Felipe Antonio Castillo-Torres
- Listed as
- authorized agent-others, contractor
- Firm
- Casman Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2016 to Oct 2026
180 permits since 2000 (contractor on 180 permits, authorized agent-others on 1 permit): 134 completed, 7 in progress, 32 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Nathan C. Simpson (2), Michael Harris, Sergio Mayorga
- Engineers
- Joe Win Kon (3), Sergio Mayorga (2), Robert Patterson
Most recent permits
Showing the 100 most recent of 180.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2026 | In progress filed Oct 2026, not yet issued | 3 Embarcadero Center | Casman Construction Inc | 28th floor: t.i. : new partitions, ceiling, finishes, furniture upgrades to mep. minor structural work. demo work under seperate permit ref #202608186711Details
28th floor: t.i. : new partitions, ceiling, finishes, furniture upgrades to mep. minor structural work. demo work under seperate permit ref #202608186711 | $4,000,000 |
| Sep 17, 2026 | Completed final sign-off Oct 2026 | 638 19th St | Casman Construction Inc | replace kitchen cabinets in kind and countertops. replace angle stops, p-trap and faucet. electrical will stay the same. will change two outlets.Details
replace kitchen cabinets in kind and countertops. replace angle stops, p-trap and faucet. electrical will stay the same. will change two outlets. | $20,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 620 Jones St | Casman Construction Inc | recommencement and completion of work approved under pa# 2018-0315-3786Details
recommencement and completion of work approved under pa# 2018-0315-3786 | |
| Jul 20, 2026 | Completed final sign-off Oct 2026 | 1731 Moraga St | Casman Construction Inc | remodel kitchen in-kind. remodel bathroom in kind. new subpanel.Details
remodel kitchen in-kind. remodel bathroom in kind. new subpanel. | $50,000 |
| Jun 17, 2026 | Completed final sign-off Oct 2026 | 420 14th St | Casman Construction Inc | unit# 1: (e) kitchen relocation. (e) bathroom remodel. conversion of (e) kitchen into (n) office. office not designed or approved for sleeping purposes.Details
unit# 1: (e) kitchen relocation. (e) bathroom remodel. conversion of (e) kitchen into (n) office. office not designed or approved for sleeping purposes. | $65,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 1275 Lombard St | Casman Construction Inc | kitchen remodel in-kind: cabinets, counter tops, appliances. remodel 3 bathrooms in-kind: 3 new shower pans, 1 bathtub, 3 vanities, 3 toilets, shower valves, no lay out changes, no structual changes. new 5/8 drywall type x in bathrooms. not moving walls.Details
kitchen remodel in-kind: cabinets, counter tops, appliances. remodel 3 bathrooms in-kind: 3 new shower pans, 1 bathtub, 3 vanities, 3 toilets, shower valves, no lay out changes, no structual changes. new 5/8 drywall type x in bathrooms. not moving walls. | $250,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 3401 Clay St | Casman Construction Inc | unit #301: (e) kitchen relocation. (e) bathroom remodel. addition of (n) washer and dryer.Details
unit #301: (e) kitchen relocation. (e) bathroom remodel. addition of (n) washer and dryer. | $55,000 |
| Apr 7, 2026 | Completed final sign-off Apr 2026 | 1755 Van Ness Av | Casman Construction Inc | to obtain final inspection for work approved under pa# 201701237639 + 201702089000. all work is complete.Details
to obtain final inspection for work approved under pa# 201701237639 + 201702089000. all work is complete. | |
| Mar 19, 2026 | Completed final sign-off Apr 2026 | 1118 Newhall St | Casman Construction Inc | revision to pa # 202601284687: window removal, close window. remodel kitchen.Details
revision to pa # 202601284687: window removal, close window. remodel kitchen. | $500 |
| Jan 28, 2026 | Completed final sign-off Apr 2026 | 1118 Newhall St | Casman Construction Inc | kitchen remodel in-kind.Details
kitchen remodel in-kind. | $15,000 |
| Nov 19, 2025 | Completed final sign-off May 2026 | 900 Chestnut St | Casman Construction Inc | #310: addition of new bedroom on 4th floor. remodel and relocate of existing kitchen. remodel of existing bathroom.Details
#310: addition of new bedroom on 4th floor. remodel and relocate of existing kitchen. remodel of existing bathroom. | $50,000 |
| Nov 18, 2025 | Completed final sign-off Jan 2026 | 150 Lombard St | Casman Construction Inc | unit #304: replace tile in bathtub area in-kind.Details
unit #304: replace tile in bathtub area in-kind. | $3,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 1807 Jones St | Casman Construction Inc | remodel kitchen in kind- (n) cabinets, countertops, appliances, drywall, paint, circuits, and electrical subpanel. no change to floor layout. no change to wall layout. no structural work. replacement gypboard at kitchen only and to be 5/8" type x w/ 5d cooler nails at 4 o.c or equivalent screws. maiDetails
remodel kitchen in kind- (n) cabinets, countertops, appliances, drywall, paint, circuits, and electrical subpanel. no change to floor layout. no change to wall layout. no structural work. replacement gypboard at kitchen only and to be 5/8" type x w/ 5d cooler nails at 4 o.c or equivalent screws. mai | $35,000 |
| Jul 2, 2025 | Completed final sign-off Dec 2025 | 1869 Stockton St | Casman Construction Inc | unit #3: (e) kitchen & bathroom remodel. (e) laundry room to be relocatedDetails
unit #3: (e) kitchen & bathroom remodel. (e) laundry room to be relocated | $40,000 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 500 Leavenworth St | Casman Construction Inc | unit 205: to comply with nov 202421417. repair (2) broken windows in kind max 0.30 u-factor (street facing), install drywall on fire damaged unit(interior only) and paint. install kitchen cabinets.windows to be wood with true divided lights.Details
unit 205: to comply with nov 202421417. repair (2) broken windows in kind max 0.30 u-factor (street facing), install drywall on fire damaged unit(interior only) and paint. install kitchen cabinets.windows to be wood with true divided lights. | $20,500 |
| May 15, 2025 | Completed final sign-off Jun 2025 | 3500 Market St | Casman Construction Inc | replace sheetrock in garage that was damaged by water. 5/8 dentshield to be installed. to comply with complaint #202293622 item #3Details
replace sheetrock in garage that was damaged by water. 5/8 dentshield to be installed. to comply with complaint #202293622 item #3 | $2,000 |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 2100 Post St | Casman Construction Inc | unit #17 - replace kitchen cabinets. new electrical subpanel. new laundry box. new flooring. new paint. no structural work, like for like.Details
unit #17 - replace kitchen cabinets. new electrical subpanel. new laundry box. new flooring. new paint. no structural work, like for like. | $30,000 |
| Apr 16, 2025 | Completed final sign-off Jan 2026 | 774 09th Av | Casman Construction Inc | unit #2 - install new kitchen cabinets. add washer/dryer in kitchen. new paint, flooring, lights, switches. no structural work. replace (4) windows at rear.Details
unit #2 - install new kitchen cabinets. add washer/dryer in kitchen. new paint, flooring, lights, switches. no structural work. replace (4) windows at rear. | $45,000 |
| Apr 1, 2025 | Completed final sign-off Jul 2025 | 2100 Post St | Casman Construction Inc | comply with nov: 202535625. unit #6: 1)convert existing kitchen to study. 2)relocate kitchen, 3)rehabilitate existing bathroom. 4) install washer and dryer.5. no exterior work visible from the streetDetails
comply with nov: 202535625. unit #6: 1)convert existing kitchen to study. 2)relocate kitchen, 3)rehabilitate existing bathroom. 4) install washer and dryer.5. no exterior work visible from the street | $67,000 |
| Mar 12, 2025 | In progress issued Apr 2025 | 2100 Post St | Casman Construction Inc | unit#: 14 1: rehabilitate existing kitchen, 2: rehabilitate existing bathroom, 3: install washer and dryer.Details
unit#: 14 1: rehabilitate existing kitchen, 2: rehabilitate existing bathroom, 3: install washer and dryer. | $75,000 |
| Feb 11, 2025 | Completed final sign-off Apr 2025 | 1462 20th Av | Casman Construction Inc | rev to pa# 2024-1121-5469: remove all interior finishes, install new insulation and drywall, install new heating unit and ductsDetails
rev to pa# 2024-1121-5469: remove all interior finishes, install new insulation and drywall, install new heating unit and ducts | $25,000 |
| Nov 21, 2024 | Completed final sign-off Apr 2025 | 1462 20th Av | Casman Construction Inc | kitchen and bathroom remodel in kind, no wall demolition or construction, no change in plumbing fixture count, dmj 11/21/2024.Details
kitchen and bathroom remodel in kind, no wall demolition or construction, no change in plumbing fixture count, dmj 11/21/2024. | $48,000 |
| Oct 23, 2024 | Completed final sign-off May 2025 | 150 Lombard St | Casman Construction Inc | unit #304: replace kitchen cabinets in kind. replace bathroom vanity in kind. replace outlets in kind.Details
unit #304: replace kitchen cabinets in kind. replace bathroom vanity in kind. replace outlets in kind. | $30,000 |
| Oct 9, 2024 | Completed final sign-off Oct 2024 | 900 Chestnut St | Casman Construction Inc | unit(s)#204 to obtain final inspection for work approved under pa#201810264312 & pa#201911056469 all work is complete.Details
unit(s)#204 to obtain final inspection for work approved under pa#201810264312 & pa#201911056469 all work is complete. | |
| Oct 9, 2024 | Completed final sign-off Nov 2024 | 900 Chestnut St | Casman Construction Inc | unit#306 to obtain final inspection for work approved under pa#2019-0813-8646 all work is completeDetails
unit#306 to obtain final inspection for work approved under pa#2019-0813-8646 all work is complete | |
| Oct 9, 2024 | Completed final sign-off Nov 2024 | 900 Chestnut St | Casman Construction Inc | unit#506 to obtain final inspection for work approved under pa#2021-0720-4776 all work is completeDetails
unit#506 to obtain final inspection for work approved under pa#2021-0720-4776 all work is complete | |
| Oct 9, 2024 | Completed final sign-off Oct 2024 | 900 Chestnut St | Casman Construction Inc | unit#308 to obtain final inspection for work approved under pa#2019-0613-3377 all work is completeDetails
unit#308 to obtain final inspection for work approved under pa#2019-0613-3377 all work is complete | |
| Oct 9, 2024 | Completed final sign-off Oct 2024 | 900 Chestnut St | Casman Construction Inc | unit#102 to obtain final inspection for work approved under pa#201811145910 all work is completeDetails
unit#102 to obtain final inspection for work approved under pa#201811145910 all work is complete | |
| Oct 9, 2024 | Completed final sign-off Oct 2024 | 900 Chestnut St | Casman Construction Inc | unit#202 to obtain final inspection for work approved under pa#2019-0723-6716 all work is completeDetails
unit#202 to obtain final inspection for work approved under pa#2019-0723-6716 all work is complete | |
| Oct 9, 2024 | Completed final sign-off Nov 2024 | 900 Chestnut St | Casman Construction Inc | unit#210 to obtain final inspection for work approved under pa#2020-0110-1618 all work is completeDetails
unit#210 to obtain final inspection for work approved under pa#2020-0110-1618 all work is complete | |
| Sep 30, 2024 | In progress issued Dec 2024 | 1888 Golden Gate Av | Casman Construction Inc | unit 12 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom; install 2nd bathrom and install washer/dryer.Details
unit 12 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom; install 2nd bathrom and install washer/dryer. | $66,000 |
| Aug 14, 2024 | Completed final sign-off Feb 2025 | 900 Chestnut St | Casman Construction Inc | unit# 504: addition of (n) bedroom. remodel and relocation of (e) kitchen. remodel of (e) bathroom.Details
unit# 504: addition of (n) bedroom. remodel and relocation of (e) kitchen. remodel of (e) bathroom. | $55,000 |
| Jun 26, 2024 | In progress issued Jul 2024 | 474 Sanchez St | Casman Construction Inc | unit a: remodel kitchen and bathroom. upgrade subpanel. install new lvl flooring. no structural workDetails
unit a: remodel kitchen and bathroom. upgrade subpanel. install new lvl flooring. no structural work | $36,000 |
| Jun 26, 2024 | Completed final sign-off Aug 2024 | 2485 Chestnut St | Casman Construction Inc | remodel the kitchen, retile the bathroom wall. new subpanel. new level flooring unit 208 studio. no structural work.Details
remodel the kitchen, retile the bathroom wall. new subpanel. new level flooring unit 208 studio. no structural work. | $25,000 |
| Mar 18, 2024 | Completed final sign-off May 2024 | 2737 Polk St | Casman Construction Inc | unit #6: remodel unit. new electrical, remodel bathroom and kitchen. add washer and dryer. new insulation. refinish floors. install dryer per cmc 504.4.Details
unit #6: remodel unit. new electrical, remodel bathroom and kitchen. add washer and dryer. new insulation. refinish floors. install dryer per cmc 504.4. | $70,000 |
| Feb 16, 2024 | Completed final sign-off Feb 2024 | 3649 21st St | Casman Construction Inc | renewal of permit. to obtain final inspection for work approved under pa#: 200103224971. all work is complete.Details
renewal of permit. to obtain final inspection for work approved under pa#: 200103224971. all work is complete. | |
| Oct 23, 2023 | Completed final sign-off Feb 2024 | 1867 39th Av | Casman Construction Inc | 1 bathroom & 1 kitchen remodel in-kind. new lighting throighout house. replace 2 windows in-kind, street facing. u<=0.30Details
1 bathroom & 1 kitchen remodel in-kind. new lighting throighout house. replace 2 windows in-kind, street facing. u<=0.30 | $15,000 |
| Oct 11, 2023 | Completed final sign-off Feb 2024 | 3649 21st St | Casman Construction Inc | to obtain final inspection for work approved under pa# 2000-0713-5062. all work is complete.Details
to obtain final inspection for work approved under pa# 2000-0713-5062. all work is complete. | |
| Sep 7, 2023 | Completed final sign-off Nov 2023 | 3649 21st St | Casman Construction Inc | repair dryrot in front of house, not to exceed 120 square feetDetails
repair dryrot in front of house, not to exceed 120 square feet | $3,000 |
| Jul 7, 2023 | Completed final sign-off Jul 2023 | 3649 21st St | Casman Construction Inc | reroofing ref to bpa 202307071682Details
reroofing ref to bpa 202307071682 | $2,500 |
| Jul 7, 2023 | Completed final sign-off Dec 2023 | 3649 21st St | Casman Construction Inc | repair dry rot and stucco on back patio( less than 50%): paint exterior: repair / replace plywood on roof as needed. replace 1 countertop in kind- replace outlets and switches in kind-in sink area, one piece only replace 2 facuets. ref to bpa# 202307071682Details
repair dry rot and stucco on back patio( less than 50%): paint exterior: repair / replace plywood on roof as needed. replace 1 countertop in kind- replace outlets and switches in kind-in sink area, one piece only replace 2 facuets. ref to bpa# 202307071682 | $25,000 |
| Feb 24, 2023 | Completed final sign-off Aug 2023 | 900 Chestnut St | Casman Construction Inc | unit 702 - remodel and relocation of (e) kitchen; remodel of (e) bathroom; convert (e) kitchen into (n) bedroom; addition of (n) laundry roomDetails
unit 702 - remodel and relocation of (e) kitchen; remodel of (e) bathroom; convert (e) kitchen into (n) bedroom; addition of (n) laundry room | $55,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2023 | 3010 Buchanan St | Casman Construction Inc | unit #12: replace kitchen cabinets, install lvl flooring, retile bathroom walls and floor. full interior paint job.Details
unit #12: replace kitchen cabinets, install lvl flooring, retile bathroom walls and floor. full interior paint job. | $25,000 |
| Dec 9, 2022 | Completed final sign-off Jan 2023 | 1735 43rd Av | Casman Construction Inc | one remodel bathroom in kindDetails
one remodel bathroom in kind | $15,000 |
| Dec 1, 2022 | Never finaled issued Dec 2022, no final | 2228 Union St | Casman Construction Inc | unit #112: replace kitchen cabinets, paint and install new flooring in entire unit. new countertop & new fixtures.Details
unit #112: replace kitchen cabinets, paint and install new flooring in entire unit. new countertop & new fixtures. | $10,000 |
| Aug 15, 2022 | Completed final sign-off Apr 2023 | 967 Le Conte Av | Casman Construction Inc | kitchen remodel in kind. no removal of wallsDetails
kitchen remodel in kind. no removal of walls | $15,000 |
| Jul 28, 2022 | Never finaled issued Jul 2022, no final | 2635 Mcallister St | Casman Construction Inc | install insulation and new sheetrock. rewire one entire unit. install all new led lighting.Details
install insulation and new sheetrock. rewire one entire unit. install all new led lighting. | $30,000 |
| Jul 22, 2022 | Completed final sign-off Jun 2023 | 329 Connecticut St | Casman Construction Inc | remodel kitchen in-kind.Details
remodel kitchen in-kind. | $18,000 |
| Apr 14, 2022 | Completed final sign-off Jul 2022 | 114 Beaumont Av | Casman Construction Inc | remodel of (1) kitchen in kind.Details
remodel of (1) kitchen in kind. | $20,000 |
| Apr 4, 2022 | Completed final sign-off Jun 2022 | 2300 22nd Av | Casman Construction Inc | unit 6: remodel kitchen and bathroom. add new subpanel. new appliances, new countertops, kitchen cabinets, paint and same floors.Details
unit 6: remodel kitchen and bathroom. add new subpanel. new appliances, new countertops, kitchen cabinets, paint and same floors. | $30,000 |
| Dec 10, 2021 | Expired or cancelled suspend Feb 2022 | 5285 Diamond Heights Bl | Casman Construction Inc | replace 128 aluminum sliding windows in kind. replace 30 aluminum patio doors in kind.Details
replace 128 aluminum sliding windows in kind. replace 30 aluminum patio doors in kind. | $200,000 |
| Dec 9, 2021 | Never finaled issued Dec 2021, no final | 5235 Diamond Heights Bl | Casman Construction Inc | spot replace damaged siding as needed approx 6,000 sq ft. cedar shingles to be used (street facing)Details
spot replace damaged siding as needed approx 6,000 sq ft. cedar shingles to be used (street facing) | $6,000 |
| Nov 19, 2021 | Completed final sign-off Sep 2023 | 2619 Mission St | Casman Construction Inc | demo (e) restroom & build (n) accessible single occupancy restroom within (e)retail space.Details
demo (e) restroom & build (n) accessible single occupancy restroom within (e)retail space. | $20,000 |
| Nov 16, 2021 | Completed final sign-off Jun 2022 | 900 Chestnut St | Casman Construction Inc | unit 610 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroomDetails
unit 610 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroom | $50,000 |
| Oct 20, 2021 | Completed final sign-off Jan 2022 | 525 Hyde St | Casman Construction Inc | unit 15: kitchen cabinets, add a subpanel inside unit. retile bathroom floors. new toilet, sink and paint.Details
unit 15: kitchen cabinets, add a subpanel inside unit. retile bathroom floors. new toilet, sink and paint. | $25,000 |
| Oct 4, 2021 | Never finaled issued Oct 2021, no final | 5285 Diamond Heights Bl | Casman Construction Inc | spot replace damaged siing as needed.Details
spot replace damaged siing as needed. | $15,000 |
| Aug 19, 2021 | Completed final sign-off Mar 2022 | 605 Jones St | Casman Construction Inc | build out (n) ada restroom. add (n) power assisted door operator and reconfigure rise/run of (e) ground level stairs. mep deferred.Details
build out (n) ada restroom. add (n) power assisted door operator and reconfigure rise/run of (e) ground level stairs. mep deferred. | $20,000 |
| Jul 26, 2021 | Never finaled issued Jul 2021, no final | 3010 Buchanan St | Casman Construction Inc | unit 3: administrative permit: change unit number to unit 3 for permit # 202010277473.Details
unit 3: administrative permit: change unit number to unit 3 for permit # 202010277473. | |
| Jul 20, 2021 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | Casman Construction Inc | unit 506 - addition of (n) bedroom; remodel of (e) kitchen and bathroom.Details
unit 506 - addition of (n) bedroom; remodel of (e) kitchen and bathroom. | $45,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 777 Haight St | Casman Construction Inc | unit #1: remodel kitchen and bathroom. new electrical subpanel. new led lighting. no structural workDetails
unit #1: remodel kitchen and bathroom. new electrical subpanel. new led lighting. no structural work | $30,000 |
| Apr 19, 2021 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | Casman Construction Inc | #502: addition of new bedroom, remodel of extg kitchen, remodel of extg bathroom.Details
#502: addition of new bedroom, remodel of extg kitchen, remodel of extg bathroom. | $45,000 |
| Apr 16, 2021 | Completed final sign-off Oct 2024 | 900 Chestnut St | Casman Construction Inc | #302 -addition of new office, remodel of extg kitchen and remodel of extg bathroom.Details
#302 -addition of new office, remodel of extg kitchen and remodel of extg bathroom. | $45,000 |
| Apr 8, 2021 | Completed final sign-off Jun 2021 | 2575 Washington St | Casman Construction Inc | unit 5: replace kitchen cabinets, new tile, countertop, new appliances, new tub, valve, toilet,sink. new subpanel. paintDetails
unit 5: replace kitchen cabinets, new tile, countertop, new appliances, new tub, valve, toilet,sink. new subpanel. paint | $25,000 |
| Apr 8, 2021 | Completed final sign-off Jun 2021 | 2300 22nd Av | Casman Construction Inc | unit 5: kitchen & bath remodel. new cabinets, appliances, counters. new tile, new sink, new toilet. add a subpanel to unit. paintDetails
unit 5: kitchen & bath remodel. new cabinets, appliances, counters. new tile, new sink, new toilet. add a subpanel to unit. paint | $25,000 |
| Mar 17, 2021 | Never finaled issued Mar 2021, no final | 457 Lombard St | Casman Construction Inc | remodel kitchen in kind,upgrade electrial in kitchen & two baths.remodel two bathroom in kind.no change to layout of walls & openingsDetails
remodel kitchen in kind,upgrade electrial in kitchen & two baths.remodel two bathroom in kind.no change to layout of walls & openings | $20,000 |
| Mar 17, 2021 | Never finaled issued Mar 2021, no final | 459 Lombard St | Casman Construction Inc | add dish washer in kitchen(no kitchen remodeling),upgrade electrical for the unit. replace back door & repair back stairs (less than 50%)Details
add dish washer in kitchen(no kitchen remodeling),upgrade electrical for the unit. replace back door & repair back stairs (less than 50%) | $15,000 |
| Feb 9, 2021 | Completed final sign-off Feb 2021 | 2056 Vallejo St | Casman Construction Inc | rear deck repair. replace rotted two posts and rim joist (other joist stay) with p.t. wood. less than 50% deck. comply with nov 202172359.Details
rear deck repair. replace rotted two posts and rim joist (other joist stay) with p.t. wood. less than 50% deck. comply with nov 202172359. | $3,000 |
| Nov 16, 2020 | Completed final sign-off Aug 2021 | 1837 Oak St | Casman Construction Inc | revision to app#201711295016. relocate the boilerDetails
revision to app#201711295016. relocate the boiler | $10,000 |
| Oct 27, 2020 | Never finaled issued Oct 2020, no final | 3010 Buchanan St | Casman Construction Inc | unit #5: paint and refinish hardwood floors, new kitchen cabinets and new tile in bathroom, (e) fixtures to remainDetails
unit #5: paint and refinish hardwood floors, new kitchen cabinets and new tile in bathroom, (e) fixtures to remain | $20,000 |
| Aug 28, 2020 | Completed final sign-off Apr 2021 | 900 Chestnut St | Casman Construction Inc | unit 602: addition of new bedroom, remodel (e) kitchen, remodel (e) bathroomDetails
unit 602: addition of new bedroom, remodel (e) kitchen, remodel (e) bathroom | $40,000 |
| Jun 30, 2020 | Completed final sign-off Jul 2020 | 3010 Buchanan St | Casman Construction Inc | unit #4:remodel kitchen & bath. add lights to ceiling, paint and refinishing floors,new lights and outlets. all remodel in-kindDetails
unit #4:remodel kitchen & bath. add lights to ceiling, paint and refinishing floors,new lights and outlets. all remodel in-kind | $30,000 |
| Feb 21, 2020 | Completed final sign-off Feb 2022 | 1370 Chestnut St | Casman Construction Inc | existing kitchen & bathroom remodelDetails
existing kitchen & bathroom remodel | $30,000 |
| Feb 10, 2020 | Completed final sign-off Jul 2021 | 2955 Van Ness Av | Casman Construction Inc | apt 11: convert e kitchen to study, convert e living rm to bedroom, relocate kitchen and living rm, rehabilitate e bath, install washer dryerDetails
apt 11: convert e kitchen to study, convert e living rm to bedroom, relocate kitchen and living rm, rehabilitate e bath, install washer dryer | $40,000 |
| Feb 4, 2020 | Completed final sign-off May 2020 | 1960 Fulton St | Casman Construction Inc | unit 3: remodel kitchen, retile bathroom. paint. no structural work. new kitchen cabinets, tile, countertops. faucet & sink. 8 x 7 kitchenDetails
unit 3: remodel kitchen, retile bathroom. paint. no structural work. new kitchen cabinets, tile, countertops. faucet & sink. 8 x 7 kitchen | $20,000 |
| Jan 10, 2020 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | Casman Construction Inc | apt 210: addition of new bedroom, remodel and relocation of e kitchen, remodel of e bathDetails
apt 210: addition of new bedroom, remodel and relocation of e kitchen, remodel of e bath | $45,000 |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 1960 Fulton St | Casman Construction Inc | unit 8: 5x8 bath and 48 sqft kitchen remodel. electrical panel upgrade. no structural changes. add washer dryer. new tile, sink, toilet & shower. kitchen new cabinet, counterDetails
unit 8: 5x8 bath and 48 sqft kitchen remodel. electrical panel upgrade. no structural changes. add washer dryer. new tile, sink, toilet & shower. kitchen new cabinet, counter | $30,000 |
| Dec 12, 2019 | Never finaled issued Feb 2020, no final | 2079 Market St | Casman Construction Inc | unit #3: rehabilitate existing kitchen. rehabilatate existing bathroom. install washer/dryerDetails
unit #3: rehabilitate existing kitchen. rehabilatate existing bathroom. install washer/dryer | $33,000 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 2079 Market St | Casman Construction Inc | unit 27: remodel one kitchen and one bathroom in kind. add under cabinet, washer and dryer in kitchen. "ventless dryer, electric, connect to drain.Details
unit 27: remodel one kitchen and one bathroom in kind. add under cabinet, washer and dryer in kitchen. "ventless dryer, electric, connect to drain. | $15,000 |
| Nov 19, 2019 | Completed final sign-off Jun 2020 | 900 Chestnut St | Casman Construction Inc | unit #706 :addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundryDetails
unit #706 :addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundry | $45,000 |
| Nov 19, 2019 | Completed final sign-off Jun 2022 | 900 Chestnut St | Casman Construction Inc | unti #412: addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundry roomDetails
unti #412: addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundry room | $45,000 |
| Nov 7, 2019 | Completed final sign-off Jun 2020 | 1755 Van Ness Av | Casman Construction Inc | #202: addition of (n) bedroom, remodel & relocation of (e) kitchen. remodel of (e) bathroom.Details
#202: addition of (n) bedroom, remodel & relocation of (e) kitchen. remodel of (e) bathroom. | $45,000 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 2079 Market St | Casman Construction Inc | unit 29: remodel kitchen in-kind, bathroom in-kind, upgrade electric panel, install undercup ventless washer/dryer. all new lights to be ledDetails
unit 29: remodel kitchen in-kind, bathroom in-kind, upgrade electric panel, install undercup ventless washer/dryer. all new lights to be led | $25,000 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 900 Chestnut St | Casman Construction Inc | unit #102: convert bedroom into home office. convert 2 bedroom apartment into 1 bedroom apartment. revision to pa# 2018-1114-5910Details
unit #102: convert bedroom into home office. convert 2 bedroom apartment into 1 bedroom apartment. revision to pa# 2018-1114-5910 | $500 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 900 Chestnut St | Casman Construction Inc | unit #204: convert bedroom into home office. convert bedroom into home office, convert 2 bedroom apt to 1 bedroom apartment. revision to pa# 2018-1026-4312Details
unit #204: convert bedroom into home office. convert bedroom into home office, convert 2 bedroom apt to 1 bedroom apartment. revision to pa# 2018-1026-4312 | $500 |
| Oct 4, 2019 | Completed final sign-off Jun 2020 | 2079 Market St | Casman Construction Inc | remodel kitchen in kind. 100 sf, remodel bathroom in kind, 50 sf. install under cab washer.Details
remodel kitchen in kind. 100 sf, remodel bathroom in kind, 50 sf. install under cab washer. | $18,000 |
| Aug 15, 2019 | Completed final sign-off Dec 2019 | 2079 Market St | Casman Construction Inc | #9: remodel kitchen & (1) bathroom in kind. add washer & dryer under countertop in kitchen. no structural work to be done.Details
#9: remodel kitchen & (1) bathroom in kind. add washer & dryer under countertop in kitchen. no structural work to be done. | $15,000 |
| Aug 13, 2019 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | Casman Construction Inc | unit 306 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroomDetails
unit 306 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroom | $65,000 |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 900 Chestnut St | Casman Construction Inc | unit # 402: addition of (n) office. remodel and relocation of (e) kitchen. remodel of (e) bathroom//must comply with 1103.7.6.1- fire alarm complianceDetails
unit # 402: addition of (n) office. remodel and relocation of (e) kitchen. remodel of (e) bathroom//must comply with 1103.7.6.1- fire alarm compliance | $65,000 |
| Aug 6, 2019 | Completed final sign-off Dec 2019 | 2079 Market St | Casman Construction Inc | unit 2: remodel kitchen in kind. remodel bathroom in kind. add washer/dryer under countertop in kitchen. add electrical subpanel. no structural work to be done.Details
unit 2: remodel kitchen in kind. remodel bathroom in kind. add washer/dryer under countertop in kitchen. add electrical subpanel. no structural work to be done. | $18,000 |
| Jul 23, 2019 | Never finaled issued Aug 2019, no final | 900 Chestnut St | Casman Construction Inc | unit 202. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroomDetails
unit 202. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroom | $45,000 |
| Jul 11, 2019 | Completed final sign-off Nov 2019 | 676 Geary St | Casman Construction Inc | unit #309: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maherDetails
unit #309: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maher | $32,000 |
| Jun 17, 2019 | Completed final sign-off Apr 2021 | 900 Chestnut St | Casman Construction Inc | #104: addition of new office. remodel and relocation of extg kitchen. remodel of extg bathroom. addition of new washer and dryer. remove (e) fire place and flue pipes n/a for maherDetails
#104: addition of new office. remodel and relocation of extg kitchen. remodel of extg bathroom. addition of new washer and dryer. remove (e) fire place and flue pipes n/a for maher | $45,000 |
| Jun 13, 2019 | Never finaled issued Jul 2019, no final | 900 Chestnut St | Casman Construction Inc | unit 308. addition of (n) bedroom, remodel and relocate (e) kitchen, add (n) laundry, remodel (e) bathroom, remove (e) fireplaceDetails
unit 308. addition of (n) bedroom, remodel and relocate (e) kitchen, add (n) laundry, remodel (e) bathroom, remove (e) fireplace | $45,000 |
| May 30, 2019 | Never finaled issued Jun 2019, no final | 525 Hyde St | Casman Construction Inc | unit #12 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size.Details
unit #12 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size. | $25,000 |
| May 30, 2019 | Never finaled issued Jun 2019, no final | 525 Hyde St | Casman Construction Inc | unit #11 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size. add washer and dryer in unitDetails
unit #11 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size. add washer and dryer in unit | $25,000 |
| May 24, 2019 | Completed final sign-off Apr 2021 | 1430 Sacramento St | Casman Construction Inc | unit 5. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroom.Details
unit 5. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroom. | $45,000 |
| May 21, 2019 | Completed final sign-off Apr 2021 | 900 Chestnut St | Casman Construction Inc | unit #510; addition of (n) bedroom, remodel and relocation of (e) kitchen, remodel of (e) bathroom n/a maherDetails
unit #510; addition of (n) bedroom, remodel and relocation of (e) kitchen, remodel of (e) bathroom n/a maher | $45,000 |
| May 20, 2019 | Completed final sign-off Jun 2019 | 1020 Post St | Casman Construction Inc | unit # 407: rehabilitate existing bathroom and kitchen. no change of existing floor plans. no structural work.Details
unit # 407: rehabilitate existing bathroom and kitchen. no change of existing floor plans. no structural work. | $24,000 |
| Mar 15, 2019 | Completed final sign-off Feb 2020 | 1133 Kearny St | Casman Construction Inc | voluntary soft story retrofitDetails
voluntary soft story retrofit | $30,000 |
| Mar 5, 2019 | Completed final sign-off Aug 2019 | 320 Turk St | Casman Construction Inc | unit 103: convert existing kitchen to bedroom, relocate kitchen, rehabitate existing bathroomDetails
unit 103: convert existing kitchen to bedroom, relocate kitchen, rehabitate existing bathroom | $36,000 |