Mr Wu Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Feb 2025
- Last 24 months
- 3 permits filed
19 permits since 2000: 17 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2025 | In progress issued Apr 2025 | 741 University St | ground flr: add 2 bedrooms and 3 full bath. add (1) family room. 2/f: remodel (e) kitchen. remove (e) wall at kitchen area. remodel 2 bedroom and relocate 1 bed. remodel and relocate 2 full bath. add (1) full bath. remove (e) stair to g/f. add stair from 2/f to rear yard. add skylight andDetails
ground flr: add 2 bedrooms and 3 full bath. add (1) family room. 2/f: remodel (e) kitchen. remove (e) wall at kitchen area. remodel 2 bedroom and relocate 1 bed. remodel and relocate 2 full bath. add (1) full bath. remove (e) stair to g/f. add stair from 2/f to rear yard. add skylight and | $200,000 |
| Feb 6, 2025 | Completed final sign-off Jun 2025 | 237 Woolsey St | revision to pa#202411195329 2nd floor: to enclose the dining area. ground floor: relocate proposed kitchenette, and replace 3 windows in bathroom and facing the rear yard. (in-kind)Details
revision to pa#202411195329 2nd floor: to enclose the dining area. ground floor: relocate proposed kitchenette, and replace 3 windows in bathroom and facing the rear yard. (in-kind) | |
| Nov 19, 2024 | Completed final sign-off Jun 2025 | 237 Woolsey St | 2/f: to remodel 1 full bath and add 1 full bathroom. g/f: to add 2 bedrooms, 1 full bath, and a room with kitchenette (2-burner stove)Details
2/f: to remodel 1 full bath and add 1 full bathroom. g/f: to add 2 bedrooms, 1 full bath, and a room with kitchenette (2-burner stove) | $120,000 |
| May 13, 2024 | Completed final sign-off Aug 2024 | 1777 Geneva Av | remodel second floor bathroom. all fixture are at the same location.Details
remodel second floor bathroom. all fixture are at the same location. | $10,000 |
| May 13, 2024 | Completed final sign-off Oct 2024 | 1370 17th Av | add a laundry in to the shower, replace tub for shower, vanity and toilet will be at the same location.Details
add a laundry in to the shower, replace tub for shower, vanity and toilet will be at the same location. | $12,000 |
| Mar 5, 2024 | Completed final sign-off Aug 2024 | 1777 Geneva Av | add a family rm with wer bar, a bedroom & a full bathroom on 1st/f (total 304 sf). new furnace & tankless water heater.Details
add a family rm with wer bar, a bedroom & a full bathroom on 1st/f (total 304 sf). new furnace & tankless water heater. | $50,000 |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 168 Westwood Dr | cosmetics remodel master bathroom on 2/fl. like to like remodel with new tub. new shower fixtures. new toilet and vanity. no change in plumbing fixtures location.Details
cosmetics remodel master bathroom on 2/fl. like to like remodel with new tub. new shower fixtures. new toilet and vanity. no change in plumbing fixtures location. | $5,000 |
| Nov 3, 2023 | Completed final sign-off Oct 2024 | 1531 10th Av | 2/f & 3/f: remodel kitchen & bathroom, new bathroom and in unit laundry for both 1531 & 1533 10th av. replace sheetrock in entire unit for both floors with type-x. replace all windows at rear and lightwell in kind.Details
2/f & 3/f: remodel kitchen & bathroom, new bathroom and in unit laundry for both 1531 & 1533 10th av. replace sheetrock in entire unit for both floors with type-x. replace all windows at rear and lightwell in kind. | $150,000 |
| Oct 6, 2023 | Completed final sign-off Jan 2025 | 1659 33rd Av | ground floor: to add (1) bedroom, (1) full bath, and (1) media room. renew (e) water heater. relocate washer and dryer. recessed (e) structural footing for posts.Details
ground floor: to add (1) bedroom, (1) full bath, and (1) media room. renew (e) water heater. relocate washer and dryer. recessed (e) structural footing for posts. | $80,000 |
| Oct 2, 2023 | Completed final sign-off Jul 2024 | 226 Arleta Av | g/f: add (2) bedrooms, (1) full bath, (1) half bath, and media room (add 389sf habitable space). relocate washer/dryer and furnance. no exterior work.Details
g/f: add (2) bedrooms, (1) full bath, (1) half bath, and media room (add 389sf habitable space). relocate washer/dryer and furnance. no exterior work. | $80,000 |
| Jun 27, 2023 | Completed final sign-off Oct 2023 | 1659 33rd Av | kitchen and full bath remodel at 2nd fl only. remodel 1 non structural wall next to kitchenDetails
kitchen and full bath remodel at 2nd fl only. remodel 1 non structural wall next to kitchen | $30,000 |
| Mar 2, 2023 | Completed final sign-off May 2023 | 835 Amazon Av | revision to bpa 2022-0914-2455 1st fl - new sliding door @ rear & relocated laundry; 2nd fl - convert dining room to bedroomDetails
revision to bpa 2022-0914-2455 1st fl - new sliding door @ rear & relocated laundry; 2nd fl - convert dining room to bedroom | $2,500 |
| Jan 17, 2023 | Completed final sign-off Jul 2023 | 415 40th Av | revision to bpa#202210285471, change kitchen & bathroom 2/f layout, removed fire place, relocated skylight, removed office, replace window w/new door, enlarge storage closet, replace water heater w/tankless typeDetails
revision to bpa#202210285471, change kitchen & bathroom 2/f layout, removed fire place, relocated skylight, removed office, replace window w/new door, enlarge storage closet, replace water heater w/tankless type | $1,000 |
| Oct 28, 2022 | Completed final sign-off Jul 2023 | 415 40th Av | remodel kitchen and bathroom, add a full bathroom on the 2/f. add 2 bedrooms and office, 2 full baths on 1/f. infill 1/f space under the 2/f beroom. replace wall heater and furnace. remove light stairs.Details
remodel kitchen and bathroom, add a full bathroom on the 2/f. add 2 bedrooms and office, 2 full baths on 1/f. infill 1/f space under the 2/f beroom. replace wall heater and furnace. remove light stairs. | $130,000 |
| Sep 14, 2022 | Completed final sign-off May 2023 | 835 Amazon Av | 1/f: add entertainment room and half bath. 2/f: remodel 1 bath and add 1 bathrooms and 1 wet bar on first floorDetails
1/f: add entertainment room and half bath. 2/f: remodel 1 bath and add 1 bathrooms and 1 wet bar on first floor | $40,000 |
| Jul 19, 2021 | Completed final sign-off Mar 2022 | 267 Holyoke St | 1st fl - remodel garage to (1) bedroom, (2) bath & (1) media roomDetails
1st fl - remodel garage to (1) bedroom, (2) bath & (1) media room | $50,000 |
| Oct 28, 2019 | Completed final sign-off Dec 2020 | 2301 Kirkham St | remodel bath at 3rd floor. no structural work - no framing modification.Details
remodel bath at 3rd floor. no structural work - no framing modification. | $10,000 |
| Mar 1, 2019 | Never finaled issued Sep 2019, no final | 2301 Kirkham St | remove kitchen on 1st fl. install new kitchen on 2nd fl.Details
remove kitchen on 1st fl. install new kitchen on 2nd fl. | $8,000 |
| Oct 31, 2018 | Completed final sign-off Feb 2023 | 201 Pope St | legalization of dwelling unit @ 1st flr per ord# 43-14, planning section 207.3. new unit included kitchen, bathroom, living room and bedroom.Details
legalization of dwelling unit @ 1st flr per ord# 43-14, planning section 207.3. new unit included kitchen, bathroom, living room and bedroom. | $10,000 |