Permit GraphShortlistSan Francisco building permits since 2000

Ray Reinertson

License
404737
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
R.M.R. Construction Company
Based in
San Francisco
On San Francisco permits
Jun 2000 to Oct 2026

465 permits since 2000 (contractor on 465 permits, authorized agent-others on 2 permits): 386 completed, 8 in progress, 56 never finaled, 15 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Bcci Construction Company
Architects
Stanley Lew (17), Lawrence Smith (10), Douglas Mehl (9), John Kamus (4), Aaron Hanigan (2), George Soskin (2), Roger Wong (2), Teresa K Emery (2), Bert Deviterbo, Christopher Mcmahon, Heather Sanders-Jacobs, Jeffrey Cortinas
Engineers
Jesus B Cabellon Jr (12), Rodolfo Bustos (5), Amit Wadhwa (3), Levi Abarte (3), Patrick Buscovich (3), Alexander Joseph Pacheco (2), Adrian Nacamuli, Alex Filatov, Craig Laws, Timothy W. Mcpartland
Authorized agents
Patrick Buscovich

Most recent permits

Showing the 100 most recent of 465.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 20, 2026In progress
issued Oct 2026
1 California StR.M.R. Construction Company16/f: relocate existing demising wall between 2 office suites, scope includes demo and construction of non structural partitions, ceilings, glazing, doors, millwork, finish and restroom upgrade.
Details
Permit
202610209654
Permit issued
Oct 29, 2026

16/f: relocate existing demising wall between 2 office suites, scope includes demo and construction of non structural partitions, ceilings, glazing, doors, millwork, finish and restroom upgrade.

Open the permit page

$48,280
Aug 4, 2026In progress
issued Aug 2026
1 California StR.M.R. Construction Company30th fl, ste 3050 interior ti including selective demo and construction of non-structural partitions, doors, glazing, electrical outlets, finishes and lighting
Details
Permit
202608046004
Permit issued
Aug 18, 2026

30th fl, ste 3050 interior ti including selective demo and construction of non-structural partitions, doors, glazing, electrical outlets, finishes and lighting

Open the permit page

$139,810
Jul 29, 2026Completed
final sign-off Aug 2026
1 California StR.M.R. Construction Company22nd floor: restroom upgrade consisting of demo and construction of selective fixtures, finishes and accessories.
Details
Permit
202607295708
Permit issued
Jul 31, 2026
Final sign-off
Aug 24, 2026

22nd floor: restroom upgrade consisting of demo and construction of selective fixtures, finishes and accessories.

Open the permit page

$15,870
Jul 21, 2026Completed
final sign-off Aug 2026
501 02nd StR.M.R. Construction Companyrevision 202604149417 to address inspector req to identity location to accessible phone room and req signage
Details
Permit
202607215346
Permit issued
Jul 31, 2026
Final sign-off
Aug 21, 2026

revision 202604149417 to address inspector req to identity location to accessible phone room and req signage

Open the permit page

Jun 30, 2026In progress
issued Jul 2026
1 California StR.M.R. Construction Company31st fl - demo only of non-structural partitions, doors, glazing, flooring, millwork, finishes, ceilings and light fixtures. no build back
Details
Permit
202606304163
Permit issued
Jul 14, 2026

31st fl - demo only of non-structural partitions, doors, glazing, flooring, millwork, finishes, ceilings and light fixtures. no build back

Open the permit page

$127,035
Apr 14, 2026Completed
final sign-off Aug 2026
501 02nd StR.M.R. Construction Company3/fl- suite 350 - revision 202510026586- addition of (3) new phone booths to tenant space
Details
Permit
202604149417
Permit issued
May 12, 2026
Final sign-off
Aug 21, 2026

3/fl- suite 350 - revision 202510026586- addition of (3) new phone booths to tenant space

Open the permit page

$34,000
Mar 20, 2026Completed
final sign-off Apr 2026
501 02nd StR.M.R. Construction Company1st/f ste# 150: revision to 202512030848, install 2 phone pods
Details
Permit
202603207993
Permit issued
Mar 20, 2026
Final sign-off
Apr 14, 2026

1st/f ste# 150: revision to 202512030848, install 2 phone pods

Open the permit page

$12,000
Mar 19, 2026Completed
final sign-off May 2026
501 02nd StR.M.R. Construction Company(ste 350) deferred mep to pa# 202510026586: tenant improvement project/alternation of (e) office space. mech modifications to accomodate architectural layout changes. ductwork, with insulation as needed. reconfiguration of (e) ductwork and air distribution and air balance.
Details
Permit
202603197928
Permit issued
Mar 20, 2026
Final sign-off
May 27, 2026

(ste 350) deferred mep to pa# 202510026586: tenant improvement project/alternation of (e) office space. mech modifications to accomodate architectural layout changes. ductwork, with insulation as needed. reconfiguration of (e) ductwork and air distribution and air balance.

Open the permit page

$32,000
Mar 19, 2026Completed
final sign-off May 2026
501 02nd StR.M.R. Construction Companysuite 100: mech modificaitons for ti.i. 202511200064: new vav boxes, ductwork and hot water piping with insulation as needed. reconfig of (e) ductwork and air distribution ddc controls and air balance.
Details
Permit
202603197936
Permit issued
Mar 19, 2026
Final sign-off
May 27, 2026

suite 100: mech modificaitons for ti.i. 202511200064: new vav boxes, ductwork and hot water piping with insulation as needed. reconfig of (e) ductwork and air distribution ddc controls and air balance.

Open the permit page

$38,000
Mar 12, 2026Completed
final sign-off May 2026
501 02nd StR.M.R. Construction Companyste 501. (2) new privacy pods. provide seismic anchorage to concrete slab.
Details
Permit
202603127477
Permit issued
Mar 13, 2026
Final sign-off
May 27, 2026

ste 501. (2) new privacy pods. provide seismic anchorage to concrete slab.

Open the permit page

$18,000
Feb 5, 2026In progress
filed Feb 2026, not yet issued
501 02nd StR.M.R. Construction Companyadministrative permit to document no mechanical or plumbing component of pa 2025-1002-6586. electrical component will be constructed under separate permit (2026-0205-5310).
Details
Permit
202602055291

administrative permit to document no mechanical or plumbing component of pa 2025-1002-6586. electrical component will be constructed under separate permit (2026-0205-5310).

Open the permit page

Feb 5, 2026Completed
final sign-off May 2026
501 02nd StR.M.R. Construction Companyoffice tenant retrofit relocated lighting fixtures associated circuiting/controls changes. deferred electrical componenet of pa 202510026586
Details
Permit
202602055310
Permit issued
Feb 5, 2026
Final sign-off
May 27, 2026

office tenant retrofit relocated lighting fixtures associated circuiting/controls changes. deferred electrical componenet of pa 202510026586

Open the permit page

Dec 3, 2025Completed
final sign-off Apr 2026
501 02nd StR.M.R. Construction Company#150: installing 3 new privacy pods. provide seismic anchorage to concrete slab.
Details
Permit
202512030848
Permit issued
Dec 3, 2025
Final sign-off
Apr 14, 2026

#150: installing 3 new privacy pods. provide seismic anchorage to concrete slab.

Open the permit page

$9,000
Nov 20, 2025Completed
final sign-off May 2026
501 02nd StR.M.R. Construction Company1/fl- ti improvement -ste 100- to include demo non strutural partitions and ceiling, consturction of (n) partitions, ceilings, power and finishes. under separte permit,mep , fire life/safety , fire sprinklers
Details
Permit
202511200064
Permit issued
Dec 19, 2025
Final sign-off
May 27, 2026

1/fl- ti improvement -ste 100- to include demo non strutural partitions and ceiling, consturction of (n) partitions, ceilings, power and finishes. under separte permit,mep , fire life/safety , fire sprinklers

Open the permit page

$100,000
Oct 2, 2025Completed
final sign-off May 2026
501 02nd StR.M.R. Construction Companysuite 350: tenant improvement to include demolition of non structural partitions and ceiling. construction of new ceiling, power and finishes. mep, fire/life safety and fire sprinklers to be submitted separately
Details
Permit
202510026586
Permit issued
Nov 13, 2025
Final sign-off
May 27, 2026

suite 350: tenant improvement to include demolition of non structural partitions and ceiling. construction of new ceiling, power and finishes. mep, fire/life safety and fire sprinklers to be submitted separately

Open the permit page

$150,000
Sep 5, 2025Completed
final sign-off Mar 2026
235 Montgomery StR.M.R. Construction Companyprovide new lighting and branch circuiting to existing panel. 16/f. ref pa# 202507140767
Details
Permit
202509054712
Permit issued
Sep 8, 2025
Final sign-off
Mar 19, 2026

provide new lighting and branch circuiting to existing panel. 16/f. ref pa# 202507140767

Open the permit page

$12,500
Aug 19, 2025Completed
final sign-off Sep 2025
501 02nd StR.M.R. Construction Company1st/f ste# 150: provide seismic anchorage to privacy pods per fire department nov 2506-0190 dated 6/11/25
Details
Permit
202508193408
Permit issued
Aug 21, 2025
Final sign-off
Sep 18, 2025

1st/f ste# 150: provide seismic anchorage to privacy pods per fire department nov 2506-0190 dated 6/11/25

Open the permit page

$12,000
Aug 13, 2025Completed
final sign-off Aug 2025
215 Eureka StR.M.R. Construction Companyto obtain final inspection for work approved under pa#201810223816, 202212158421, all work is complete.
Details
Permit
202508132948
Permit issued
Aug 13, 2025
Final sign-off
Aug 15, 2025

to obtain final inspection for work approved under pa#201810223816, 202212158421, all work is complete.

Open the permit page

Jul 14, 2025Completed
final sign-off Mar 2026
235 Montgomery StR.M.R. Construction Company16th fl - revision to pa 202505055769 room 1653 drywall ceiling to acoustic and wall from floor to ceiling to ceiling height
Details
Permit
202507140767
Permit issued
Jul 15, 2025
Final sign-off
Mar 19, 2026

16th fl - revision to pa 202505055769 room 1653 drywall ceiling to acoustic and wall from floor to ceiling to ceiling height

Open the permit page

Jun 27, 2025In progress
issued Jul 2025
50 California StR.M.R. Construction Company26/f tenant improvment of existing suite 2670 including demo of non structural partitions, new non-structural partitions, door, ceilings, millwork, finishes, and light fixtures
Details
Permit
202506279667
Permit issued
Jul 9, 2025

26/f tenant improvment of existing suite 2670 including demo of non structural partitions, new non-structural partitions, door, ceilings, millwork, finishes, and light fixtures

Open the permit page

$432,708
Jun 27, 2025Completed
final sign-off Mar 2026
235 Montgomery StR.M.R. Construction Company16th fl - mech'l modifications & selective demolition to support arch'l layout and (n) equipment; relcoate 3 (e) thermostats; install (n) split system unit; addition of exhaust fans for server closets; remove & replace ductwork & registers as needed; air balancing & duct insulation where required;
Details
Permit
202506279661
Permit issued
Jun 30, 2025
Final sign-off
Mar 19, 2026

16th fl - mech'l modifications & selective demolition to support arch'l layout and (n) equipment; relcoate 3 (e) thermostats; install (n) split system unit; addition of exhaust fans for server closets; remove & replace ductwork & registers as needed; air balancing & duct insulation where required;

Open the permit page

$18,000
Jun 11, 2025In progress
issued Jun 2025
1 California StR.M.R. Construction Companydemolition of non structural walls, doors, glazing, flooring, electrical, millwork, finishes, ceilings, light fixtures, demo only. no build back.
Details
Permit
202506118398
Permit issued
Jun 26, 2025

demolition of non structural walls, doors, glazing, flooring, electrical, millwork, finishes, ceilings, light fixtures, demo only. no build back.

Open the permit page

$127,035
May 5, 2025Completed
final sign-off Mar 2026
235 Montgomery StR.M.R. Construction Company16th fl tenant improvement including stair infill
Details
Permit
202505055769
Permit issued
May 8, 2025
Final sign-off
Mar 19, 2026

16th fl tenant improvement including stair infill

Open the permit page

$620,000
Mar 7, 2025In progress
issued Mar 2025
50 California StR.M.R. Construction Company26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment.
Details
Permit
202503071783
Permit issued
Mar 20, 2025

26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment.

Open the permit page

$440,198
Dec 3, 2024Completed
final sign-off Aug 2025
215 Eureka StR.M.R. Construction Companyrevision to pa# 201810223816: clarify roof type (metal) and revise carpentry slope.
Details
Permit
202412036009
Permit issued
Dec 3, 2024
Final sign-off
Aug 15, 2025

revision to pa# 201810223816: clarify roof type (metal) and revise carpentry slope.

Open the permit page

Oct 1, 2024Completed
final sign-off Oct 2025
235 Montgomery StR.M.R. Construction Company27th floor: revision to pa#202308144397 to modify and remove doors and relocation of exit signs.
Details
Permit
202410012076
Permit issued
Feb 28, 2025
Final sign-off
Oct 7, 2025

27th floor: revision to pa#202308144397 to modify and remove doors and relocation of exit signs.

Open the permit page

$2,800
Oct 1, 2024Completed
final sign-off Jan 2025
235 Montgomery StR.M.R. Construction Company26th floor: revision to pa#202305177973 to modify entry door swing and location of janitor closet. added dimensions to restroom plans.
Details
Permit
202410012078
Permit issued
Oct 30, 2024
Final sign-off
Jan 14, 2025

26th floor: revision to pa#202305177973 to modify entry door swing and location of janitor closet. added dimensions to restroom plans.

Open the permit page

$1,650
Sep 18, 2024Completed
final sign-off Apr 2025
235 Montgomery StR.M.R. Construction Company21st/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. provided california title 24 compliance forms. ref to t.i. 202405222639
Details
Permit
202409181085
Permit issued
Sep 19, 2024
Final sign-off
Apr 23, 2025

21st/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. provided california title 24 compliance forms. ref to t.i. 202405222639

Open the permit page

Aug 8, 2024Completed
final sign-off Sep 2024
1 California StR.M.R. Construction Companyground floor: removal of non bearing concrete walls at vault.
Details
Permit
202408088290
Permit issued
Aug 9, 2024
Final sign-off
Sep 10, 2024

ground floor: removal of non bearing concrete walls at vault.

Open the permit page

$9,500
Jun 20, 2024Completed
final sign-off Nov 2025
235 Montgomery StR.M.R. Construction Company27/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. work under bpa# 202312273146. provided california title 24 compliance forms.
Details
Permit
202406204886
Permit issued
Jun 20, 2024
Final sign-off
Nov 24, 2025

27/f: provide new lighting and branch circuits to (e) panel also new power and signal and branch circuits to (e) power. work under bpa# 202312273146. provided california title 24 compliance forms.

Open the permit page

May 22, 2024Completed
final sign-off Apr 2025
235 Montgomery StR.M.R. Construction Companyste 2100. expansion to work approved under pa# 202403016969. ti installing non bearing partition wall for offices, conference room, breakroom, library etc. mep, mech, mech-e is deferred.
Details
Permit
202405222639
Permit issued
Jun 5, 2024
Final sign-off
Apr 23, 2025

ste 2100. expansion to work approved under pa# 202403016969. ti installing non bearing partition wall for offices, conference room, breakroom, library etc. mep, mech, mech-e is deferred.

Open the permit page

$250,000
Mar 1, 2024Completed
final sign-off Jul 2024
1 California StR.M.R. Construction Companyper ab-017: interior demo only project including demo of e gyp bd sheathing at e nonn bearing, non rated walls. demo of e miscellaneous floor and wall finishes. no ceiling demo. maher not req
Details
Permit
202403016867
Permit issued
Mar 5, 2024
Final sign-off
Jul 24, 2024

per ab-017: interior demo only project including demo of e gyp bd sheathing at e nonn bearing, non rated walls. demo of e miscellaneous floor and wall finishes. no ceiling demo. maher not req

Open the permit page

$105,800
Mar 1, 2024In progress
issued Mar 2024
235 Montgomery StR.M.R. Construction Companyinterior t.i minor reconfiguring at bathroom, revision to bpa# 202310249380. mep, life safety and spinrkler under sep permit.
Details
Permit
202403016970
Permit issued
Mar 25, 2024

interior t.i minor reconfiguring at bathroom, revision to bpa# 202310249380. mep, life safety and spinrkler under sep permit.

Open the permit page

$64,000
Mar 1, 2024Completed
final sign-off Apr 2025
235 Montgomery StR.M.R. Construction Companyrevision to pa# 202311201136. inteiro t.i of elevator lobby, stair vestiblues restrooms, and corridor, demo of non structural partitiions. new partitions, finishes, fixtures and lighting, mep, fire life safety and sprinler under sep permit.
Details
Permit
202403016969
Permit issued
Mar 26, 2024
Final sign-off
Apr 18, 2025

revision to pa# 202311201136. inteiro t.i of elevator lobby, stair vestiblues restrooms, and corridor, demo of non structural partitiions. new partitions, finishes, fixtures and lighting, mep, fire life safety and sprinler under sep permit.

Open the permit page

$38,000
Dec 27, 2023Completed
final sign-off Oct 2025
235 Montgomery StR.M.R. Construction Company27/f- interior tenant improvement- demo of non structural partitions. new partitions, finishes, fixtures and lighting. mep, fire life safety and sprinkler under separate permits.
Details
Permit
202312273146
Permit issued
Dec 27, 2023
Final sign-off
Oct 7, 2025

27/f- interior tenant improvement- demo of non structural partitions. new partitions, finishes, fixtures and lighting. mep, fire life safety and sprinkler under separate permits.

Open the permit page

$12,000
Nov 20, 2023Completed
final sign-off Apr 2025
235 Montgomery StR.M.R. Construction Company21st fl - revision to pa 202310249381 interior ti of elevator lobby, stair vestibules, restrooms, and corridor; demo of non-structural partitions; new partitions, finishes and lighting, mep, fire life safety and sprinkler under separate permit
Details
Permit
202311201136
Permit issued
Nov 20, 2023
Final sign-off
Apr 18, 2025

21st fl - revision to pa 202310249381 interior ti of elevator lobby, stair vestibules, restrooms, and corridor; demo of non-structural partitions; new partitions, finishes and lighting, mep, fire life safety and sprinkler under separate permit

Open the permit page

$6,500
Oct 24, 2023Never finaled
issued Nov 2023, no final
235 Montgomery StR.M.R. Construction Company19/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, finishes, fixtures and lighting mep, fire life safety and sprinkler under separate permit.
Details
Permit
202310249380
Permit issued
Nov 16, 2023

19/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, finishes, fixtures and lighting mep, fire life safety and sprinkler under separate permit.

Open the permit page

$85,000
Oct 24, 2023Completed
final sign-off Apr 2025
235 Montgomery StR.M.R. Construction Company21/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, fixtures and lighting mep, fire life safety and sprinkler under separate permit.
Details
Permit
202310249381
Permit issued
Nov 16, 2023
Final sign-off
Apr 23, 2025

21/f: interior ti of elevator lobby, stair vestibules and restrooms demolition of non-structural partitions. new partitions, fixtures and lighting mep, fire life safety and sprinkler under separate permit.

Open the permit page

$85,000
Aug 31, 2023Completed
final sign-off Jan 2024
1456 Page StR.M.R. Construction Companyunit a: replacement of 6 windows within (e) openings. not viible from street. with marvin wood aluminum clad or equivalent windows. windows are located at the rear.
Details
Permit
202308315666
Permit issued
Aug 31, 2023
Final sign-off
Jan 18, 2024

unit a: replacement of 6 windows within (e) openings. not viible from street. with marvin wood aluminum clad or equivalent windows. windows are located at the rear.

Open the permit page

$4,200
Aug 30, 2023Completed
final sign-off Apr 2025
235 Montgomery StR.M.R. Construction Company21/f: removal of non-structural partitions, light fixtures, millwork, plumbing fixtures, and finishes. new temp. lighting to provide code complaint lighting coverage throughouts per ab-017. exception to requirement for disabled access to vacant spaces suite to remain unoccupied.
Details
Permit
202308305644
Permit issued
Aug 31, 2023
Final sign-off
Apr 18, 2025

21/f: removal of non-structural partitions, light fixtures, millwork, plumbing fixtures, and finishes. new temp. lighting to provide code complaint lighting coverage throughouts per ab-017. exception to requirement for disabled access to vacant spaces suite to remain unoccupied.

Open the permit page

$188,000
Aug 30, 2023Never finaled
issued Aug 2023, no final
235 Montgomery StR.M.R. Construction Company19/f: removal of non-structural partitions, light fixtures, millwork, plumbing fixtures, and finishes. new temp. lighting to provide code complaint lighting coverage throughouts per ab-017. exception to requirement for disabled access to vacant spaces suite to remain unoccupied.
Details
Permit
202308305642
Permit issued
Aug 31, 2023

19/f: removal of non-structural partitions, light fixtures, millwork, plumbing fixtures, and finishes. new temp. lighting to provide code complaint lighting coverage throughouts per ab-017. exception to requirement for disabled access to vacant spaces suite to remain unoccupied.

Open the permit page

$188,000
Aug 14, 2023Never finaled
issued Aug 2023, no final
235 Montgomery StR.M.R. Construction Company27/f: interior t.i. of non-structural partitions, finishes, and lighting. mep, fire life safety & sprinkler under separate permit.
Details
Permit
202308144397
Permit issued
Aug 24, 2023

27/f: interior t.i. of non-structural partitions, finishes, and lighting. mep, fire life safety & sprinkler under separate permit.

Open the permit page

$187,000
Jul 26, 2023Completed
final sign-off Jan 2024
1456 Page StR.M.R. Construction Companyunit #a: amendment to bpa #202306200385. removal of drywall finishes, installing insulation, and installing approx. 750 sq ft of drywall per comments from building inspector.
Details
Permit
202307263014
Permit issued
Jul 26, 2023
Final sign-off
Jan 26, 2024

unit #a: amendment to bpa #202306200385. removal of drywall finishes, installing insulation, and installing approx. 750 sq ft of drywall per comments from building inspector.

Open the permit page

$7,500
Jul 21, 2023Completed
final sign-off Aug 2023
501 02nd StR.M.R. Construction Companysuite 710: office tenant retrofit, lighting fixtures/associatred circuiting/controls, power/signal devices & associated wiring
Details
Permit
202307212705
Permit issued
Jul 21, 2023
Final sign-off
Aug 16, 2023

suite 710: office tenant retrofit, lighting fixtures/associatred circuiting/controls, power/signal devices & associated wiring

Open the permit page

$185,000
Jun 20, 2023Completed
final sign-off Feb 2024
1456 Page StR.M.R. Construction Companyunit# a: remodeling of one kitchen including replacing of cabinets and countertops. non structural.
Details
Permit
202306200385
Permit issued
Jun 20, 2023
Final sign-off
Feb 6, 2024

unit# a: remodeling of one kitchen including replacing of cabinets and countertops. non structural.

Open the permit page

$18,000
May 17, 2023Completed
final sign-off Jan 2025
235 Montgomery StR.M.R. Construction Company26/f: interior tenant improvement, demo of non-structural patitions, new partitons, finishes, fixtures and lighting, mep, fire, life safety, sprinkler sep permit.
Details
Permit
202305177973
Permit issued
Jun 16, 2023
Final sign-off
Jan 14, 2025

26/f: interior tenant improvement, demo of non-structural patitions, new partitons, finishes, fixtures and lighting, mep, fire, life safety, sprinkler sep permit.

Open the permit page

$328,000
Apr 18, 2023Completed
final sign-off Nov 2023
235 Montgomery StR.M.R. Construction Companysuite 1050: deferred application on 202211166636. providing new lighting and branch circuiting to existing panel. maintain some ex power and signal circuits and new power and branch circuts. raceway systems as req.
Details
Permit
202304185971
Permit issued
May 17, 2023
Final sign-off
Nov 7, 2023

suite 1050: deferred application on 202211166636. providing new lighting and branch circuiting to existing panel. maintain some ex power and signal circuits and new power and branch circuts. raceway systems as req.

Open the permit page

$21,250
Jan 6, 2023Completed
final sign-off May 2023
501 02nd StR.M.R. Construction Companydemising (e) suite 120 into 2 separate suites. (e) suite 120 no new construction. (n) suite 150: const new full height partitions, doors, glazing, millwork, finishing and asscos power ltg distribution. deferred life safety, elec & mech
Details
Permit
202301069815
Permit issued
Jan 11, 2023
Final sign-off
May 19, 2023

demising (e) suite 120 into 2 separate suites. (e) suite 120 no new construction. (n) suite 150: const new full height partitions, doors, glazing, millwork, finishing and asscos power ltg distribution. deferred life safety, elec & mech

Open the permit page

$60,000
Dec 27, 2022Completed
final sign-off Aug 2023
501 02nd StR.M.R. Construction Company7/f suite 710: demolition of some existing non bearing ceiling height walls, construction of new full height partitions, glazing, pantry, millwork, plumbing, finishes and assoc. electrical power/light dist. deferred: life safety, elect, mech and plumbing.
Details
Permit
202212279171
Permit issued
Dec 30, 2022
Final sign-off
Aug 16, 2023

7/f suite 710: demolition of some existing non bearing ceiling height walls, construction of new full height partitions, glazing, pantry, millwork, plumbing, finishes and assoc. electrical power/light dist. deferred: life safety, elect, mech and plumbing.

Open the permit page

$312,650
Dec 15, 2022Expired or cancelled
expired Aug 2025
215 Eureka StR.M.R. Construction Companyreinstalling approx 80sf of existing siding
Details
Permit
202212158421
Permit issued
Dec 15, 2022

reinstalling approx 80sf of existing siding

Open the permit page

$650
Dec 6, 2022Completed
final sign-off May 2023
501 02nd StR.M.R. Construction Companysuite 650: new millwork base/upper cabinets, new sink, associated electrical power/lighting distribution & associated plumbing
Details
Permit
202212067749
Permit issued
Dec 7, 2022
Final sign-off
May 19, 2023

suite 650: new millwork base/upper cabinets, new sink, associated electrical power/lighting distribution & associated plumbing

Open the permit page

$12,200
Dec 5, 2022Completed
final sign-off Nov 2023
235 Montgomery StR.M.R. Construction Company10th ste#1050. mech t.i. 12 (n) fan coil units, (2) (n) supply fans, (1) (n) condenser unit, (2) (n) branch selector boxes, (2) (n) louvers, insulation,controls, air balance, duckwork, diffusers, refrigerant and condensate piping. ref#2022-1116-6636
Details
Permit
202212057669
Permit issued
Dec 5, 2022
Final sign-off
Nov 7, 2023

10th ste#1050. mech t.i. 12 (n) fan coil units, (2) (n) supply fans, (1) (n) condenser unit, (2) (n) branch selector boxes, (2) (n) louvers, insulation,controls, air balance, duckwork, diffusers, refrigerant and condensate piping. ref#2022-1116-6636

Open the permit page

$186,000
Nov 16, 2022Completed
final sign-off Sep 2023
235 Montgomery StR.M.R. Construction Company10th fl, ste 1050 - interior tenant improvement to include new non-structural non-load bearing partitions, offices, break area, millwork, light fixtures and finishes
Details
Permit
202211166636
Permit issued
Nov 21, 2022
Final sign-off
Sep 15, 2023

10th fl, ste 1050 - interior tenant improvement to include new non-structural non-load bearing partitions, offices, break area, millwork, light fixtures and finishes

Open the permit page

$300,000
Oct 18, 2022Never finaled
issued Oct 2022, no final
243 Montgomery StR.M.R. Construction Companyref pa 202206025449. add health to routing
Details
Permit
202210184604
Permit issued
Oct 25, 2022

ref pa 202206025449. add health to routing

Open the permit page

Oct 5, 2022Completed
final sign-off Sep 2023
235 Montgomery StR.M.R. Construction Company#1050: demolition of non-structural partitions.
Details
Permit
202210053822
Permit issued
Oct 6, 2022
Final sign-off
Sep 15, 2023

#1050: demolition of non-structural partitions.

Open the permit page

$26,000
Sep 23, 2022Never finaled
issued Oct 2022, no final
1 California StR.M.R. Construction Companydemo of partitions, ceiling, light fixtures, millwork and finishes
Details
Permit
202209233008
Permit issued
Oct 6, 2022

demo of partitions, ceiling, light fixtures, millwork and finishes

Open the permit page

$94,000
Sep 15, 2022Completed
final sign-off Apr 2023
1 California StR.M.R. Construction Companyon 18th floor - demo of parttions, ceilings, lights, fixtures, millwork and finishes. per ab-017, no disabled access req'd.
Details
Permit
202209152484
Permit issued
Nov 23, 2022
Final sign-off
Apr 26, 2023

on 18th floor - demo of parttions, ceilings, lights, fixtures, millwork and finishes. per ab-017, no disabled access req'd.

Open the permit page

$189,000
Aug 17, 2022Completed
final sign-off Feb 2023
1119 Webster StR.M.R. Construction Companyunit 2: remodeling kitchen and bathroom including replacing cabinets, counter tops, plumbing fixtures, electrical fixtures and tiling. lighting shall comply with cec 150.0(k).
Details
Permit
202208170694
Permit issued
Aug 17, 2022
Final sign-off
Feb 28, 2023

unit 2: remodeling kitchen and bathroom including replacing cabinets, counter tops, plumbing fixtures, electrical fixtures and tiling. lighting shall comply with cec 150.0(k).

Open the permit page

$32,000
Jun 16, 2022Expired or cancelled
cancelled Jan 2026
235 Montgomery StR.M.R. Construction Company4th fl ste 450: structural details for work proposed under pa# 202203039148.
Details
Permit
202206166499

4th fl ste 450: structural details for work proposed under pa# 202203039148.

Open the permit page

$5,000
Jun 16, 2022Completed
final sign-off Nov 2022
235 Montgomery StR.M.R. Construction Companyto obtain final inspection for work approved under pa# 2018-0702-3503 all work is complete
Details
Permit
202206166482
Permit issued
Jun 16, 2022
Final sign-off
Nov 8, 2022

to obtain final inspection for work approved under pa# 2018-0702-3503 all work is complete

Open the permit page

Jun 2, 2022Completed
final sign-off Oct 2022
243 Montgomery StR.M.R. Construction Companytenant improvement to install (n) sales counter, (n) refrigerated cases, and merchandise displays. install new powered door operator. (e) mech to remain. (e) hvac & electrical systems to remain.
Details
Permit
202206025449
Permit issued
Aug 8, 2022
Final sign-off
Oct 21, 2022

tenant improvement to install (n) sales counter, (n) refrigerated cases, and merchandise displays. install new powered door operator. (e) mech to remain. (e) hvac & electrical systems to remain.

Open the permit page

$40,000
May 16, 2022Completed
final sign-off Jun 2022
235 Montgomery StR.M.R. Construction Companyste 1201: to obtain final inspection for work approved under pa# 201903266209 & 201911217885. all work is complete.
Details
Permit
202205164315
Permit issued
May 16, 2022
Final sign-off
Jun 17, 2022

ste 1201: to obtain final inspection for work approved under pa# 201903266209 & 201911217885. all work is complete.

Open the permit page

May 16, 2022Completed
final sign-off Aug 2022
235 Montgomery StR.M.R. Construction Companyste 935: to obtain final inspection for work approved under pa# 202101213003 & 202002033361. all work is complete.
Details
Permit
202205164313
Permit issued
May 16, 2022
Final sign-off
Aug 23, 2022

ste 935: to obtain final inspection for work approved under pa# 202101213003 & 202002033361. all work is complete.

Open the permit page

May 12, 2022Completed
final sign-off Aug 2022
501 02nd StR.M.R. Construction Companyste 500: creating of huddle room. mep & sprinklers deferred.
Details
Permit
202205124172
Permit issued
May 31, 2022
Final sign-off
Aug 1, 2022

ste 500: creating of huddle room. mep & sprinklers deferred.

Open the permit page

$65,450
Apr 26, 2022Completed
final sign-off Jan 2023
235 Montgomery StR.M.R. Construction Companysuite 450: install low pressure ductwork per plans, install dx piping per plan, install 2 new bsb box, install 2 new condensing units. install new osa fans, 11 new fcu fans. maher n/a. t.i. pa202203039148.
Details
Permit
202204263017
Permit issued
May 3, 2022
Final sign-off
Jan 31, 2023

suite 450: install low pressure ductwork per plans, install dx piping per plan, install 2 new bsb box, install 2 new condensing units. install new osa fans, 11 new fcu fans. maher n/a. t.i. pa202203039148.

Open the permit page

$125,000
Apr 25, 2022Completed
final sign-off Jan 2023
235 Montgomery StR.M.R. Construction Companysuite 450: providing new lighting and branch circuiting to existing panel. providing ca title 24 compliance forms. ref permit 202203039148.
Details
Permit
202204252920
Permit issued
Apr 25, 2022
Final sign-off
Jan 31, 2023

suite 450: providing new lighting and branch circuiting to existing panel. providing ca title 24 compliance forms. ref permit 202203039148.

Open the permit page

$56,000
Apr 21, 2022Completed
final sign-off Apr 2022
220 Montgomery StR.M.R. Construction Companyto obtain final inspection for work approved under pa#201807205061. all work is complete.
Details
Permit
202204212732
Permit issued
Apr 21, 2022
Final sign-off
Apr 27, 2022

to obtain final inspection for work approved under pa#201807205061. all work is complete.

Open the permit page

Apr 21, 2022Completed
final sign-off May 2022
235 Montgomery StR.M.R. Construction Companyto obtain final inspection for work approved under pa# 201801037781. all work is complete.
Details
Permit
202204212735
Permit issued
Apr 21, 2022
Final sign-off
May 17, 2022

to obtain final inspection for work approved under pa# 201801037781. all work is complete.

Open the permit page

Apr 1, 2022Completed
final sign-off Jul 2022
1035 Battery StR.M.R. Construction Companydemo of interior non-structural partitions including wall, doors, millwork, electrical, plumbing, lighting a ceiling. no change of use. retail on g/f to remain.
Details
Permit
202204011393
Permit issued
May 17, 2022
Final sign-off
Jul 25, 2022

demo of interior non-structural partitions including wall, doors, millwork, electrical, plumbing, lighting a ceiling. no change of use. retail on g/f to remain.

Open the permit page

$10,000
Mar 3, 2022Completed
final sign-off Jan 2023
235 Montgomery StR.M.R. Construction Company450: interior t.i. : new non-structural partitions, offices, break area, light fixtures and finishes. mep, fire, life safety, and sprinkler under seperate permit.
Details
Permit
202203039148
Permit issued
Apr 12, 2022
Final sign-off
Jan 31, 2023

450: interior t.i. : new non-structural partitions, offices, break area, light fixtures and finishes. mep, fire, life safety, and sprinkler under seperate permit.

Open the permit page

$814,000
Dec 30, 2021Completed
final sign-off Mar 2022
501 02nd StR.M.R. Construction Companysuite 403: t.i. new full-height partitions, doors, glazing millwork, finishes & associated electrical power/lighting distribution. fire sprinklers & alarm deferred.
Details
Permit
202112305213
Permit issued
Dec 30, 2021
Final sign-off
Mar 29, 2022

suite 403: t.i. new full-height partitions, doors, glazing millwork, finishes & associated electrical power/lighting distribution. fire sprinklers & alarm deferred.

Open the permit page

$32,000
Nov 1, 2021Completed
final sign-off Jun 2024
235 Montgomery StR.M.R. Construction Companydemolition of non-structural partitions and ceiling of the 5th floor to warm shell condition. suite to remain unoccupied until a t.i. permit is filed per ab-017
Details
Permit
202111011552
Permit issued
Nov 1, 2021
Final sign-off
Jun 14, 2024

demolition of non-structural partitions and ceiling of the 5th floor to warm shell condition. suite to remain unoccupied until a t.i. permit is filed per ab-017

Open the permit page

$49,000
Aug 25, 2021Completed
final sign-off Jan 2022
1 California StR.M.R. Construction Company25th fl. interior t.i including new demising walls and renovations to existing restrooms and common corridor, work includes demo and construction of non structural partitions, doors, ceilings, lighting, mech and finishes. no structural.
Details
Permit
202108257080
Permit issued
Sep 15, 2021
Final sign-off
Jan 5, 2022

25th fl. interior t.i including new demising walls and renovations to existing restrooms and common corridor, work includes demo and construction of non structural partitions, doors, ceilings, lighting, mech and finishes. no structural.

Open the permit page

$168,750
Jan 21, 2021Completed
final sign-off Aug 2022
235 Montgomery StR.M.R. Construction Companysuite 1201: title 24 compliance to ref pa201903266209. maher n/a
Details
Permit
202101213007
Permit issued
Jun 25, 2021
Final sign-off
Aug 19, 2022

suite 1201: title 24 compliance to ref pa201903266209. maher n/a

Open the permit page

$18,000
Jan 21, 2021Never finaled
issued Feb 2021, no final
235 Montgomery StR.M.R. Construction Companysuite 935: title 24 compliance to ref pa202002114083. maher n/a
Details
Permit
202101213003
Permit issued
Feb 8, 2021

suite 935: title 24 compliance to ref pa202002114083. maher n/a

Open the permit page

$18,000
Jan 19, 2021Completed
final sign-off Nov 2022
235 Montgomery StR.M.R. Construction Companysuite 420: title 24 compliance to ref pa202002215091. maher n/a
Details
Permit
202101192926
Permit issued
Jun 25, 2021
Final sign-off
Nov 8, 2022

suite 420: title 24 compliance to ref pa202002215091. maher n/a

Open the permit page

$18,000
Dec 8, 2020Completed
final sign-off Dec 2022
215 Eureka StR.M.R. Construction Companyrevision to pa 201810223816 to doc (e) deck at the ground floor level deck existed legally prior to the approval and issuance of pa# 9812512, but was not shown on approved per drawings. legalize(e) stairs layout change shown as "as-built"
Details
Permit
202012080484
Permit issued
Nov 8, 2022
Final sign-off
Dec 2, 2022

revision to pa 201810223816 to doc (e) deck at the ground floor level deck existed legally prior to the approval and issuance of pa# 9812512, but was not shown on approved per drawings. legalize(e) stairs layout change shown as "as-built"

Open the permit page

Nov 9, 2020Completed
final sign-off Dec 2022
215 Eureka StR.M.R. Construction Companycomply with complaint # 202061941. repair 50% or less lower level deck & stairs.
Details
Permit
202011098515
Permit issued
Nov 9, 2020
Final sign-off
Dec 2, 2022

comply with complaint # 202061941. repair 50% or less lower level deck & stairs.

Open the permit page

$2,500
Nov 2, 2020Completed
final sign-off Dec 2021
220 Montgomery StR.M.R. Construction Companyimprovements to comply with accessible business entrance ord 51-16 program. scope of work includes modifying existing ramp, handrails, installation of actuator bars/power door operatators interior suite entry doors & upgrading hardware at exterior suite entry door.
Details
Permit
202011027936
Permit issued
May 4, 2021
Final sign-off
Dec 3, 2021

improvements to comply with accessible business entrance ord 51-16 program. scope of work includes modifying existing ramp, handrails, installation of actuator bars/power door operatators interior suite entry doors & upgrading hardware at exterior suite entry door.

Open the permit page

$37,100
Nov 2, 2020Completed
final sign-off Dec 2021
220 Montgomery StR.M.R. Construction Companyexisting ground floor lobby includes: demolition of (e) ceilings, light fixtures, wall surfaces & finishes, specialty interior glazim & non-compliant common area restroom items. construction of new fixtures & accessable restroom upgrades.
Details
Permit
202011027935
Permit issued
May 14, 2021
Final sign-off
Dec 3, 2021

existing ground floor lobby includes: demolition of (e) ceilings, light fixtures, wall surfaces & finishes, specialty interior glazim & non-compliant common area restroom items. construction of new fixtures & accessable restroom upgrades.

Open the permit page

$1,110,515
Mar 10, 2020Completed
final sign-off Aug 2020
1 California StR.M.R. Construction Companymep for 201912190095
Details
Permit
202003106617
Permit issued
Mar 13, 2020
Final sign-off
Aug 25, 2020

mep for 201912190095

Open the permit page

Mar 3, 2020Never finaled
issued Aug 2020, no final
875 Howard StR.M.R. Construction Companyremove non compliant exterior balconies and access doors. replace doors with in fill concrete wall, new storefront glazing to match existing
Details
Permit
202003035994
Permit issued
Aug 14, 2020

remove non compliant exterior balconies and access doors. replace doors with in fill concrete wall, new storefront glazing to match existing

Open the permit page

$50,000
Mar 3, 2020Completed
final sign-off Nov 2022
235 Montgomery StR.M.R. Construction Companyelectrical work of app#201807023503
Details
Permit
202003035984
Permit issued
Sep 8, 2021
Final sign-off
Nov 8, 2022

electrical work of app#201807023503

Open the permit page

$12,000
Feb 21, 2020Completed
final sign-off Nov 2022
235 Montgomery StR.M.R. Construction Company4th fl, ste 420 - interior ti new non-structural partitions, fixtures & finishes. mep, fire, life safety & sprinkler under separate permit
Details
Permit
202002215096
Permit issued
Mar 12, 2020
Final sign-off
Nov 8, 2022

4th fl, ste 420 - interior ti new non-structural partitions, fixtures & finishes. mep, fire, life safety & sprinkler under separate permit

Open the permit page

$120,000
Feb 11, 2020Completed
final sign-off Apr 2022
235 Montgomery StR.M.R. Construction Companysuite #935: tenant improvedment: new finishes and lighting. mep, fire life safety and sprinkler under separate permit.
Details
Permit
202002114083
Permit issued
Feb 14, 2020
Final sign-off
Apr 28, 2022

suite #935: tenant improvedment: new finishes and lighting. mep, fire life safety and sprinkler under separate permit.

Open the permit page

$190,000
Feb 3, 2020Never finaled
issued Feb 2020, no final
235 Montgomery StR.M.R. Construction Companysuite #935: demolition. removal of non-structural partitions, light fixtures, and finishes. suite to remain unoccupited per ab-17. mep and sprinkler under separate permit.
Details
Permit
202002033361
Permit issued
Feb 6, 2020

suite #935: demolition. removal of non-structural partitions, light fixtures, and finishes. suite to remain unoccupited per ab-17. mep and sprinkler under separate permit.

Open the permit page

$245,000
Jan 27, 2020Completed
final sign-off Jul 2020
501 02nd StR.M.R. Construction Companyti construction of new full height partitions, associated electrical power/lighting distribution, associated mech system, associated life safety
Details
Permit
202001272801
Permit issued
Jan 31, 2020
Final sign-off
Jul 13, 2020

ti construction of new full height partitions, associated electrical power/lighting distribution, associated mech system, associated life safety

Open the permit page

$10,000
Dec 23, 2019Completed
final sign-off Oct 2020
1 California StR.M.R. Construction Company, Bcci Construction Companyunit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.
Details
Permit
201912230407
Permit issued
Jan 7, 2020
Final sign-off
Oct 1, 2020

unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.

Open the permit page

$580,000
Dec 20, 2019Completed
final sign-off Jul 2020
501 02nd StR.M.R. Construction Company2nd flr. base building corridor finishes carpet, paint, ceiling grid and tile, elec, mech, ls deferred maher not req. second floo0r only.
Details
Permit
201912200158
Permit issued
Jan 6, 2020
Final sign-off
Jul 17, 2020

2nd flr. base building corridor finishes carpet, paint, ceiling grid and tile, elec, mech, ls deferred maher not req. second floo0r only.

Open the permit page

$30,000
Dec 19, 2019Completed
final sign-off Aug 2020
1 California StR.M.R. Construction Company22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systems
Details
Permit
201912190095
Permit issued
Jan 28, 2020
Final sign-off
Aug 25, 2020

22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systems

Open the permit page

$450,000
Nov 21, 2019Completed
final sign-off Sep 2020
235 Montgomery StR.M.R. Construction Company#480 title 24 only ref#201904248828
Details
Permit
201911217888
Permit issued
Nov 25, 2019
Final sign-off
Sep 11, 2020

#480 title 24 only ref#201904248828

Open the permit page

Nov 21, 2019Never finaled
issued Nov 2019, no final
235 Montgomery StR.M.R. Construction Companytitle 24 only ref#201903266209
Details
Permit
201911217885
Permit issued
Nov 25, 2019

title 24 only ref#201903266209

Open the permit page

Nov 15, 2019Completed
final sign-off Jun 2020
235 Montgomery StR.M.R. Construction Companydemo ground flr & mezzanine - demo of (e) gyp board partitions, finishes, electrical, lighting, millwork and plumbing. no replacement of plumbing fixtures.
Details
Permit
201911157383
Permit issued
Dec 6, 2019
Final sign-off
Jun 30, 2020

demo ground flr & mezzanine - demo of (e) gyp board partitions, finishes, electrical, lighting, millwork and plumbing. no replacement of plumbing fixtures.

Open the permit page

$46,000
Oct 25, 2019Completed
final sign-off Feb 2020
235 Montgomery StR.M.R. Construction Companyunit 1020 - title 24 lighting ref pa 2018-1218-8628
Details
Permit
201910255587
Permit issued
Oct 25, 2019
Final sign-off
Feb 27, 2020

unit 1020 - title 24 lighting ref pa 2018-1218-8628

Open the permit page

Oct 23, 2019Completed
final sign-off Feb 2020
201 Mission StR.M.R. Construction Company18th fl - project consists of demo of interior partitions, glazing & doors, ceiling & lighting to remain. existing mechanical, electrical & sprinkler system modification is under separate permit
Details
Permit
201910235302
Permit issued
Dec 6, 2019
Final sign-off
Feb 6, 2020

18th fl - project consists of demo of interior partitions, glazing & doors, ceiling & lighting to remain. existing mechanical, electrical & sprinkler system modification is under separate permit

Open the permit page

$30,000
Sep 30, 2019Completed
final sign-off Feb 2020
1 California StR.M.R. Construction Company22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a.
Details
Permit
201909303021
Permit issued
Oct 8, 2019
Final sign-off
Feb 13, 2020

22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a.

Open the permit page

$587,500
Sep 13, 2019Completed
final sign-off Dec 2019
235 Montgomery StR.M.R. Construction Company3rd fl, ste 350 - title 24 ref pa 2019-0617-3556
Details
Permit
201909131584
Permit issued
Sep 27, 2019
Final sign-off
Dec 27, 2019

3rd fl, ste 350 - title 24 ref pa 2019-0617-3556

Open the permit page

Sep 13, 2019Completed
final sign-off Feb 2020
235 Montgomery StR.M.R. Construction Company8th fl, ste 840 - title 24 ref pa 2019-0424-8830
Details
Permit
201909131585
Permit issued
Sep 27, 2019
Final sign-off
Feb 13, 2020

8th fl, ste 840 - title 24 ref pa 2019-0424-8830

Open the permit page

Sep 13, 2019Completed
final sign-off Feb 2020
235 Montgomery StR.M.R. Construction Company6th fl, ste 640 - title 24 ref pa 2019-0111-0140
Details
Permit
201909131586
Permit issued
Dec 18, 2019
Final sign-off
Feb 28, 2020

6th fl, ste 640 - title 24 ref pa 2019-0111-0140

Open the permit page

Sep 13, 2019Completed
final sign-off Feb 2020
235 Montgomery StR.M.R. Construction Company10th fl, ste 1035 - title 24 ref pa 2019-0719-6365
Details
Permit
201909131581
Permit issued
Sep 27, 2019
Final sign-off
Feb 13, 2020

10th fl, ste 1035 - title 24 ref pa 2019-0719-6365

Open the permit page