Back to bathroom remodel contractors
Bmj Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2020 to Sep 2026
- Last 24 months
- 14 permits filed
19 permits since 2000: 12 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 6
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
11 bathroom remodel permits: 7 completed, 3 in progress, 1 expired or cancelled. Typically 15 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Nov 2026 | 130 Caine Av | relocate/remodel (e) kitchen, bedroom & bathroom. add one bedroom & 1 full bathroom. rmeodel (e) front deck. add tankless water heater.Details
relocate/remodel (e) kitchen, bedroom & bathroom. add one bedroom & 1 full bathroom. rmeodel (e) front deck. add tankless water heater. | $100,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 42 Seminole Av | 1/f: add bedroom, family room, bathroom mechanical room & storage; 2/f: remodel kitchen & bathroom and add (1) new powder.Details
1/f: add bedroom, family room, bathroom mechanical room & storage; 2/f: remodel kitchen & bathroom and add (1) new powder. | $145,000 |
| Aug 1, 2026 | Completed final sign-off Oct 2026 | 1125 Holloway Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $45,000 |
| May 22, 2026 | Completed final sign-off Aug 2026 | 231 Evelyn Wy | 1st fl legalize as built office, family room and bathroom. 2nd fl legalize as built powder roomDetails
1st fl legalize as built office, family room and bathroom. 2nd fl legalize as built powder room | $10,000 |
| Mar 31, 2026 | Completed final sign-off Jul 2026 | 429 Steiner St | replace kitchen cabinets and change the bath tub to a shower. replace two vinyl windows in the back of the unit 429. replace one outlet and fan on the bathroom. add outlet under sink in the kitchen.Details
replace kitchen cabinets and change the bath tub to a shower. replace two vinyl windows in the back of the unit 429. replace one outlet and fan on the bathroom. add outlet under sink in the kitchen. | $15,000 |
| Aug 19, 2025 | Completed final sign-off Feb 2026 | 728 Page St | unit 5: update bathroom, replacing claw foot tub with shower. replacing 6 windows on 4th floor street facing with vinyl double hung.Details
unit 5: update bathroom, replacing claw foot tub with shower. replacing 6 windows on 4th floor street facing with vinyl double hung. | $15,000 |
| Jan 13, 2025 | Completed final sign-off Jun 2025 | 3278 20th St | replace kitchen cabinets, retile bathroom, new toilet. new vanity, tile, shower enclosure, paint unit, and new laminated floor.Details
replace kitchen cabinets, retile bathroom, new toilet. new vanity, tile, shower enclosure, paint unit, and new laminated floor. | $18,000 |
| Dec 19, 2024 | In progress issued May 2025 | 856 Union St | interior remodel in the top unit. remodel (e) kitchen and bathroom. add (2) new bathrooms. remove bearing wall in the kitchen/living room. insulation, sheetrock, and rewiring the electrical throughout the house.Details
interior remodel in the top unit. remodel (e) kitchen and bathroom. add (2) new bathrooms. remove bearing wall in the kitchen/living room. insulation, sheetrock, and rewiring the electrical throughout the house. | $110,000 |
| Jun 11, 2024 | Expired or cancelled expired Nov 2025 | 728 Page St | unit #2: (e) kitchen & bathroom remodel. add powder room. new door at bedroom to access yard.Details
unit #2: (e) kitchen & bathroom remodel. add powder room. new door at bedroom to access yard. | $45,000 |
| Jun 14, 2022 | Completed final sign-off Oct 2023 | 1133 Silver Av | construct 3 bedrooms, 2 full bath, & family room at g/f. remodel (e) kitchen, bathroom, & add 1 new full bathroom at 2nd floor.Details
construct 3 bedrooms, 2 full bath, & family room at g/f. remodel (e) kitchen, bathroom, & add 1 new full bathroom at 2nd floor. | $138,000 |
| Mar 3, 2020 | Completed final sign-off Dec 2022 | 49 Tioga Av | comply with violation #201902260 dated 11/19/19. legalize ground floor family room, office and full bath and 1/2 bathDetails
comply with violation #201902260 dated 11/19/19. legalize ground floor family room, office and full bath and 1/2 bath | $15,000 |