320 College Av | Gao Wu Construction Inc | 2nd floor: to remodel 2 full bath, to remodel (e) kitchen & merge living & kitchen space. relocate (e) stair to the ground floor.Details
2nd floor: to remodel 2 full bath, to remodel (e) kitchen & merge living & kitchen space. relocate (e) stair to the ground floor. | $100,000 |
| May 5, 2026 | In progress filed May 2026, not yet issued | 149 Goethe St | F C Company | add new retaining wall between 145 st & 149 goethe st. ref pa 202603167611 (145 goethe)Details
add new retaining wall between 145 st & 149 goethe st. ref pa 202603167611 (145 goethe) | $2,000 |
| Mar 16, 2026 | In progress filed Mar 2026, not yet issued | 145 Goethe St | F C Company | demo existing retaining wall & cmu fence, add a new permeable & grid apvers ramp for access from street, add new retaining wall between 145 & 149 goethe st.Details
demo existing retaining wall & cmu fence, add a new permeable & grid apvers ramp for access from street, add new retaining wall between 145 & 149 goethe st. | $4,000 |
| Mar 3, 2026 | Completed final sign-off May 2026 | 132 Hamerton Av | revision to pa #2026-0205-5301: remove (e) wall between the bedroom & sunroom. update structural detail for raised ceiling at bedroom #2Details
revision to pa #2026-0205-5301: remove (e) wall between the bedroom & sunroom. update structural detail for raised ceiling at bedroom #2 | $2,000 | |
| Feb 19, 2026 | In progress issued Apr 2026 | 1458 25th Av | Samco Construction Inc | infill lightwell on north suite; new fire cement siding over (e) wood siding @ side & rear. 1st fl - add 2 bedrms, 2 full bathrm, entertainment, a laundry & wetbar; upgrade electrical service to 125 amps; new garage door. 2nd fl - reconfigure interior layout for 2 bedrooms, 2 full bathrooms,Details
infill lightwell on north suite; new fire cement siding over (e) wood siding @ side & rear. 1st fl - add 2 bedrms, 2 full bathrm, entertainment, a laundry & wetbar; upgrade electrical service to 125 amps; new garage door. 2nd fl - reconfigure interior layout for 2 bedrooms, 2 full bathrooms, | $50,000 |
| Feb 15, 2026 | In progress filed Feb 2026, not yet issued | 579 05th Av | F C Company | comply w/nov 202538644 & 202542838, rebuild 3-flrs fire damaged bldg (unit 579 & 579a). unit 579: add new bathroom & family room @ 1/f, replace 2-fixture bath w/ 3-fixture @ 1/f, add wetbar @ 1/f, replace tub w/shower @ 2/f. unit 579a: ext kitchen/living/dining to bdrm #3, replace tub w/shower @ 3/fDetails
comply w/nov 202538644 & 202542838, rebuild 3-flrs fire damaged bldg (unit 579 & 579a). unit 579: add new bathroom & family room @ 1/f, replace 2-fixture bath w/ 3-fixture @ 1/f, add wetbar @ 1/f, replace tub w/shower @ 2/f. unit 579a: ext kitchen/living/dining to bdrm #3, replace tub w/shower @ 3/f | $168,000 |
| Jan 27, 2026 | In progress filed Jan 2026, not yet issued | 498 Hoffman Av | flatten (e) roof to bring upper level to livable ht standards and windows to code. additional outdoor deck space to be added with new roof.Details
flatten (e) roof to bring upper level to livable ht standards and windows to code. additional outdoor deck space to be added with new roof. | $32,000 | |
| Jan 20, 2026 | In progress issued Apr 2026 | 2639 Clement St | Liang General Construction Inc | unit #4: relocate (e) kitchen, living & bathroom. add one bedroom at unit 4 3rd flDetails
unit #4: relocate (e) kitchen, living & bathroom. add one bedroom at unit 4 3rd fl | $100,000 |
| Dec 12, 2025 | In progress issued May 2026 | 81 San Felipe Av | F C Company | construct a new deck with stairs in south side yard. not attaching to existing building.Details
construct a new deck with stairs in south side yard. not attaching to existing building. | $10,000 |
| Nov 18, 2025 | In progress issued Dec 2025 | 715 Prague St | Sky Town Construction | relocate and remodel e kitchen. relocate e bedroom # 1 and remodel e bath. add 1 full bath and 1 bedroom. to add a side deck to side yard from new living room. dry rot repair and reconfigure rear deck. seismic upgrade entire houseDetails
relocate and remodel e kitchen. relocate e bedroom # 1 and remodel e bath. add 1 full bath and 1 bedroom. to add a side deck to side yard from new living room. dry rot repair and reconfigure rear deck. seismic upgrade entire house | $90,000 |
| Nov 6, 2025 | Completed final sign-off May 2026 | 1636 Bacon St | Gao Wu Construction Inc | ground fl: to add 2 (n) bedroom & 1 (n) full bathrooms. to add 1 media room & kitchenette. replace & renew furnace & water heater. 2nd fl: remodel (e) kitchen & (e) bathroom. add one full bathroom.Details
ground fl: to add 2 (n) bedroom & 1 (n) full bathrooms. to add 1 media room & kitchenette. replace & renew furnace & water heater. 2nd fl: remodel (e) kitchen & (e) bathroom. add one full bathroom. | $80,000 |
| Oct 9, 2025 | Completed final sign-off Mar 2026 | 197 21st Av | repair front entrance interior stair support at the g/fDetails
repair front entrance interior stair support at the g/f | $8,000 | |
| Jul 31, 2025 | Completed final sign-off Jan 2026 | 1117 Cayuga Av | Gao Wu Construction Inc | to add 2 new bedrooms, 2 new full baths, 1 media room. replace and renew furnace and water heater at the ground floor. 2/f: to remodel (e) kitchen and remove (e) wall at kitchen area. to remodel (e) 2 bedrooms, add new full bath, to relocate (e) stair to the ground floor. to infill (e) lightwell.Details
to add 2 new bedrooms, 2 new full baths, 1 media room. replace and renew furnace and water heater at the ground floor. 2/f: to remodel (e) kitchen and remove (e) wall at kitchen area. to remodel (e) 2 bedrooms, add new full bath, to relocate (e) stair to the ground floor. to infill (e) lightwell. | $200,000 |
| Jul 23, 2025 | In progress issued Mar 2026 | 135 Melrose Av | Spectrum Development Co. | b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bathDetails
b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bath | $250,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2026 | 421 Princeton St | Wei Dang Builders Inc. | ground fl: convert (e) family room to a new office and bedroom. 2nd fl: remodel (e) kitchen, convert (e) half bath to a full bath. voluntary structural strengtheningDetails
ground fl: convert (e) family room to a new office and bedroom. 2nd fl: remodel (e) kitchen, convert (e) half bath to a full bath. voluntary structural strengthening | $80,000 |
| Jun 24, 2025 | Completed final sign-off Feb 2026 | 144 Locksley Av | Building Construction Express, Builderduty Inc | 2nd fl - to relocate (e) kitchen to living room; demo (e) fireplace; add half bathroom; add 1 officeDetails
2nd fl - to relocate (e) kitchen to living room; demo (e) fireplace; add half bathroom; add 1 office | $40,000 |
| Jun 6, 2025 | Completed final sign-off Mar 2026 | 197 21st Av | George Wu Construction Inc | 2nd fl. (unit 199) & 3rd fl (unit 197) relocate and remodel (e) kitchen and 1 bathroom remodel in both units, add one bedroom and one bathroom in both units, add recessed lighting around entire units (both), relocate washer and dryer in both units.Details
2nd fl. (unit 199) & 3rd fl (unit 197) relocate and remodel (e) kitchen and 1 bathroom remodel in both units, add one bedroom and one bathroom in both units, add recessed lighting around entire units (both), relocate washer and dryer in both units. | $150,000 |
| Feb 21, 2025 | In progress issued Mar 2025 | 81 San Felipe Av | F C Company | revision to pa 202210144440- remove fireplace in 2 floors. add walls around elevator shaft in 4 floors. change size of 11 windows. infill 7 windows. change 1 sliding door to 1 window. correction of (e) basement fl plan. add a wall with doors to separate yoga room & media room. add ventilationDetails
revision to pa 202210144440- remove fireplace in 2 floors. add walls around elevator shaft in 4 floors. change size of 11 windows. infill 7 windows. change 1 sliding door to 1 window. correction of (e) basement fl plan. add a wall with doors to separate yoga room & media room. add ventilation | $30,000 |
| Jan 31, 2025 | In progress issued Jun 2025 | 25 Moulton St | Tritone Construction | 2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplaceDetails
2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplace | $70,000 |
| Jan 16, 2025 | Expired or cancelled expired Mar 2026 | 749 Portola Dr | F C Company | to comply with nov# 22432152: car drove into building repair the damage in-kind repair/replace front exterior wall, store front planter, patch broken meter pipe under bar counters, install power assisted door operatorDetails
to comply with nov# 22432152: car drove into building repair the damage in-kind repair/replace front exterior wall, store front planter, patch broken meter pipe under bar counters, install power assisted door operator | $35,000 |
| Sep 27, 2024 | Completed final sign-off Mar 2025 | 123 Melrose Av | Spectrum Development Co. | basement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yardDetails
basement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yard | $30,000 |
| Aug 29, 2024 | Completed final sign-off Aug 2025 | 806 Russia Av | Arreglo Construction Inc, A B F Construction | to comply with nov 202421515 demo all unpermitted works including bathroom in garage, expansion on ground floor 1st fl rearDetails
to comply with nov 202421515 demo all unpermitted works including bathroom in garage, expansion on ground floor 1st fl rear | $50,000 |
| Aug 12, 2024 | Completed final sign-off Mar 2025 | 1354 Castro St | Rockaway Construction Inc. | install new lighting fixtures. change occupance from office to retail. ada compliance as follows: install lower door actuator controll at exterior of entry door, raise interior actuator controll to compliant height, privide ada signage at proper location at restroom, remove pictograms from restroomDetails
install new lighting fixtures. change occupance from office to retail. ada compliance as follows: install lower door actuator controll at exterior of entry door, raise interior actuator controll to compliant height, privide ada signage at proper location at restroom, remove pictograms from restroom | $50,000 |
| Jul 25, 2024 | In progress filed Jul 2024, not yet issued | 190 Collins St | add 5th unit on (e) ground floor. add new furnace & water heater for the new unit.Details
add 5th unit on (e) ground floor. add new furnace & water heater for the new unit. | $100,000 | |
| Jul 10, 2024 | In progress issued Aug 2025 | 38 Seneca Av | Construction Guys Inc | to comply with nov# 202306140 (work w/o permit on the ground floor). add 749 sqft attached adu (state adu) on ground floor. (see planning's note on square footage)Details
to comply with nov# 202306140 (work w/o permit on the ground floor). add 749 sqft attached adu (state adu) on ground floor. (see planning's note on square footage) | $100,000 |
| Jul 5, 2024 | Completed final sign-off Nov 2025 | 131 Beverly St | Albert Constuction | revision to 202402156009 2/f: all windows replacement (street facing windows included). (e) bathroom and kitchen remodel, relocate (e) stair and remove stair to the ground floor, remove fireplace. ground floor: add 2 bedrooms, 2 full bathrooms, relocate and renew washer/dryer, furnace, water heater.Details
revision to 202402156009 2/f: all windows replacement (street facing windows included). (e) bathroom and kitchen remodel, relocate (e) stair and remove stair to the ground floor, remove fireplace. ground floor: add 2 bedrooms, 2 full bathrooms, relocate and renew washer/dryer, furnace, water heater. | $150,000 |
| May 23, 2024 | Completed final sign-off Mar 2025 | 123 Melrose Av | Spectrum Development Co. | basement: add a half bath & family room. ground fl: add (n) bedroom, full bath, laundry area & nook room. relocate and replace water heater & furnace. replace street facing window with (n) door. 2nd fl: kitchen & bathroom remodel. remove (e) fireplaceDetails
basement: add a half bath & family room. ground fl: add (n) bedroom, full bath, laundry area & nook room. relocate and replace water heater & furnace. replace street facing window with (n) door. 2nd fl: kitchen & bathroom remodel. remove (e) fireplace | $180,000 |
| Apr 17, 2024 | Completed final sign-off May 2025 | 78 Niagara Av | Best Level Construction Inc | 2nd fl: remodel (e) kitchen & bathroom & add (1) new bedroom & bathroom. remove (e) stair to the ground floor. replace (e) street facing windows inkind. ground fl: add (n) family room, one full bath & bedroom. relocate (e) water heater & furnace. add kitcheneteDetails
2nd fl: remodel (e) kitchen & bathroom & add (1) new bedroom & bathroom. remove (e) stair to the ground floor. replace (e) street facing windows inkind. ground fl: add (n) family room, one full bath & bedroom. relocate (e) water heater & furnace. add kitchenete | $120,000 |
| Nov 9, 2023 | Expired or cancelled expired Feb 2026 | 874 40th Av | Liang General Construction Inc | revision to permit 202303153739. g/f: add a wetbar, relocate walkin closet, change window and door locations. 2/f: revised kitchen area layout. relocate half bath and bathroom layout revision. replace three windows at light well on north elevation 2nd floor like for like.Details
revision to permit 202303153739. g/f: add a wetbar, relocate walkin closet, change window and door locations. 2/f: revised kitchen area layout. relocate half bath and bathroom layout revision. replace three windows at light well on north elevation 2nd floor like for like. | $5,000 |
| Nov 2, 2023 | Completed final sign-off Nov 2024 | 675 Broadway | G Legarte Construction | to add wall panel at the stairway & hallway @ 2/f. no work on other floors.Details
to add wall panel at the stairway & hallway @ 2/f. no work on other floors. | $3,000 |
| Oct 20, 2023 | In progress filed Oct 2023, not yet issued | 1490 Ocean Av | revison to bpa#201711023021 to change (e) mini split system to a water fan coil heating systemDetails
revison to bpa#201711023021 to change (e) mini split system to a water fan coil heating system | ||
| Oct 20, 2023 | In progress issued Sep 2024 | 4355 Anza St | abe#202303246357, to comply with accessible business entrance program/ordinance 51-16, to create an adda entrance for retailDetails
abe#202303246357, to comply with accessible business entrance program/ordinance 51-16, to create an adda entrance for retail | $4,000 | |
| Oct 6, 2023 | Completed final sign-off Jan 2025 | 1659 33rd Av | Mr Wu Construction | ground floor: to add (1) bedroom, (1) full bath, and (1) media room. renew (e) water heater. relocate washer and dryer. recessed (e) structural footing for posts.Details
ground floor: to add (1) bedroom, (1) full bath, and (1) media room. renew (e) water heater. relocate washer and dryer. recessed (e) structural footing for posts. | $80,000 |
| Sep 25, 2023 | Never finaled filed Sep 2023, never issued | 2614 23rd Av | replace (e) stair dryrot for framing & foundation; replace (e) terrazo stair finish only with bull nosed brick finishDetails
replace (e) stair dryrot for framing & foundation; replace (e) terrazo stair finish only with bull nosed brick finish | $30,000 | |
| Sep 1, 2023 | Completed final sign-off Jul 2024 | 272 Arlington St | F C Company | reduce existing mezzanine area in existing garage for larger parking, lower existing mezzanine level to creat a workshop, lower side yard grade for new mezzanine access.Details
reduce existing mezzanine area in existing garage for larger parking, lower existing mezzanine level to creat a workshop, lower side yard grade for new mezzanine access. | $70,000 |
| Jul 28, 2023 | Never finaled issued Aug 2023, no final | 357 Union St | Kaifa Construction Inc | revision to pa# 202010196891, revise dormer & 3/f layout per plan. see clounded on west elevation near rear combine two windows into one window.Details
revision to pa# 202010196891, revise dormer & 3/f layout per plan. see clounded on west elevation near rear combine two windows into one window. | $10,000 |
| May 30, 2023 | Never finaled issued Aug 2023, no final | 294 Hale St | F C Company | 1/f: add a bedroom & bathroom. add interior stairwell connecting to 2/f. 2/f: (e) bath resurface including relocate one window. remove walls per plan and remodel living room. switch (e) kitchen with dining room.Details
1/f: add a bedroom & bathroom. add interior stairwell connecting to 2/f. 2/f: (e) bath resurface including relocate one window. remove walls per plan and remodel living room. switch (e) kitchen with dining room. | $80,000 |
| Mar 1, 2023 | Completed final sign-off Sep 2023 | 266 Edinburgh St | infill e lightwell at 2nd fl total 22 sq ft. change the bathroom layoutDetails
infill e lightwell at 2nd fl total 22 sq ft. change the bathroom layout | $5,000 | |
| Oct 25, 2022 | Completed final sign-off Mar 2024 | 923 Scott St | John O'rourke | units 923, 925 & 927: kitchen/full bath/1/2 bath remodel, replace (e) water heaters with tankless water heatersDetails
units 923, 925 & 927: kitchen/full bath/1/2 bath remodel, replace (e) water heaters with tankless water heaters | $60,000 |
| Oct 14, 2022 | Never finaled issued Aug 2023, no final | 81 San Felipe Av | F C Company | 2/f: relocate (e) bathroom & new walkin closet.1/f: relocate & remodel (e) kitchen, bath, bed & dining rooms.reconfig (e) laundry & powder room. basement fl: (n) master bed/bath,reconfig (e) master bed/bath. new powder rm,office, remodel (e) family room, sub-basement floor: convert storage to mediaDetails
2/f: relocate (e) bathroom & new walkin closet.1/f: relocate & remodel (e) kitchen, bath, bed & dining rooms.reconfig (e) laundry & powder room. basement fl: (n) master bed/bath,reconfig (e) master bed/bath. new powder rm,office, remodel (e) family room, sub-basement floor: convert storage to media | $165,000 |
| Aug 9, 2022 | Completed final sign-off Jan 2024 | 2363 42nd Av | C & C General Engineering Inc. | 1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater.Details
1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater. | $100,000 |
| Jun 9, 2022 | Completed final sign-off Apr 2025 | 2424 Polk St | Pacific Edge Construction Inc | revision to bpa#2021-0903-7791. to add an ada ramp to the retail store and ada power door with ada door opener actuators.Details
revision to bpa#2021-0903-7791. to add an ada ramp to the retail store and ada power door with ada door opener actuators. | $6,000 |
| Mar 22, 2022 | Completed final sign-off Apr 2024 | 1761 Leavenworth St | H & Z Construction Inc | 1/f: new bathroom, laundry room and family room. 2/f: relocate (e) kitchen, office and powder room reconfigure interior staircase. 3/f: new bathroom , reconfigure (e) bedrooms, and remodel master bathroom.Details
1/f: new bathroom, laundry room and family room. 2/f: relocate (e) kitchen, office and powder room reconfigure interior staircase. 3/f: new bathroom , reconfigure (e) bedrooms, and remodel master bathroom. | $70,000 |
| Mar 15, 2022 | Completed final sign-off Dec 2022 | 3224 Wawona St | revision to pa# 202010076121 & 202010076119. replace spiral stairs to l-shaped stairs in unit "b". replace spiral stairs in rear yard.Details
revision to pa# 202010076121 & 202010076119. replace spiral stairs to l-shaped stairs in unit "b". replace spiral stairs in rear yard. | ||
| Jan 28, 2022 | Completed final sign-off Feb 2023 | 544 Clement St | to complly with complaint 202185571 to legalize installed vent-less air fryer in the store of mr & mrs tea houseDetails
to complly with complaint 202185571 to legalize installed vent-less air fryer in the store of mr & mrs tea house | $200 | |
| Jan 13, 2022 | Completed final sign-off Dec 2022 | 65 Delano Av | D Construction Inc | 1/f: replace (e) foundation, new bathroom, relocate washer/dryer, water heater/furnace. replace garage door at rear side of building. 2/f: new deck and stairway to rear yard. new bathroom at kitchen, reconfigure (e) bathroom as per plan.Details
1/f: replace (e) foundation, new bathroom, relocate washer/dryer, water heater/furnace. replace garage door at rear side of building. 2/f: new deck and stairway to rear yard. new bathroom at kitchen, reconfigure (e) bathroom as per plan. | $46,000 |
| Dec 24, 2021 | Never finaled filed Dec 2021, never issued | 576 Spruce St | revision to bpa #201806010818.change to windows,rear deck & interior layout.Details
revision to bpa #201806010818.change to windows,rear deck & interior layout. | ||
| Dec 6, 2021 | Completed final sign-off Apr 2024 | 132 Sagamore St | Ecowave Inc | 1st flr: replace (e) foundation. 2nd flr: relocate (e) kitchen and bath. add (n) bedrooms, powder room and laundry rm. 3rd flr: reconfigure (e) bathroom and add new bathrooms.Details
1st flr: replace (e) foundation. 2nd flr: relocate (e) kitchen and bath. add (n) bedrooms, powder room and laundry rm. 3rd flr: reconfigure (e) bathroom and add new bathrooms. | $100,000 |
| Jun 10, 2021 | Expired or cancelled expired Dec 2024 | 3223 Gough St | Macrobuild Corporation | 2/f: remodel 1 bathroom, 1 powder room, merge the (e) dining room with sun room. 3/f: reomodel 1 bathroom & 1 bedroomDetails
2/f: remodel 1 bathroom, 1 powder room, merge the (e) dining room with sun room. 3/f: reomodel 1 bathroom & 1 bedroom | $38,000 |
| Oct 7, 2020 | Completed final sign-off Dec 2022 | 3224 Wawona St | New Land Construction Co | add one dwelling unit per ord# 162-16. horizontal addition at rear property under pa#202010076121Details
add one dwelling unit per ord# 162-16. horizontal addition at rear property under pa#202010076121 | |
| Oct 7, 2020 | Completed final sign-off Dec 2022 | 3224 Wawona St | New Land Construction Co | horizontal addition at rear property, ground floor approx 15'x23' (610 sf new living space) and 2nd floor approx 15'x23' (315 sf new living space)add stair way in the 2nd floor to rear yard. add adu under separate pa# 202010076119.Details
horizontal addition at rear property, ground floor approx 15'x23' (610 sf new living space) and 2nd floor approx 15'x23' (315 sf new living space)add stair way in the 2nd floor to rear yard. add adu under separate pa# 202010076119. | $150,000 |
| Jul 21, 2020 | Completed final sign-off Nov 2021 | 26 Cross St | Kaifa Construction Inc | foundation work only, foundation strengtheningDetails
foundation work only, foundation strengthening | $20,000 |
| Feb 24, 2020 | Completed final sign-off Feb 2022 | 24 Cross St | Kaifa Construction Inc | adu under ordinance 162-16. add dwelling unit (665 sqft) to (e) bldg on 1st fl. (n) unit includes (1) bedroom, (1) bathroom, (1) half bath, (1) office, kitchen, living & dining roomDetails
adu under ordinance 162-16. add dwelling unit (665 sqft) to (e) bldg on 1st fl. (n) unit includes (1) bedroom, (1) bathroom, (1) half bath, (1) office, kitchen, living & dining room | $58,000 |
| Jan 10, 2020 | Completed final sign-off Mar 2021 | 3436 Clay St | Macrobuild Corporation | to remodel (e) kitchen and bathroom, add washer/dryer (direct vent), remove non-structural wall to extend closet and bedroomsDetails
to remodel (e) kitchen and bathroom, add washer/dryer (direct vent), remove non-structural wall to extend closet and bedrooms | $2,000 |
| Dec 30, 2019 | Completed final sign-off Jan 2022 | 1829 Fulton St | Wk Construction Inc | kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath)Details
kitchen and bathroom remodel on 2nd floor. add interior stair for connecting ground floor to 2nd floor. rooms down (one full bath) | $43,000 |
| Dec 13, 2019 | Completed final sign-off Dec 2021 | 26 Cross St | Kaifa Construction Inc | remodel (e) bedroom & bathroom, add 2 bedrooms and one study & 2 bathrooms on 2nd flDetails
remodel (e) bedroom & bathroom, add 2 bedrooms and one study & 2 bathrooms on 2nd fl | $46,000 |
| Dec 13, 2019 | Never finaled issued Apr 2022, no final | 5088 Mission St | A-1 Dynamic Builders Inc., Jian's Builder Corp | to comply w/ complaint 201982245 & 201972951. change of occupancy from commercial to residential units(two new residential units at 2nd story).**maher n/a**Details
to comply w/ complaint 201982245 & 201972951. change of occupancy from commercial to residential units(two new residential units at 2nd story).**maher n/a** | $150,000 |
| Nov 8, 2019 | Completed final sign-off Mar 2021 | 2215 Webster St | Sincere Construction Company Inc | revision to soft story permit #201711143998. to comply with nov #201714832.soft story rerofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. rpelace moment frame to strong wall at grid 1.Details
revision to soft story permit #201711143998. to comply with nov #201714832.soft story rerofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. rpelace moment frame to strong wall at grid 1. | |
| Sep 24, 2019 | Completed final sign-off Sep 2020 | 116 Escolta Wy | Creative Designs Construction | 1st floor - new bedroom, bathroom, laundry room, entertainment and family room. 2nd fl - relocate (e) kitchen, enclose lightwell, remodel (e) bathroom, add master bathroom.Details
1st floor - new bedroom, bathroom, laundry room, entertainment and family room. 2nd fl - relocate (e) kitchen, enclose lightwell, remodel (e) bathroom, add master bathroom. | $46,000 |
| May 15, 2019 | Never finaled filed May 2019, never issued | 329 Silver Av | to convert to child care facility. horizontal addition at front property ground flr. approx 49' x 15' on 1st flr and approx 28' x 15' on 2nd fl. relocate garage to the front of property. add roof deck on 2nd flr.Details
to convert to child care facility. horizontal addition at front property ground flr. approx 49' x 15' on 1st flr and approx 28' x 15' on 2nd fl. relocate garage to the front of property. add roof deck on 2nd flr. | $60,000 | |
| Mar 13, 2019 | Completed final sign-off Apr 2022 | 2246 Vicente St | Liang General Construction Inc | change of use and occupancy to convert existing ground floor retail space to a single residential dwelling unit: 3 bedroom, 1 kitchen, living space and 2 full bath. add nfpa 13r sprinkler systemDetails
change of use and occupancy to convert existing ground floor retail space to a single residential dwelling unit: 3 bedroom, 1 kitchen, living space and 2 full bath. add nfpa 13r sprinkler system | $50,000 |
| Feb 20, 2019 | Expired or cancelled withdrawn May 2024 | 95 Orange Al | add one bathroom, reduce the deck area by 3 feet.Details
add one bathroom, reduce the deck area by 3 feet. | $25,000 | |
| Dec 12, 2018 | Completed final sign-off Mar 2019 | 734 20th Av | O'pro Construction Inc. | voluntary seismic retrofittingDetails
voluntary seismic retrofitting | $60,000 |
| Oct 12, 2018 | Never finaled issued Dec 2018, no final | 576 Spruce St | Kong Lai Construction | revision to app#2011806010818. reconfigure bathrooms on 1st floor. add 2 storages. relocate stairway at 1st floor. 2nd floor: reconfigure kitchen. bathrooms layout. relocate closet and stairway. add deck at rear side of bldg.Details
revision to app#2011806010818. reconfigure bathrooms on 1st floor. add 2 storages. relocate stairway at 1st floor. 2nd floor: reconfigure kitchen. bathrooms layout. relocate closet and stairway. add deck at rear side of bldg. | $40,000 |
| Oct 9, 2018 | Completed final sign-off Aug 2019 | 920 Cayuga Av | Room By Room Maintenance Inc | to repair extg foundation at the garage about 23 feet.Details
to repair extg foundation at the garage about 23 feet. | $5,000 |
| Oct 2, 2018 | Completed final sign-off Nov 2018 | 470 25th Av | D & S Leong Associates | rev to pa201312184545: unit 2: restore floor plan back to original confguration. modify (e) floor plan on 2/f unit 2: add new bedroom and remove all between family room and kitchen.Details
rev to pa201312184545: unit 2: restore floor plan back to original confguration. modify (e) floor plan on 2/f unit 2: add new bedroom and remove all between family room and kitchen. | |
| Sep 12, 2018 | Never finaled issued Jan 2019, no final | 958 Geneva Av | Kevin Lin Construction Inc | convert (e) fish & meat market to restaurant type-1 hood intake air unit. hood exhaust fan under separate permit. fire alarm under separate permit.Details
convert (e) fish & meat market to restaurant type-1 hood intake air unit. hood exhaust fan under separate permit. fire alarm under separate permit. | $10,000 |
| Sep 12, 2018 | Completed final sign-off Jan 2020 | 1658 Union St | U T E C Construction Company Inc | mandatory soft story retrofit per sf ord per sfebc ch.4d ( commercial)Details
mandatory soft story retrofit per sf ord per sfebc ch.4d ( commercial) | $10,000 |
| Sep 12, 2018 | Completed final sign-off Jan 2020 | 1658 Union St | U T E C Construction Company Inc | soft story retrofit per sfbc chapter 34 b in accordancewith 2016 iebc appendix a-4 (residential)Details
soft story retrofit per sfbc chapter 34 b in accordancewith 2016 iebc appendix a-4 (residential) | $50,000 |
| Aug 20, 2018 | Completed final sign-off Jan 2021 | 958 Geneva Av | Kevin Lin Construction Inc | remodel (e) fish & meat market, relocate 2 ada restrooms, type-1 hood, intake air unit & hood exhaust fan under seperate permitDetails
remodel (e) fish & meat market, relocate 2 ada restrooms, type-1 hood, intake air unit & hood exhaust fan under seperate permit | $90,000 |
| Aug 13, 2018 | Completed final sign-off Dec 2018 | 2980 22nd Av | the project includes demo of kitchen and stairs to rear yard. new kitchen cabinets, fixtures, and appliances. infilled floor and wall at existing stair location. kitchen windows replacement in kind.Details
the project includes demo of kitchen and stairs to rear yard. new kitchen cabinets, fixtures, and appliances. infilled floor and wall at existing stair location. kitchen windows replacement in kind. | $70,000 | |
| Jul 26, 2018 | Never finaled issued Mar 2019, no final | 576 Spruce St | to construct concrete retaining wall at rear yard.Details
to construct concrete retaining wall at rear yard. | $30,000 | |
| Jun 28, 2018 | Never finaled issued Nov 2019, no final | 2888 Harrison St | Excel One Construction Inc. | add units per ordinance nos. 162-16, add an accessory dwelling unit.Details
add units per ordinance nos. 162-16, add an accessory dwelling unit. | $150,000 |
| Jun 26, 2018 | Completed final sign-off Sep 2018 | 1326 Utah St | Westgate Renovators Inc | omit new header beamn at garage door. add top plate connection detail. ref bpa#201805159204Details
omit new header beamn at garage door. add top plate connection detail. ref bpa#201805159204 | |
| Jun 19, 2018 | Completed final sign-off Mar 2019 | 2542 42nd Av | D Construction Inc | revision to 201801057983 to add scope: add deck at rearDetails
revision to 201801057983 to add scope: add deck at rear | $5,000 |
| Jun 14, 2018 | Completed final sign-off Feb 2019 | 1435 Van Dyke Av | L & D Devlopment.Inc. | rebuild fire damaged roof. replace damaged structural beams & posts, upgrade (e) to bathroom to ada compliant.Details
rebuild fire damaged roof. replace damaged structural beams & posts, upgrade (e) to bathroom to ada compliant. | $80,000 |
| Jun 1, 2018 | Never finaled issued Jun 2018, no final | 576 Spruce St | Kong Lai Construction | 1) remodel extg ground floor and 2nd floor. 2) add 169 sq ft living space on 1st floor. 3)upgrade electrical service from 100 amp to 200 amp.Details
1) remodel extg ground floor and 2nd floor. 2) add 169 sq ft living space on 1st floor. 3)upgrade electrical service from 100 amp to 200 amp. | $12,000 |
| May 24, 2018 | Completed final sign-off Jun 2019 | 625 Kearny St | C & C General Engineering Inc. | change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a **Details
change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a ** | $10,000 |
| Mar 30, 2018 | Completed final sign-off Mar 2020 | 341 San Fernando Wy | Yong And Zhuo Construction Inc | add two bedrooms, two bathrooms, family room and laundry @ first floor. reinforce foundationDetails
add two bedrooms, two bathrooms, family room and laundry @ first floor. reinforce foundation | $50,000 |
| Feb 20, 2018 | Completed final sign-off Jan 2021 | 1565 16th Av | alteration to (e)sfbuilding. create(n)habitable space approx.1000 sqft at 1st&basement flrs.relocate & remodel(e)kitchen & bathroom @ 2nd flr. enclose (e)outside terrace @2nd flr. add (n)decks @ 1st&2nd flrs. enclose two lightwells on 2nd floor. enclose space @ 1st& basement under(e)bay @2nd flrDetails
alteration to (e)sfbuilding. create(n)habitable space approx.1000 sqft at 1st&basement flrs.relocate & remodel(e)kitchen & bathroom @ 2nd flr. enclose (e)outside terrace @2nd flr. add (n)decks @ 1st&2nd flrs. enclose two lightwells on 2nd floor. enclose space @ 1st& basement under(e)bay @2nd flr | $200,000 | |
| Oct 30, 2017 | Completed final sign-off Jan 2018 | 701 12th Av | 21st Century Home Improvt | infill lightwell on 2nd floor at side side of building. new roof enclosure approx 37 sq ft.Details
infill lightwell on 2nd floor at side side of building. new roof enclosure approx 37 sq ft. | $3,000 |
| Jun 20, 2017 | Completed final sign-off Dec 2017 | 654 South Van Ness Av | I Z M C Construction Inc | soft story retrofit per sfbc chapter 34b in accordance with 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b in accordance with 2012 iebc appendix a-4 | $30,000 |
| Mar 17, 2014 | Expired or cancelled cancelled Feb 2024 | 1029 Jackson St | vertical addition. add new floor. 4 bedrooms, 2 bathrooms, 1 study room & 1 stair.Details
vertical addition. add new floor. 4 bedrooms, 2 bathrooms, 1 study room & 1 stair. | $120,000 | |
| Mar 17, 2014 | Expired or cancelled cancelled Aug 2017 | 1326 Larkin St | vertical addition. add new floor. 3 bathroom, 4 bedrooms, 2 deck & 1 stair.Details
vertical addition. add new floor. 3 bathroom, 4 bedrooms, 2 deck & 1 stair. | $120,000 | |
| Sep 19, 2013 | Completed final sign-off Dec 2013 | 795 Victoria St | I Z M C Construction Inc | revision to pa# 201307010845. ; change location of a new window and add one new window. change location of washer and dryer. upgrade furnace. add/move some walls and relocate rooms at 1/f inside the bldg. front & two south windows replace in-kind (wood).Details
revision to pa# 201307010845. ; change location of a new window and add one new window. change location of washer and dryer. upgrade furnace. add/move some walls and relocate rooms at 1/f inside the bldg. front & two south windows replace in-kind (wood). | |
| Jan 23, 2004 | Completed final sign-off Dec 2005 | 130 Circular Av | horizontal rear addition & remodelingDetails
horizontal rear addition & remodeling | $80,000 |