Bmj Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2020 to Sep 2026
- Last 24 months
- 13 permits filed
18 permits since 2000: 11 completed, 5 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2026 | In progress issued Sep 2026 | 42 Seminole Av | 1/f: add bedroom, family room, bathroom mechanical room & storage; 2/f: remodel kitchen & bathroom and add (1) new powder.Details
1/f: add bedroom, family room, bathroom mechanical room & storage; 2/f: remodel kitchen & bathroom and add (1) new powder. | $145,000 |
| Aug 1, 2026 | In progress issued Aug 2026 | 1125 Holloway Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $45,000 |
| May 22, 2026 | Completed final sign-off Aug 2026 | 231 Evelyn Wy | 1st fl legalize as built office, family room and bathroom. 2nd fl legalize as built powder roomDetails
1st fl legalize as built office, family room and bathroom. 2nd fl legalize as built powder room | $10,000 |
| Mar 31, 2026 | Completed final sign-off Jul 2026 | 429 Steiner St | replace kitchen cabinets and change the bath tub to a shower. replace two vinyl windows in the back of the unit 429. replace one outlet and fan on the bathroom. add outlet under sink in the kitchen.Details
replace kitchen cabinets and change the bath tub to a shower. replace two vinyl windows in the back of the unit 429. replace one outlet and fan on the bathroom. add outlet under sink in the kitchen. | $15,000 |
| Mar 9, 2026 | Completed final sign-off Apr 2026 | 2174 36th Av | remove the drywall from the hallway ceiling to fix the water heater furnace flues.Details
remove the drywall from the hallway ceiling to fix the water heater furnace flues. | $1,000 |
| Oct 8, 2025 | Completed final sign-off Jan 2026 | 1600 Webster St | kitchen: replacing cabinets, countertop, and floor-tile (120 square feet).kitchen cofioguration has change from an angle peninsula cabinetry to an stray prninsula, adding a new patry cabinet at the oposite side.Details
kitchen: replacing cabinets, countertop, and floor-tile (120 square feet).kitchen cofioguration has change from an angle peninsula cabinetry to an stray prninsula, adding a new patry cabinet at the oposite side. | $15,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 407 Balboa St | install plumbing fixtures, display case, counter, restroom remodel. all work at 407 balboa st.Details
install plumbing fixtures, display case, counter, restroom remodel. all work at 407 balboa st. | $35,000 |
| Aug 19, 2025 | Completed final sign-off Feb 2026 | 728 Page St | unit 5: update bathroom, replacing claw foot tub with shower. replacing 6 windows on 4th floor street facing with vinyl double hung.Details
unit 5: update bathroom, replacing claw foot tub with shower. replacing 6 windows on 4th floor street facing with vinyl double hung. | $15,000 |
| Feb 20, 2025 | Completed final sign-off Jun 2025 | 3278 20th St | rev to pa# 2025-0113-8201: sqft ceiling in the hallway to run the furnance duct, relocate the kitchen sink, install new furnace, add lights in the hallway and outletsDetails
rev to pa# 2025-0113-8201: sqft ceiling in the hallway to run the furnance duct, relocate the kitchen sink, install new furnace, add lights in the hallway and outlets | $7,500 |
| Jan 23, 2025 | Completed final sign-off Apr 2025 | 1373 17th Av | install new tiles in the entrance hallway, install reccess lights in the hallway and replace the electrical panelDetails
install new tiles in the entrance hallway, install reccess lights in the hallway and replace the electrical panel | $1,500 |
| Jan 13, 2025 | Completed final sign-off Jun 2025 | 3278 20th St | replace kitchen cabinets, retile bathroom, new toilet. new vanity, tile, shower enclosure, paint unit, and new laminated floor.Details
replace kitchen cabinets, retile bathroom, new toilet. new vanity, tile, shower enclosure, paint unit, and new laminated floor. | $18,000 |
| Dec 19, 2024 | In progress issued May 2025 | 856 Union St | interior remodel in the top unit. remodel (e) kitchen and bathroom. add (2) new bathrooms. remove bearing wall in the kitchen/living room. insulation, sheetrock, and rewiring the electrical throughout the house.Details
interior remodel in the top unit. remodel (e) kitchen and bathroom. add (2) new bathrooms. remove bearing wall in the kitchen/living room. insulation, sheetrock, and rewiring the electrical throughout the house. | $110,000 |
| Dec 12, 2024 | In progress issued Dec 2024 | 728 Page St | unit #2 revision to pa # 2024-0611-4232 add insulation and sheetrock for entire unitDetails
unit #2 revision to pa # 2024-0611-4232 add insulation and sheetrock for entire unit | $3,000 |
| Sep 11, 2024 | Expired or cancelled expired Nov 2025 | 728 Page St | revision to pa# 202406114232: (unit 2) revise kitchen layout. close out one windowDetails
revision to pa# 202406114232: (unit 2) revise kitchen layout. close out one window | |
| Jun 11, 2024 | Expired or cancelled expired Nov 2025 | 728 Page St | unit #2: (e) kitchen & bathroom remodel. add powder room. new door at bedroom to access yard.Details
unit #2: (e) kitchen & bathroom remodel. add powder room. new door at bedroom to access yard. | $45,000 |
| Oct 27, 2023 | In progress issued Oct 2023 | 255 Waller St | repair (2) posts on the outside stair, riser and step - less than 50% repair. repair in kind.Details
repair (2) posts on the outside stair, riser and step - less than 50% repair. repair in kind. | $2,500 |
| Jun 14, 2022 | Completed final sign-off Oct 2023 | 1133 Silver Av | construct 3 bedrooms, 2 full bath, & family room at g/f. remodel (e) kitchen, bathroom, & add 1 new full bathroom at 2nd floor.Details
construct 3 bedrooms, 2 full bath, & family room at g/f. remodel (e) kitchen, bathroom, & add 1 new full bathroom at 2nd floor. | $138,000 |
| Mar 3, 2020 | Completed final sign-off Dec 2022 | 49 Tioga Av | comply with violation #201902260 dated 11/19/19. legalize ground floor family room, office and full bath and 1/2 bathDetails
comply with violation #201902260 dated 11/19/19. legalize ground floor family room, office and full bath and 1/2 bath | $15,000 |