Gangyi Zhou
- Listed as
- engineer
- Firm
- Studio 02
- Based in
- Lake Forest
- On San Francisco permits
- Sep 2016 to Aug 2026
18 permits since 2000 (engineer on 18 permits): 6 completed, 4 in progress, 7 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 1649 Divisadero St | g/f ti. for new boba tea shop.Details
g/f ti. for new boba tea shop. | $125,000 | |
| Oct 14, 2025 | In progress issued Nov 2025 | 4452 Mission St | Alb Design And Construction | commercial tenant improvement of takeout only ice cream shop with associated mepDetails
commercial tenant improvement of takeout only ice cream shop with associated mep | $125,000 |
| Sep 8, 2025 | In progress issued Sep 2025 | 905 Folsom St | Ddg Construction Corp | revision to 202411265748 to page p1.1 to reflect entrance point of sewer lineDetails
revision to 202411265748 to page p1.1 to reflect entrance point of sewer line | |
| Oct 3, 2024 | Completed final sign-off Oct 2025 | 317 Cortland Av | Vega Construction Company | rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel.Details
rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel. | |
| Nov 28, 2023 | In progress issued Jul 2024 | 159 Fell St | L P Construction | alter site permit to pa 201912200114s. eliminate basement & move utility spaces to the ground fl. eliminate retail space at ground fl & provide one additional residential unit for a total of 25. fell & hickory ground fl street facades revised to show changes in use. no changes to fl 2-7.Details
alter site permit to pa 201912200114s. eliminate basement & move utility spaces to the ground fl. eliminate retail space at ground fl & provide one additional residential unit for a total of 25. fell & hickory ground fl street facades revised to show changes in use. no changes to fl 2-7. | |
| Aug 23, 2023 | Never finaled issued Sep 2023, no final | 3655 Lawton St | C D R Construction | revision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs.Details
revision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs. | |
| May 1, 2023 | Never finaled filed May 2023, never issued | 38 Peralta Av | build out(e) basement which does not meet the required head height in it's current state. basement will be extended into the garden with a (n) terrace above. replacement of deckDetails
build out(e) basement which does not meet the required head height in it's current state. basement will be extended into the garden with a (n) terrace above. replacement of deck | $400,000 | |
| Oct 11, 2022 | Completed final sign-off Mar 2023 | 1930 Fillmore St | Dorian's Works | new non bearing partitions, open skylights to sales area. patch (e) ceiling. install new electrical light fixtures & new flooring. (e) mezzanine & roof area will remain as is.Details
new non bearing partitions, open skylights to sales area. patch (e) ceiling. install new electrical light fixtures & new flooring. (e) mezzanine & roof area will remain as is. | $76,000 |
| Mar 31, 2022 | Never finaled filed Mar 2022, never issued | 1047 Diamond St | renovation of (e) 2 story 2 units multi-family building. remodel upper (1047) unit from 3bed/1bath to 3-bed/2.5-bath. create private usable open space at roof deck. unit to have a private entry at clipper st. exterior bldg dimensions and heights to remain.Details
renovation of (e) 2 story 2 units multi-family building. remodel upper (1047) unit from 3bed/1bath to 3-bed/2.5-bath. create private usable open space at roof deck. unit to have a private entry at clipper st. exterior bldg dimensions and heights to remain. | $200,000 | |
| Mar 31, 2022 | Never finaled filed Mar 2022, never issued | 1045 Diamond St | renovation of (e) 2 story 2 units multi-family building. remodel lower (1045) unit from 1bed/1bath to 2-bed/2-bath. unit to have private entrance. eliminate common entry and circulation. reduce garage space from 2-car to 1-car. bldg exterior dimensions and heights unchanged.Details
renovation of (e) 2 story 2 units multi-family building. remodel lower (1045) unit from 1bed/1bath to 2-bed/2-bath. unit to have private entrance. eliminate common entry and circulation. reduce garage space from 2-car to 1-car. bldg exterior dimensions and heights unchanged. | $300,000 | |
| Dec 23, 2021 | Completed final sign-off Oct 2025 | 317 Cortland Av | interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting.Details
interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting. | $95,000 | |
| Oct 18, 2021 | Never finaled issued Apr 2022, no final | 5801 Mission St | E Conservation Construction, Hybrid City Construction Inc | removal & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight.Details
removal & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight. | $58,000 |
| Jul 27, 2021 | Expired or cancelled cancelled Jan 2026 | 1139 Taraval St | ti for an (e) tea shop. no change of use but to go only w/no customer seating or access to store interior. (n) partitions, (n) kitchen equipment layout, update (e) storeforont layoutDetails
ti for an (e) tea shop. no change of use but to go only w/no customer seating or access to store interior. (n) partitions, (n) kitchen equipment layout, update (e) storeforont layout | $85,000 | |
| Nov 30, 2020 | Completed final sign-off Oct 2022 | 2845 Geary Bl | horizontal addition. remodel & addition to convert an existing restaurant to a cannabis retail dispensary on ground floor. residential unit above stays intact, with an addition of deck to it.Details
horizontal addition. remodel & addition to convert an existing restaurant to a cannabis retail dispensary on ground floor. residential unit above stays intact, with an addition of deck to it. | $400,000 | |
| Dec 27, 2019 | Never finaled issued Jul 2023, no final | 723 Larkin St | Aligned Technologies Llc Dba Aligned Dev | bringing warm shell space to occupy a restaruant n/a maherDetails
bringing warm shell space to occupy a restaruant n/a maher | $100,000 |
| Aug 24, 2018 | Completed final sign-off Sep 2019 | 332 Clement St | Best Forever Construction Company | commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor.Details
commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor. | $120,000 |
| Nov 23, 2016 | Never finaled issued Dec 2016, no final | 220 Montgomery St | Pkc Construction Co. | revision to 201609288956: layout changes, maher naDetails
revision to 201609288956: layout changes, maher na | $20,000 |
| Sep 12, 2016 | Completed final sign-off Nov 2016 | 3251 20th Av | Cogent Construction & Consulting Inc | #239- revision to pa#201608094558, replacing existing water source & heap pump.Details
#239- revision to pa#201608094558, replacing existing water source & heap pump. | $50,000 |