Jefferson Chen
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Enertia Designs
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Oct 2026
601 permits since 2000 (engineer on 532 permits, architect on 61 permits, designer on 8 permits, authorized agent-others on 2 permits): 406 completed, 77 in progress, 51 never finaled, 67 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 601.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress issued Sep 2026 | 427 Precita Av | Cbs Construction Inc. | exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174Details
exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174 | $8,000 |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1446 Florida St | Gama Construction Inc | revision to 202310048007 and planning prj 2024-011309. install dormers at north and south roof. increase roof height at rear family room. install new interior stair from 1st to 3rd fl. 2 new full baths at 3rd fl. new rear deck. storage converted to living space and 1 new bath. install 1 exteriorDetails
revision to 202310048007 and planning prj 2024-011309. install dormers at north and south roof. increase roof height at rear family room. install new interior stair from 1st to 3rd fl. 2 new full baths at 3rd fl. new rear deck. storage converted to living space and 1 new bath. install 1 exterior | $110,000 |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 845 Vermont St | revision to pa# 2022-0308-9445: work at facade only. infill below over hang at facade, create new sliding glass door, and french balcony. change siding and windows at facade (not in kind).Details
revision to pa# 2022-0308-9445: work at facade only. infill below over hang at facade, create new sliding glass door, and french balcony. change siding and windows at facade (not in kind). | $15,000 | |
| Sep 23, 2026 | In progress issued Sep 2026 | 720 Central Av | deck repair in kind replacement of wood railings and supports. in kind replacement of 2 concrete support posts.Details
deck repair in kind replacement of wood railings and supports. in kind replacement of 2 concrete support posts. | $6,680 | |
| Sep 18, 2026 | In progress issued Sep 2026 | 1030 Sanchez St | D3 Construction | revision to approved pa 202512051067 vault @ living/dining space; window revision @ living room not visible from streetDetails
revision to approved pa 202512051067 vault @ living/dining space; window revision @ living room not visible from street | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 2814 Clay St | add roof deck and new open exterior stair from level 3 to roof.Details
add roof deck and new open exterior stair from level 3 to roof. | $49,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1127 Hampshire St | D3 Construction | excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard.Details
excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard. | $450,000 |
| Aug 25, 2026 | Completed final sign-off Aug 2026 | 3670 24th St | 3rd fl unit 3670 legalize existing structural alteration consisting of prior reomval of two interior wood posts between family room and kitchen installation of an existing 3 1/2" x 11 1/4: parallam psl beam. see structural drawings and calculationsDetails
3rd fl unit 3670 legalize existing structural alteration consisting of prior reomval of two interior wood posts between family room and kitchen installation of an existing 3 1/2" x 11 1/4: parallam psl beam. see structural drawings and calculations | ||
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 211 Douglass St | alteration of a sfd residence, infill south facing light court at 1st floor. partially infill at 2nd floor, add skylight, remodel kitchen, revise garage door and entry gate at 1st floor.Details
alteration of a sfd residence, infill south facing light court at 1st floor. partially infill at 2nd floor, add skylight, remodel kitchen, revise garage door and entry gate at 1st floor. | $131,694 | |
| Jul 28, 2026 | Expired or cancelled withdrawn Aug 2026 | 830 41st Av | (n) 2nd fl. deck to access backyard, 2nd fl. bedroom french doors accesing deck, 1st fl. replace bedroom window to move / replace hobby space window, bring 1st fl. shower+ vanity to code, replace counters, shelving with cabinets and replace utility sink.Details
(n) 2nd fl. deck to access backyard, 2nd fl. bedroom french doors accesing deck, 1st fl. replace bedroom window to move / replace hobby space window, bring 1st fl. shower+ vanity to code, replace counters, shelving with cabinets and replace utility sink. | $75,000 | |
| Jul 19, 2026 | In progress filed Jul 2026, not yet issued | 1 Mizpah St | remodel and 3/f addition including 2 bedrooms and 1 bathroom. upgrade foundation. remodel 1/f to include family room and laundry. upgrade electrical system and 200a main panel.Details
remodel and 3/f addition including 2 bedrooms and 1 bathroom. upgrade foundation. remodel 1/f to include family room and laundry. upgrade electrical system and 200a main panel. | $400,000 | |
| Jul 16, 2026 | Completed final sign-off Oct 2026 | 628 Shotwell St | garage/first floor: enlarge garage door from 7'-8" to 8'-6". add rear deck at 3'-0" high max.Details
garage/first floor: enlarge garage door from 7'-8" to 8'-6". add rear deck at 3'-0" high max. | $2,000 | |
| Jul 14, 2026 | In progress issued Aug 2026 | 4370 Cesar Chavez St | D3 Construction | reference to complaint 202654497: rear yard fence tall than 6' regrading of back yard per allowed 30" and 36" vertical sectionsDetails
reference to complaint 202654497: rear yard fence tall than 6' regrading of back yard per allowed 30" and 36" vertical sections | $20,000 |
| Jun 22, 2026 | In progress filed Jun 2026, not yet issued | 4564 19th St | selective renovation @ all flrs: (n) kitchen cabinetry @ flr 2. enlarge (1) bedroom & replace (1) bathtub w/ (n) shower @ flr 1. (n) wine storage & cabs @ basement. all (n) interior finishes & associated electrical & plumbing all flrs.Details
selective renovation @ all flrs: (n) kitchen cabinetry @ flr 2. enlarge (1) bedroom & replace (1) bathtub w/ (n) shower @ flr 1. (n) wine storage & cabs @ basement. all (n) interior finishes & associated electrical & plumbing all flrs. | $68,000 | |
| Jun 17, 2026 | In progress issued Jul 2026 | 830 Cortland Av | Strong Builders Construction Inc. | revision to 202510026606. scope includes additional foundtaion grade beam at rear of building. requested voluntarily by client. replacement of wood frames floor with a concrete slab in addition on the west side. replace (e) door at north side entrance. add (n) window facing street and mep changes.Details
revision to 202510026606. scope includes additional foundtaion grade beam at rear of building. requested voluntarily by client. replacement of wood frames floor with a concrete slab in addition on the west side. replace (e) door at north side entrance. add (n) window facing street and mep changes. | |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 624 Parnassus Av | create new adu within existing legal habitable space on existing first floor of existing single family home. adu per state program 207.2Details
create new adu within existing legal habitable space on existing first floor of existing single family home. adu per state program 207.2 | $58,000 | |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 224 29th St | Yefa Construction Inc | rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls.Details
rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls. | |
| May 12, 2026 | Completed final sign-off Sep 2026 | 556 Waller St | Michael Paul Murray | rear yard new deck and stairs.Details
rear yard new deck and stairs. | $20,000 |
| May 12, 2026 | In progress issued Sep 2026 | 427 Precita Av | Cbs Construction Inc. | Details
| $105,000 |
| May 7, 2026 | In progress filed May 2026, not yet issued | 674 Oak St | conversion of unconditioned space & a portion of unit # 2 @ 1st floor level to a new adu. reconfiguration of 2nd floor stair area within unit# 2 and reconfiguration of openings @ east wall of 1st floor. adu will be added under the state adu program.Details
conversion of unconditioned space & a portion of unit # 2 @ 1st floor level to a new adu. reconfiguration of 2nd floor stair area within unit# 2 and reconfiguration of openings @ east wall of 1st floor. adu will be added under the state adu program. | $75,000 | |
| Apr 20, 2026 | Completed final sign-off Jul 2026 | 164 28th St | Arcon Construction Corp | first floor voluntary foundation upgradeDetails
first floor voluntary foundation upgrade | $3,000 |
| Apr 10, 2026 | Completed final sign-off Sep 2026 | 758 Great Hy | Jose Martinez | unit 1: revision to bpa 202601284734: 2nd floor: remodel (e) kitchen, remove kitchen walls, closet and fire place.Details
unit 1: revision to bpa 202601284734: 2nd floor: remodel (e) kitchen, remove kitchen walls, closet and fire place. | $16,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 180 Palo Alto Av | Force Development Company Inc | interior renovations to reconfigure interior stair, new kitchen island, new electric fireplace, new gas line at courtyard, and associated electrical. no plumbing fixtures at extended kitchen.Details
interior renovations to reconfigure interior stair, new kitchen island, new electric fireplace, new gas line at courtyard, and associated electrical. no plumbing fixtures at extended kitchen. | $28,000 |
| Mar 18, 2026 | In progress issued May 2026 | 77 Norwich St | Bay Cities General Contractor Inc | first floor/ground floor: adding new living space + rear stairs. second floor: portion of wall at front bedroom to be removed. (n) elec + plumbing as req'd at area of work only.Details
first floor/ground floor: adding new living space + rear stairs. second floor: portion of wall at front bedroom to be removed. (n) elec + plumbing as req'd at area of work only. | $165,000 |
| Mar 5, 2026 | In progress filed Mar 2026, not yet issued | 72 Townsend St | revision to pa #202410082497. clarification of ceiling beam of roof framing plan. existing work with no stuctural update.Details
revision to pa #202410082497. clarification of ceiling beam of roof framing plan. existing work with no stuctural update. | $1,000 | |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 200 Duboce Av | convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior designDetails
convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior design | $1,800,000 | |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 161 09th Av | add 2 adus @ unoccupied 1st flr storage & garage area under local planning code section 207.1 includes voluntary seismic upgrade. (e) garge door removed. renovation of the 2 (e) units @ 2nd & 3rd floors. renovation of the kitchen & addition of 1 (n)bedrm. & bath rm @ each unit.Details
add 2 adus @ unoccupied 1st flr storage & garage area under local planning code section 207.1 includes voluntary seismic upgrade. (e) garge door removed. renovation of the 2 (e) units @ 2nd & 3rd floors. renovation of the kitchen & addition of 1 (n)bedrm. & bath rm @ each unit. | $475,000 | |
| Jan 15, 2026 | In progress issued Mar 2026 | 1358 South Van Ness Av | Bradford Construction | bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all...Details
bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all... | $772,404 |
| Jan 14, 2026 | In progress issued Mar 2026 | 61 Cypress St | Bradford Construction | bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage...Details
bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage... | $171,136 |
| Dec 23, 2025 | In progress issued Jun 2026 | 1030 Sanchez St | D3 Construction | 2-story rear horizontal addition and reconfigured rear deck and stairs full interior renovations at existing floors 01, 02. new interior stairs.xcavation of approximately 71 cu.yd.existing front street facade to remain, no work.Details
2-story rear horizontal addition and reconfigured rear deck and stairs full interior renovations at existing floors 01, 02. new interior stairs.xcavation of approximately 71 cu.yd.existing front street facade to remain, no work. | $488,000 |
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 3516 Clay St | horizontal addition of (e) building footprint, includes full remodel associated in scope of work.Details
horizontal addition of (e) building footprint, includes full remodel associated in scope of work. | $1,900,000 | |
| Dec 18, 2025 | Completed final sign-off Jul 2026 | 1443 Hudson Av | Connor Daly Corporation | ground lvel foundation replacement for existing storage space in the rear of building. lower new slab approx. 4 inches.Details
ground lvel foundation replacement for existing storage space in the rear of building. lower new slab approx. 4 inches. | $34,000 |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 754 22nd Av | D3 Construction | first floor/ground floor voluntary structural strengtheningDetails
first floor/ground floor voluntary structural strengthening | $2,000 |
| Dec 10, 2025 | In progress issued Jan 2026 | 427 Precita Av | Cbs Construction Inc. | exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house.Details
exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house. | $435,000 |
| Oct 20, 2025 | In progress issued May 2026 | 830 Cortland Av | Strong Builders Construction Inc. | ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout.Details
ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout. | $180,000 |
| Oct 16, 2025 | In progress issued Aug 2026 | 548 07th Av | D3 Construction | 1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight.Details
1/f: rear horizontal addition,convert (e) storage into full bath/bed; excavate 12in. 2/f: hztl addition:new family room, dining room, office; (e) kitchen remodel, new staircase.2/f: hztl add, new prime bed, 2 new baths, walk-in closet, new laundry & skylight. | $250,000 |
| Oct 14, 2025 | In progress issued Feb 2026 | 2448 Greenwich St | K. Brunner & Associates | rear building. remodel interior of unit including 2 bathrooms and 2 bedrooms. install new tankless water heater and electric mini split heating. new insulation throughout. construct new interior stair and remove spiral stair. new window units at selected locations.Details
rear building. remodel interior of unit including 2 bathrooms and 2 bedrooms. install new tankless water heater and electric mini split heating. new insulation throughout. construct new interior stair and remove spiral stair. new window units at selected locations. | $100,000 |
| Oct 6, 2025 | Completed final sign-off Feb 2026 | 4117 Cesar Chavez St | E. N. A Construction Inc. | rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath.Details
rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath. | $1,000 |
| Oct 1, 2025 | Completed final sign-off Apr 2026 | 70 Bradford St | David M Goray | partial remodel to single family home to include kitchen and bathroomDetails
partial remodel to single family home to include kitchen and bathroom | $125,000 |
| Sep 3, 2025 | In progress issued Jan 2026 | 33 Retiro Wy | J Farley Construction | revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door.Details
revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door. | |
| Aug 20, 2025 | Completed final sign-off Jul 2026 | 1871 25th Av | Velox Construction Inc/Velox Des & Const | revision to pa# 202507090461: 1/f-addition of (n) family room and (n) bathroom. 2/f-remodel (e) kitchen and (e) bathroom. 3/f-remodel (e) bathroom.Details
revision to pa# 202507090461: 1/f-addition of (n) family room and (n) bathroom. 2/f-remodel (e) kitchen and (e) bathroom. 3/f-remodel (e) bathroom. | $130,000 |
| Aug 6, 2025 | Completed final sign-off Aug 2025 | 14 Farview Ct | Eternity Home Builders Inc | revision 202403057152- to convert (e) 2 windows into (n) french door at rear of propertyDetails
revision 202403057152- to convert (e) 2 windows into (n) french door at rear of property | |
| Jul 30, 2025 | In progress issued Aug 2025 | 3929 17th St | Affordable Construction | renovation of existing kitchen and renovation of powder room. replace kitchen window sand door to roof deckDetails
renovation of existing kitchen and renovation of powder room. replace kitchen window sand door to roof deck | $75,000 |
| Jul 28, 2025 | Completed final sign-off Feb 2026 | 284 32nd Av | Lowry Construction Inc | revision to pa#202407233080: 1st flr - new mud room, mech room. 2nd flr - move kitchen wall, new gas fireplace location. 3rd flr - new gas fireplace, move door at primery bedroom, relocate (e) bathroom door.Details
revision to pa#202407233080: 1st flr - new mud room, mech room. 2nd flr - move kitchen wall, new gas fireplace location. 3rd flr - new gas fireplace, move door at primery bedroom, relocate (e) bathroom door. | $20,000 |
| Jun 20, 2025 | In progress issued Mar 2026 | 3628 16th St | Mc Gowan Builders | construct an elevator, construct new foundation for elevator and for the entrance next to proposed new elevator. remove (e) chimneyDetails
construct an elevator, construct new foundation for elevator and for the entrance next to proposed new elevator. remove (e) chimney | $20,000 |
| Jun 12, 2025 | Completed final sign-off Jul 2025 | 246 Chenery St | D3 Construction | roof repair to level e lower roof to e roofDetails
roof repair to level e lower roof to e roof | $5,000 |
| May 13, 2025 | In progress issued Sep 2026 | 401 Parker Av | alter site to pa# 201807104172. new scope: unit#1: 2 bedrooms with en-suite bath. l/r, kitchen, ffice, laundry & storage. unit#2: 3 bedroom with en-suite bath, powder rm, l/d, family rm, kitchen & storage space. unit# 3: 1 bedrm with en-suite bath, common bath, l/r & kthntt. u4:1 bdrm w/en-ste bthDetails
alter site to pa# 201807104172. new scope: unit#1: 2 bedrooms with en-suite bath. l/r, kitchen, ffice, laundry & storage. unit#2: 3 bedroom with en-suite bath, powder rm, l/d, family rm, kitchen & storage space. unit# 3: 1 bedrm with en-suite bath, common bath, l/r & kthntt. u4:1 bdrm w/en-ste bth | ||
| Apr 29, 2025 | Completed final sign-off Jun 2026 | 738 33rd Av | Joseph Francis Lockary | demolish a 98 sf add on room structure built onto the existing 2nd fl rear of house. add a new 152 sf family room addition to existing 2nd fl rear of house. add a new 168 sf deck to 2nd fl rear of houseDetails
demolish a 98 sf add on room structure built onto the existing 2nd fl rear of house. add a new 152 sf family room addition to existing 2nd fl rear of house. add a new 168 sf deck to 2nd fl rear of house | $180,000 |
| Apr 18, 2025 | In progress issued Aug 2025 | 20 Blake St | D3 Construction | 2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as neededDetails
2/f: reconfiguration of kitchen, bathroom and 2 bedrooms to include master bedroom and add new master bath. replace rear window, exterior door, and rear deck. replace windows in kind as needed | |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 2821 Franklin St | Vega Construction Company | revision to 201909303123 glass guard 2nd fl rear balcony frameless glass.Details
revision to 201909303123 glass guard 2nd fl rear balcony frameless glass. | $11,000 |
| Apr 3, 2025 | In progress issued Jun 2026 | 1 Corbett Av | Chavez Management Group Inc | second floor: to comply with n.o.v. #200564030.to legalize existing unauthorized dwelling unit through udu program.to legalize as-built: bedroom 1& 2, bathroom 1 & kitchen. change of occupancy from r3 to r2.Details
second floor: to comply with n.o.v. #200564030.to legalize existing unauthorized dwelling unit through udu program.to legalize as-built: bedroom 1& 2, bathroom 1 & kitchen. change of occupancy from r3 to r2. | $7,163 |
| Mar 26, 2025 | Completed final sign-off Oct 2025 | 194 Guerrero St | relocated previously approved (p/a 2022-0912-2284) floor beam from a fully "dropped" to a flush at the top condition.Details
relocated previously approved (p/a 2022-0912-2284) floor beam from a fully "dropped" to a flush at the top condition. | ||
| Mar 25, 2025 | Completed final sign-off May 2025 | 35 Alpine Tr | unit 1; revision to 201510018577. modification and submission of rescue (ladder) route: 3 ft + wide route. revise garage door to remain as is no workDetails
unit 1; revision to 201510018577. modification and submission of rescue (ladder) route: 3 ft + wide route. revise garage door to remain as is no work | ||
| Mar 19, 2025 | In progress issued Jul 2025 | 224 29th St | Yefa Construction Inc | renovation/expansion & dwelling unit addition to (e) single family. create 3-story residence via horizontal & vertical addition for 2 apartments & attached garage for 2 car parking.Details
renovation/expansion & dwelling unit addition to (e) single family. create 3-story residence via horizontal & vertical addition for 2 apartments & attached garage for 2 car parking. | $1,425,000 |
| Mar 12, 2025 | Expired or cancelled expired Jun 2026 | 1590 22nd Av | Perez Construction Llc. | revision to 202407176698. revise north property line foundation detail due to e monolithic foundationDetails
revision to 202407176698. revise north property line foundation detail due to e monolithic foundation | |
| Mar 10, 2025 | In progress issued Oct 2025 | 2219 Steiner St | Bernal Hill Builders Inc | proposed horizontal and vertical additional to (e) 2-unit building. reconfigure units layouts, new facade new exterior materials, windows and doors. expand (e) roof deck, add 4th floor.Details
proposed horizontal and vertical additional to (e) 2-unit building. reconfigure units layouts, new facade new exterior materials, windows and doors. expand (e) roof deck, add 4th floor. | $430,000 |
| Mar 10, 2025 | In progress issued Jun 2025 | 1942 Leavenworth St | Maximo Construction | expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bathDetails
expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bath | $200,000 |
| Mar 10, 2025 | In progress issued Mar 2025 | 3878 21st St | D3 Construction | relocation bathroom to laundry room. ref#: 201704043134Details
relocation bathroom to laundry room. ref#: 201704043134 | $1,000 |
| Mar 4, 2025 | In progress filed Mar 2025, not yet issued | 406 Texas St | remodel of (e) 3-story single family residence, scope includes converting into two-family residence with (n) unit-2 on ground floor. unit-1: 2,234sf with 4-bedrooms and 3.5-baths, at 2/f and 3/f; unit-2: 754sf with 1-bedroom and 1-bath at ground floor.Details
remodel of (e) 3-story single family residence, scope includes converting into two-family residence with (n) unit-2 on ground floor. unit-1: 2,234sf with 4-bedrooms and 3.5-baths, at 2/f and 3/f; unit-2: 754sf with 1-bedroom and 1-bath at ground floor. | $200,000 | |
| Dec 6, 2024 | Expired or cancelled expired May 2026 | 240 Vicente St | Jwl 888 Construction Inc | installation of temporary vertical shoring to address nov 202431581 only, no other work proposed or authorized.Details
installation of temporary vertical shoring to address nov 202431581 only, no other work proposed or authorized. | $50,000 |
| Dec 3, 2024 | In progress issued Dec 2024 | 286 28th Av | Vega Construction Company | interior remodel on 1st and 2nd floorrs- replace bath tub and install (n) electrical and plumbing fixtures. renovate wall at kitchen area. remove and replace ceiling exhaust fans.Details
interior remodel on 1st and 2nd floorrs- replace bath tub and install (n) electrical and plumbing fixtures. renovate wall at kitchen area. remove and replace ceiling exhaust fans. | $68,000 |
| Nov 28, 2024 | In progress issued Feb 2025 | 47 Worth St | San Francisco Developers | new rear detached adu, 1-story type v-b, 1 residential dwelling.Details
new rear detached adu, 1-story type v-b, 1 residential dwelling. | $75,000 |
| Nov 15, 2024 | In progress issued Feb 2025 | 2539 Lake St | Aptus Construction | unit 2- adding (n) lighting in kitchen, living room, bedrooms, and hallway . remove and replace walls between living room and dining room. living room becomes office. replace toilet frange in bathroom. reconfiguring door ways in dining room and kitchen. add a closet for storage. modify 2 (e) closetsDetails
unit 2- adding (n) lighting in kitchen, living room, bedrooms, and hallway . remove and replace walls between living room and dining room. living room becomes office. replace toilet frange in bathroom. reconfiguring door ways in dining room and kitchen. add a closet for storage. modify 2 (e) closets | $21,000 |
| Oct 10, 2024 | Completed final sign-off Jan 2026 | 31 Meadowbrook Dr | 1/f: remodel garage/1st floor to convert unfinished space to bedroom and family room (586 sq ft). 2/f: remodel (e) bathroom and remove door by the stairs. (n) electrical and plumbing as required at the area of work only.Details
1/f: remodel garage/1st floor to convert unfinished space to bedroom and family room (586 sq ft). 2/f: remodel (e) bathroom and remove door by the stairs. (n) electrical and plumbing as required at the area of work only. | $85,200 | |
| Oct 8, 2024 | In progress issued Nov 2024 | 72 Townsend St | Golden Heights Remodeling Inc | unit 100:revision to pa #201904299225: bedrm 1- remove pair of door to 1 interior casement window. bedrm 2-remve pair of door to interior fixed window. bedrm 4-remove pair door- 2 interior window, bath 1 grab bar 2/w bench, relocate powder room at bedrm 4, laundry room size room increased,Details
unit 100:revision to pa #201904299225: bedrm 1- remove pair of door to 1 interior casement window. bedrm 2-remve pair of door to interior fixed window. bedrm 4-remove pair door- 2 interior window, bath 1 grab bar 2/w bench, relocate powder room at bedrm 4, laundry room size room increased, | |
| Oct 1, 2024 | Completed final sign-off Mar 2025 | 738 09th Av | Jakcon, Inc | remodel kitchen and powder room, 2 new windows not visible from the street.Details
remodel kitchen and powder room, 2 new windows not visible from the street. | $65,000 |
| Sep 27, 2024 | Completed final sign-off Sep 2025 | 71 Bradford St | Doran Construction & Design | modify roof framing to create 2 new dormers (no higher than (e) roof ridge and no greater than 20% roof area) within unconditioned attic above new storage area, strengthen existing ceiling framing and related supporting elements in orde to support new storage loads.Details
modify roof framing to create 2 new dormers (no higher than (e) roof ridge and no greater than 20% roof area) within unconditioned attic above new storage area, strengthen existing ceiling framing and related supporting elements in orde to support new storage loads. | $18,750 |
| Sep 24, 2024 | In progress issued Oct 2024 | 25 Ford St | revision to permit 202207269343. this revision is to expand the size of the deck at the rear yard.Details
revision to permit 202207269343. this revision is to expand the size of the deck at the rear yard. | $20,000 | |
| Sep 16, 2024 | Expired or cancelled withdrawn Apr 2025 | 3936 21st St | Archetype Construction Corp | remodel & addition to (e) 4,105.6 sqft 3-story, single family residence w/attached 1-car garage, convert(e) non-habitable space @ 1/f to 801.1 sqft conditioned space for adu, new roof deck w/retractable skylight, remodel of decks @ 2/f & 3/f & interior remodel throughout also part of scope of work.Details
remodel & addition to (e) 4,105.6 sqft 3-story, single family residence w/attached 1-car garage, convert(e) non-habitable space @ 1/f to 801.1 sqft conditioned space for adu, new roof deck w/retractable skylight, remodel of decks @ 2/f & 3/f & interior remodel throughout also part of scope of work. | $300,000 |
| Sep 11, 2024 | Completed final sign-off Jan 2025 | 1572 Shrader St | Flying Colors | partial foundation replacementDetails
partial foundation replacement | $10,000 |
| Aug 26, 2024 | Completed final sign-off Jan 2026 | 827 Marina Bl | Colindres & Associates | revision to pa# 202406275400 - 1/f: addition of conditioned space + remodel, new front door & heatpump & tankless wh. 2/f: (n) windows + pocket door between kitchen + dining. 3/f: (n) lighting. 4/f: reconfigure bath + closet + add office (n) windows + doors on north & south facade.Details
revision to pa# 202406275400 - 1/f: addition of conditioned space + remodel, new front door & heatpump & tankless wh. 2/f: (n) windows + pocket door between kitchen + dining. 3/f: (n) lighting. 4/f: reconfigure bath + closet + add office (n) windows + doors on north & south facade. | $125,000 |
| Aug 12, 2024 | Completed final sign-off Jul 2025 | 237 Valley St | Ryan Construction | lateral upgrade of ground floor. partial replacement of foundationDetails
lateral upgrade of ground floor. partial replacement of foundation | $10,000 |
| Aug 7, 2024 | Completed final sign-off Apr 2025 | 470 Bay Shore Bl | (space #2) cold shell base building improvement for tenant space #2. upgrade (e) restrooms to new compliant restrooms. (n) rear exit door. mep deferred.Details
(space #2) cold shell base building improvement for tenant space #2. upgrade (e) restrooms to new compliant restrooms. (n) rear exit door. mep deferred. | $40,000 | |
| Aug 7, 2024 | Completed final sign-off Dec 2025 | 470 Bay Shore Bl | (space #1) cold shell base building improvement for tenant space #1. upgrade (e) restrooms to new compliant restrooms. (n) exterior entries and exit doors. remodel parking lot area. mep deferred.Details
(space #1) cold shell base building improvement for tenant space #1. upgrade (e) restrooms to new compliant restrooms. (n) exterior entries and exit doors. remodel parking lot area. mep deferred. | $50,000 | |
| Jul 29, 2024 | In progress issued Feb 2025 | 226 Louisburg St | to comply with notice of violation# 202307254 to legalize unauthorized unit under the state adu program per planning code section 207.2.Details
to comply with notice of violation# 202307254 to legalize unauthorized unit under the state adu program per planning code section 207.2. | $10,000 | |
| Jul 23, 2024 | Expired or cancelled expired Feb 2026 | 284 32nd Av | Lowry Construction Inc | 1st fl - convert laundry to den, new bathroom, new laundry room; 2nd fl - wall to be removed between kitchen and dining room, kitchen remodel; 3rd fl - new primary bedroom, (e) primary bathroom to be remodeledDetails
1st fl - convert laundry to den, new bathroom, new laundry room; 2nd fl - wall to be removed between kitchen and dining room, kitchen remodel; 3rd fl - new primary bedroom, (e) primary bathroom to be remodeled | $50,000 |
| Jul 23, 2024 | Expired or cancelled expired Sep 2026 | 166 Corbett Av | K&H Construction Development Inc | new 2 car garage at grade; new roof deck above garage; rebuilt (e) wood staircaseDetails
new 2 car garage at grade; new roof deck above garage; rebuilt (e) wood staircase | $39,960 |
| Jul 17, 2024 | Completed final sign-off Oct 2025 | 95 Clarendon Av | Beam Construction Enterprises Inc | revision to permit# 202001162075: design changes from typical retaining wall construction to an anchoring of footing to existing footing for side yard retaining wall replacement.Details
revision to permit# 202001162075: design changes from typical retaining wall construction to an anchoring of footing to existing footing for side yard retaining wall replacement. | |
| Jul 16, 2024 | Completed final sign-off Dec 2024 | 26 Urbano Dr | Pacheco Builders Inc. | replacing stair framing (entrance of the house). (2) new door openings at the kitchen.Details
replacing stair framing (entrance of the house). (2) new door openings at the kitchen. | $5,000 |
| Jul 12, 2024 | Completed final sign-off Apr 2025 | 218 15th Av | Aztech Maintenance Llc | 2nd fl - portion of non-bearing wall @ kitchen to be removed. existing bar cabinet to be removed. existing refrigerator location to be relocated. new lighting at living room and entry foyerDetails
2nd fl - portion of non-bearing wall @ kitchen to be removed. existing bar cabinet to be removed. existing refrigerator location to be relocated. new lighting at living room and entry foyer | $10,000 |
| Jul 10, 2024 | In progress filed Jul 2024, not yet issued | 933 Noe St | remodel (e) kitchen. reconfigure rear bedroom and bath. add (n) folding door at rear facade. repair dryrot. replace (e) wood deck with (n) wood deck. framed to current cbu standards.Details
remodel (e) kitchen. reconfigure rear bedroom and bath. add (n) folding door at rear facade. repair dryrot. replace (e) wood deck with (n) wood deck. framed to current cbu standards. | $200,000 | |
| Jul 8, 2024 | Completed final sign-off Feb 2026 | 58 Valley St | D3 Construction | horizontal expansion of the existing 1/f towards the rear yard by 381 sq.ft. demo existing enclosed porch.Details
horizontal expansion of the existing 1/f towards the rear yard by 381 sq.ft. demo existing enclosed porch. | $150,000 |
| Jun 27, 2024 | In progress issued Sep 2024 | 240 Vicente St | Jwl 888 Construction Inc | 2/f: existing 2 bathroom and 1 kitchen remodel. new full bathroom and powder room. change directions of stairs at rear deck.Details
2/f: existing 2 bathroom and 1 kitchen remodel. new full bathroom and powder room. change directions of stairs at rear deck. | $50,000 |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 246 Waller St | Skytech Construction Inc | rev 201907236728- relocate (1) grade beam and (1) shear wallDetails
rev 201907236728- relocate (1) grade beam and (1) shear wall | |
| Jun 20, 2024 | Completed final sign-off Jan 2026 | 2446 46th Av | O'neill & Neville Construction Inc | 2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permitDetails
2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permit | $300,000 |
| Jun 14, 2024 | Expired or cancelled withdrawn Sep 2024 | 2140 Great Hy | Terence Mcmahon Construction | to comply with nov 201953441. commencement of work not started under previously approved permit pa 8507158Details
to comply with nov 201953441. commencement of work not started under previously approved permit pa 8507158 | $12,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 1487 Greenwich St | Prime Construction & Renovation Inc. | unit 1, 1st fl - new powder room, existing full bathroom remodelDetails
unit 1, 1st fl - new powder room, existing full bathroom remodel | $10,000 |
| Jun 3, 2024 | In progress issued Jun 2024 | 277 05th Av | American Construction | install (n) foundation for voluntary seismic upgrade and sheerwall and holddownsDetails
install (n) foundation for voluntary seismic upgrade and sheerwall and holddowns | $10,000 |
| May 31, 2024 | In progress filed May 2024, not yet issued | 47 Worth St | revision to approved pa# 202405212607: adding cribbing plan for foundation, as the found as the foundation are replaced at one time.Details
revision to approved pa# 202405212607: adding cribbing plan for foundation, as the found as the foundation are replaced at one time. | $10,000 | |
| May 31, 2024 | Expired or cancelled expired Oct 2025 | 1925 Fillmore St | D3 Construction | unit #a: 2/f - new bathroom on second floor at existing closet.Details
unit #a: 2/f - new bathroom on second floor at existing closet. | $10,000 |
| May 28, 2024 | Completed final sign-off Jun 2025 | 4367 17th St | new security iron gate at the bottom of front entry stairs. 6-0" max height.Details
new security iron gate at the bottom of front entry stairs. 6-0" max height. | $5,363 | |
| May 24, 2024 | Completed final sign-off Oct 2025 | 2212 Lake St | Cook Construction | interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath.Details
interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath. | $30,000 |
| May 21, 2024 | In progress issued May 2024 | 47 Worth St | San Francisco Developers | revision to bpa# 2024-0417-0118. retaining 1 shoring.Details
revision to bpa# 2024-0417-0118. retaining 1 shoring. | $10,000 |
| May 20, 2024 | Completed final sign-off May 2025 | 54 States St | William Gregory Clause | repair and replace (2) front facing wood decks and guardrails in kind.Details
repair and replace (2) front facing wood decks and guardrails in kind. | $35,000 |
| May 15, 2024 | Expired or cancelled expired Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | foundation revision to permit 202304266459.strengthen exist. fdn with new retaining wall in unit #8Details
foundation revision to permit 202304266459.strengthen exist. fdn with new retaining wall in unit #8 | $5,000 |
| May 6, 2024 | Completed final sign-off Mar 2026 | 3941 23rd St | D3 Construction, J W Structures | rear addition infill under (e) deck. area approximately 149 sqft. lower (e) garage/storage slab to align with (e) floor level in habitable portion of lower floor as a new addition to pa# 202401174093.Details
rear addition infill under (e) deck. area approximately 149 sqft. lower (e) garage/storage slab to align with (e) floor level in habitable portion of lower floor as a new addition to pa# 202401174093. | $100,000 |
| May 1, 2024 | Completed final sign-off Nov 2024 | 62 Idora Av | Prime Construction & Renovation Inc. | new bathroom, new family room. all on ground flr.Details
new bathroom, new family room. all on ground flr. | $20,000 |
| Apr 24, 2024 | In progress issued Jun 2024 | 2486 22nd Av | D3 Construction | renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kindDetails
renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kind | $250,000 |
| Apr 17, 2024 | In progress issued Apr 2024 | 47 Worth St | San Francisco Developers | voluntary foundation replacement. with no architectural changes.Details
voluntary foundation replacement. with no architectural changes. | $60,000 |
| Apr 1, 2024 | Completed final sign-off Apr 2024 | 1218 South Van Ness Av | S L M Development Inc. | new rear door and window in the multipurpose room (not street facing).Details
new rear door and window in the multipurpose room (not street facing). | $4,000 |