Tom Brutting
- Listed as
- architect, authorized agent-others, designer
- Firm
- Hkit Architects
- Based in
- Oakland
- On San Francisco permits
- Apr 2001 to Dec 2018
81 permits since 2000 (architect on 77 permits, designer on 3 permits, authorized agent-others on 1 permit): 69 completed, 8 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | revision to app#201809170424(cottage) in lieu of new 6 3/4 x 15 gl beam, posts, and footings, provide new 2x12 and attach to extg 4x12. n/a for maherDetails
revision to app#201809170424(cottage) in lieu of new 6 3/4 x 15 gl beam, posts, and footings, provide new 2x12 and attach to extg 4x12. n/a for maher | |
| Nov 14, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | revision to pa #20185300529 - change in restroom door swings.Details
revision to pa #20185300529 - change in restroom door swings. | |
| Sep 17, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | interior renovation of (e) cottage building. removal & additional of non-structural partition walls. replacement of 1 exterior ramp & railing & replacement of (e) wood fence. maher n/a.Details
interior renovation of (e) cottage building. removal & additional of non-structural partition walls. replacement of 1 exterior ramp & railing & replacement of (e) wood fence. maher n/a. | $150,000 |
| Jul 5, 2018 | Completed final sign-off Sep 2018 | 1855 15th St | D.F.P.F Corp Dba Fine Line Construction | rev. to #201510301342. tech infeasibility (4) doors; maint. room-recess ext door & add 2nd accessible entry/exit door thru community rm; remove ext hardware @ gate g2 & door str 1a; provide occup load & exiting diagram; add mailbox canopy; change window 4a @ office to storefront door & sidelite.Details
rev. to #201510301342. tech infeasibility (4) doors; maint. room-recess ext door & add 2nd accessible entry/exit door thru community rm; remove ext hardware @ gate g2 & door str 1a; provide occup load & exiting diagram; add mailbox canopy; change window 4a @ office to storefront door & sidelite. | $32,500 |
| May 30, 2018 | Completed final sign-off Aug 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher naDetails
unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher na | $80,000 |
| May 30, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | renovation of 2 (e) restrooms, scope of work includes replacement of fixtures and fittings in kind and replacement of interior finishes maher naDetails
renovation of 2 (e) restrooms, scope of work includes replacement of fixtures and fittings in kind and replacement of interior finishes maher na | $50,000 |
| Apr 27, 2018 | Expired or cancelled cancelled Oct 2022 | 1491 Sunnydale Av | Cahill Contractors Llc. | this is part of a project with pa# 2016/12/22/5710-s. in order to receive final stormwater control plan approval from sfpuc written approval form dbi-pid of the proposed stormwater related plumbing design is required.Details
this is part of a project with pa# 2016/12/22/5710-s. in order to receive final stormwater control plan approval from sfpuc written approval form dbi-pid of the proposed stormwater related plumbing design is required. | |
| Feb 26, 2018 | Completed final sign-off May 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $100,000 |
| Feb 26, 2018 | Completed final sign-off Apr 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $75,000 |
| Jan 22, 2018 | Completed final sign-off Apr 2018 | 1400 Geary Bl | C J Reed Construction Co | 25th flr - unit 2501, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele workDetails
25th flr - unit 2501, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele work | $6,000 |
| Jan 22, 2018 | Completed final sign-off Mar 2018 | 1400 Geary Bl | C J Reed Construction Co | 7th flr - unit 7f, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele workDetails
7th flr - unit 7f, interior remodel, replace plm fixtures, install shower grad bar backing and add local smoke det at sleeping room and living room/entry area. no ele work | $6,000 |
| Dec 12, 2017 | Completed final sign-off Nov 2018 | 1855 15th St | D.F.P.F Corp Dba Fine Line Construction | revision to 201510301342 replace sewer lateral out to street, cut & patch. ground floor struct slab as needed. cut and replace sidewalk as needed cut & patch street as needed.Details
revision to 201510301342 replace sewer lateral out to street, cut & patch. ground floor struct slab as needed. cut and replace sidewalk as needed cut & patch street as needed. | $40,000 |
| Nov 21, 2017 | Completed final sign-off Feb 2018 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 4p - interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work)Details
4th fl, unit 4p - interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) | $6,000 |
| Oct 27, 2017 | Completed final sign-off Nov 2017 | 1400 Geary Bl | C J Reed Construction Co | 25th fl, suite 2502: revision to pa #201709148155. relocating the kitchenette.Details
25th fl, suite 2502: revision to pa #201709148155. relocating the kitchenette. | |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 1400 Geary Bl | C J Reed Construction Co | 25th fl/suite 2502: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm/entry area. no exterior work.Details
25th fl/suite 2502: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm/entry area. no exterior work. | $6,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na.Details
unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na. | $120,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | #120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $90,000 |
| Aug 17, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | #328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $120,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2018 | 1855 15th St | D.F.P.F Corp Dba Fine Line Construction | revision to app#201510301342. 1)revise extg bathtub to roll in shower at 2 units: #201 and #403. 2)revise extg unit to communication unit #503. seperate life safety permit required.Details
revision to app#201510301342. 1)revise extg bathtub to roll in shower at 2 units: #201 and #403. 2)revise extg unit to communication unit #503. seperate life safety permit required. | |
| Jul 21, 2017 | Completed final sign-off Jun 2018 | 3850 18th St | D.F.P.F Corp Dba Fine Line Construction | revision to app#201510301343. revision of 2 extg units to communication units #509, #510. separate life-safty permit required. n/a for maherDetails
revision to app#201510301343. revision of 2 extg units to communication units #509, #510. separate life-safty permit required. n/a for maher | $25,000 |
| Jun 26, 2017 | Completed final sign-off Jul 2017 | 1400 Geary Bl | C J Reed Construction Co | 10th fl: unit #1007: interior remodel: replace plumbing fixtures, install shower grab bar backing. add smoke detectors at sleeping rooms and living room/entry area. no exterior work.Details
10th fl: unit #1007: interior remodel: replace plumbing fixtures, install shower grab bar backing. add smoke detectors at sleeping rooms and living room/entry area. no exterior work. | $6,000 |
| Jun 15, 2017 | Completed final sign-off Oct 2019 | 3325 Octavia St | V And Company, Incorporated | renovation of kitchen, bathroom & bedroom @ all 3 units. addition of elevator structural work. some window replacement(not facing street). garage door revision. change of use from 2 units with 1 house keeping to r-2 w/ 3 residential unitsDetails
renovation of kitchen, bathroom & bedroom @ all 3 units. addition of elevator structural work. some window replacement(not facing street). garage door revision. change of use from 2 units with 1 house keeping to r-2 w/ 3 residential units | $200,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer.Details
unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer. | $50,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maherDetails
unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maher | $50,000 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307Details
unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307 | $100,000 |
| Mar 31, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher.Details
unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher. | $40,000 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a denDetails
7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a den | |
| Mar 15, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 4th floor, unit 403 interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior workDetails
4th floor, unit 403 interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work | $45,000 |
| Mar 15, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | C J Reed Construction Co | 4th floor, unit 4n interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. thereis no exterior workDetails
4th floor, unit 4n interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. thereis no exterior work | $40,000 |
| Mar 14, 2017 | Completed final sign-off May 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | open door from senior housing unit 325 to 326, create 1 bedroom from studio. existing lighting to remainDetails
open door from senior housing unit 325 to 326, create 1 bedroom from studio. existing lighting to remain | $20,000 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | C J Reed Construction Co | #5b: 5th flr: interior remodel: replace plumbing fixtures, install shower grab bar caking, add local smoke detector at sleeping room and living riim/entry area. no exterior workDetails
#5b: 5th flr: interior remodel: replace plumbing fixtures, install shower grab bar caking, add local smoke detector at sleeping room and living riim/entry area. no exterior work | $6,000 |
| Feb 14, 2017 | Completed final sign-off Apr 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 16th fl unit 1608 interior remodel, replace plumbing fixtures. install shower grab bar backing add smoke detectorDetails
16th fl unit 1608 interior remodel, replace plumbing fixtures. install shower grab bar backing add smoke detector | $6,000 |
| Jan 12, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinanceDetails
unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinance | $75,000 |
| Dec 16, 2016 | Completed final sign-off Apr 2017 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 7th floor - unit 7j: interior remodel, replace plumbing fixtures. install shower grabbar backing. add local smoke alarm at sleeping room and living room/entry area. (n) cooktop and exhaust hood in kitchenette.Details
7th floor - unit 7j: interior remodel, replace plumbing fixtures. install shower grabbar backing. add local smoke alarm at sleeping room and living room/entry area. (n) cooktop and exhaust hood in kitchenette. | $30,000 |
| Dec 15, 2016 | Completed final sign-off Mar 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel and expansion of bathroom and interior finishes at living unit #312 maher naDetails
remodel and expansion of bathroom and interior finishes at living unit #312 maher na | $35,000 |
| Dec 15, 2016 | Expired or cancelled cancelled Feb 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel and expansion of bathroom and interior finishes at living unit #306 maher naDetails
remodel and expansion of bathroom and interior finishes at living unit #306 maher na | $35,000 |
| Dec 1, 2016 | Completed final sign-off Mar 2017 | 1400 Geary Bl | C J Reed Construction Co | 5th floor, unit 505 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area.Details
5th floor, unit 505 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. | $6,000 |
| Nov 21, 2016 | Completed final sign-off Feb 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit # 107: remodel & expansion of (e) bathroom, remodel of (e) closet & cosmetic renovation of living area. includes new lighting, casework, finishes & plumbing fixtures maher naDetails
unit # 107: remodel & expansion of (e) bathroom, remodel of (e) closet & cosmetic renovation of living area. includes new lighting, casework, finishes & plumbing fixtures maher na | $30,000 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | C J Reed Construction Co | 6th floor unit #6b: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). no exterior workDetails
6th floor unit #6b: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). no exterior work | $6,000 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | C J Reed Construction Co | 20th floor #2003: interior remodel, remove extg non-bearing interior wall between living room, bedroom, replace toilet & shower, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette).Details
20th floor #2003: interior remodel, remove extg non-bearing interior wall between living room, bedroom, replace toilet & shower, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. (no cooktop in kitchenette). | $10,000 |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 1400 Geary Bl | C J Reed Construction Co | 7th floor, unit #702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no cook top in kitchenette.Details
7th floor, unit #702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living room/entry area. no cook top in kitchenette. | $5,000 |
| Sep 2, 2016 | Never finaled issued May 2017, no final | 1603 Pine St | Cahill Contractors Llc. | ti construction & storefront renovation. change of use from retail to office. n/a for maher ordinance no 155-13.Details
ti construction & storefront renovation. change of use from retail to office. n/a for maher ordinance no 155-13. | $200,000 |
| Sep 2, 2016 | Expired or cancelled cancelled Nov 2024 | 3400 Laguna St | 1 story horizontal rear addition.Details
1 story horizontal rear addition. | $4,000,000 | |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1400 Geary Bl | C J Reed Construction Co | 9th flr, unit 909: interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
9th flr, unit 909: interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $4,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1400 Geary Bl | C J Reed Construction Co | 24th flr, unit 2401 : interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
24th flr, unit 2401 : interior work, replace plumbing fixtures. install shower grab bar backing add local smoke detection at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $4,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | unit 4k/4th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
unit 4k/4th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $65,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | unit 508/5th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. adding light switch to extg closet light. there is no exterior work. there is no cook top in kitchenette.Details
unit 508/5th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. adding light switch to extg closet light. there is no exterior work. there is no cook top in kitchenette. | $65,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | unit 1805/18th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
unit 1805/18th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $85,000 |
| May 6, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher naDetails
unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher na | $110,000 |
| Apr 8, 2016 | Completed final sign-off Oct 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel and expansion of 3 existing bathrooms in priviet units. new shower fixtures, tile, floors and walls. new lighting, vanity and faucet maher not reqDetails
remodel and expansion of 3 existing bathrooms in priviet units. new shower fixtures, tile, floors and walls. new lighting, vanity and faucet maher not req | $60,000 |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 1400 Geary Bl | C J Reed Construction Co | 17th fl suite 1702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette maher not reqDetails
17th fl suite 1702: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette maher not req | $12,000 |
| Mar 30, 2016 | Completed final sign-off Aug 2016 | 1400 Geary Bl | C J Reed Construction Co | 7th fl unit 7b: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
7th fl unit 7b: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $12,000 |
| Mar 30, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 11th fl, unit 1105: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
11th fl, unit 1105: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $12,000 |
| Mar 30, 2016 | Completed final sign-off May 2016 | 1400 Geary Bl | C J Reed Construction Co | 17th fl, unit 1709: interior remodel, replace plumbing fixtures, add power outlets at new wall and at living rm, wall switches at e closet light fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
17th fl, unit 1709: interior remodel, replace plumbing fixtures, add power outlets at new wall and at living rm, wall switches at e closet light fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $20,000 |
| Mar 17, 2016 | Completed final sign-off May 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work.Details
6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work. | $130,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 6/f unit #601- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette.Details
6/f unit #601- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette. | $1,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | C J Reed Construction Co | 20/f unit #2010- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette.Details
20/f unit #2010- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette. | $1,000 |
| Mar 14, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher naDetails
unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher na | $110,000 |
| Jan 27, 2016 | Completed final sign-off Jun 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 11th floor, uit 1103: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
11th floor, uit 1103: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 17th floor, unit 1704: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
17th floor, unit 1704: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 16th flr: unit #1603: interior remodel, replace fixtures, add or replace certain light fixtures, add power outlets for convenience appliances at kitchenette, add local smoke detector install shower grab bars and backing.no exterior work.Details
16th flr: unit #1603: interior remodel, replace fixtures, add or replace certain light fixtures, add power outlets for convenience appliances at kitchenette, add local smoke detector install shower grab bars and backing.no exterior work. | $42,350 |
| Jan 19, 2016 | Completed final sign-off Mar 2016 | 1400 Geary Bl | C J Reed Construction Co | 7th flr:, unit 7e: interior remodel, replace plumbing fixtures,install shower grab bars & backing, no exterior work (no cooktop in kitchenette).Details
7th flr:, unit 7e: interior remodel, replace plumbing fixtures,install shower grab bars & backing, no exterior work (no cooktop in kitchenette). | $37,345 |
| Dec 28, 2015 | Completed final sign-off Jun 2018 | 145 Guerrero St | Saarman Construction,Ltd. | upgrade accessible path of travel to entrance, upgrade accessible office window, public bathrooms. upgrade 10% of units per 11b mobility & 5% to communications. replace exterior windows, roof, new scavenger fans @ roof. replace domestic boilers. seismic retrofit.Details
upgrade accessible path of travel to entrance, upgrade accessible office window, public bathrooms. upgrade 10% of units per 11b mobility & 5% to communications. replace exterior windows, roof, new scavenger fans @ roof. replace domestic boilers. seismic retrofit. | $5,600,000 |
| Dec 23, 2015 | Completed final sign-off Feb 2016 | 1400 Geary Bl | C J Reed Construction Co | #7th floor, unit #7n - interior remodel, replacement of plumbing fixtures, install shower, grab barsars and backing. no exterior work.Details
#7th floor, unit #7n - interior remodel, replacement of plumbing fixtures, install shower, grab barsars and backing. no exterior work. | $35,000 |
| Oct 2, 2015 | Completed final sign-off Jan 2016 | 1400 Geary Bl | C J Reed Construction Co | unit #507: interior remodel, replace plumbing fixtures, add or replace certain light fixtures, no exterior work.Details
unit #507: interior remodel, replace plumbing fixtures, add or replace certain light fixtures, no exterior work. | $37,730 |
| Mar 24, 2015 | Completed final sign-off Jun 2015 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 6th flr, unit 6a interior remodel: one, two bedroom, two bathroom unit into a one bedroom, two bathroom unit with den. no exterior work.Details
6th flr, unit 6a interior remodel: one, two bedroom, two bathroom unit into a one bedroom, two bathroom unit with den. no exterior work. | $136,000 |
| Jun 12, 2013 | Never finaled issued Jun 2013, no final | 3400 Laguna St | Hildebrand Renovation | barrier removal. combine small existing mens and womens toilet rooms into 1 unisex, single accomodation toilet room. ch 11b compliant. install drinking fountain, ch 11e compliantDetails
barrier removal. combine small existing mens and womens toilet rooms into 1 unisex, single accomodation toilet room. ch 11b compliant. install drinking fountain, ch 11e compliant | $42,000 |
| Jun 12, 2013 | Never finaled issued Jul 2013, no final | 3400 Laguna St | Hildebrand Renovation | remodel basement level resident common use spaces. subdivide existing common use spaces into rooms. fitness center, arts and crafts, wellness center, laundryDetails
remodel basement level resident common use spaces. subdivide existing common use spaces into rooms. fitness center, arts and crafts, wellness center, laundry | $49,000 |
| Jun 3, 2009 | Completed final sign-off Nov 2009 | 149 Mason St | Nibbi Bros Assoc Inc. | at residential floors 2 thru 8-provide sub-ducts at cooridors in lieu of fire smoke dampers, per cbc 716.5.3 exception 1. alteration to base building permit pa# 2006-0803-8553/s3Details
at residential floors 2 thru 8-provide sub-ducts at cooridors in lieu of fire smoke dampers, per cbc 716.5.3 exception 1. alteration to base building permit pa# 2006-0803-8553/s3 | |
| Apr 24, 2009 | Completed final sign-off Feb 2010 | 1400 Geary Bl | Mayta & Jensen | 19th floor-removal of (e) & installation of new finishes, fixtures, doors, appliances, cabinetry & counter tops at 2 (e) apartments units that are being combined into one unit. permit includes architectural/structural, electrical, mechanical & plumbing drawingsDetails
19th floor-removal of (e) & installation of new finishes, fixtures, doors, appliances, cabinetry & counter tops at 2 (e) apartments units that are being combined into one unit. permit includes architectural/structural, electrical, mechanical & plumbing drawings | $191,000 |
| Jul 31, 2008 | Never finaled issued Jul 2008, no final | 149 Mason St | revision to approved pa# 2006.08.03.8553/s2. revise footing detail per site conditions.Details
revision to approved pa# 2006.08.03.8553/s2. revise footing detail per site conditions. | $15,000 | |
| Apr 21, 2008 | Completed final sign-off Oct 2008 | 650 Eddy St | Cahill Contractors Inc | revision to pa# 2005-0913-2686. add 1 layer of gyp board to one face of (e) walls inside the garage & to interior face of (e) exterior walls at north elevation only. change 4 hm door assemblies to 90 min fire rated assemblies. add framed gypsum board soffits at 8 windows, for fire sprinlkler heads.Details
revision to pa# 2005-0913-2686. add 1 layer of gyp board to one face of (e) walls inside the garage & to interior face of (e) exterior walls at north elevation only. change 4 hm door assemblies to 90 min fire rated assemblies. add framed gypsum board soffits at 8 windows, for fire sprinlkler heads. | $20,000 |
| Apr 7, 2008 | Completed final sign-off Oct 2008 | 650 Eddy St | Cahill Contractors Inc | add 8 sprinkler heads total. 2 each on each floor. 2-3-4 & 5th floors. revision to permit #2005/0913/2686 s3.Details
add 8 sprinkler heads total. 2 each on each floor. 2-3-4 & 5th floors. revision to permit #2005/0913/2686 s3. | $10,000 |
| Aug 15, 2007 | Never finaled issued Aug 2007, no final | 1250 Haight St | R T S Systems And Design Llc | fire alarm as built submittal to show new locations of fire smoke dampers, added by mechanical contractor. additional fsd's were requested at time of final inspection by inspector. this as built submittal was requested by mary boucher (fire dept) to document the changes. revision pa# 200604209498Details
fire alarm as built submittal to show new locations of fire smoke dampers, added by mechanical contractor. additional fsd's were requested at time of final inspection by inspector. this as built submittal was requested by mary boucher (fire dept) to document the changes. revision pa# 200604209498 | $283 |
| May 21, 2007 | Never finaled issued May 2007, no final | 1550 Sutter St | Castle Construction | all work is along & 1 hr. corridor: removal of base cabinet, uppers/closet in activity room, removal of wall/doors,replace w/ith 20 min.doors in music area. remove window and in fill with 1 hr.wall in north lobby. removal of low wall & pediments on arch. feature & construct low wall in south lobbyDetails
all work is along & 1 hr. corridor: removal of base cabinet, uppers/closet in activity room, removal of wall/doors,replace w/ith 20 min.doors in music area. remove window and in fill with 1 hr.wall in north lobby. removal of low wall & pediments on arch. feature & construct low wall in south lobby | $21,000 |
| Feb 26, 2007 | Never finaled issued Feb 2007, no final | 201 Berry St | Cahill Contractors Inc | renew pa# 2004/10/21/7404, pa# 2004/07/12/8569 & pa# 2005/06/26/6362 bacause of expireation. renewal required to receive final sign off.Details
renew pa# 2004/10/21/7404, pa# 2004/07/12/8569 & pa# 2005/06/26/6362 bacause of expireation. renewal required to receive final sign off. | |
| Oct 23, 2006 | Completed final sign-off Feb 2013 | 701 Golden Gate Av | Cahill Contractors Inc | to erect a new 8 stories, 100 dwelling units building.Details
to erect a new 8 stories, 100 dwelling units building. | |
| Jul 11, 2005 | Completed final sign-off Mar 2007 | 321 Clementina St | unit f- remodel (e) kitchens to ada compliance, new flooring, new mechanical shaft,new landscaping, new roofing, upgrade elevator (e). replace windows to dual glazing. solar panels on separate permit, fire alarm system on separate permit.Details
unit f- remodel (e) kitchens to ada compliance, new flooring, new mechanical shaft,new landscaping, new roofing, upgrade elevator (e). replace windows to dual glazing. solar panels on separate permit, fire alarm system on separate permit. | ||
| Nov 22, 2004 | Completed final sign-off Oct 2007 | 1250 Haight St | Cahill Contractors Inc | adaptive re-use of e church into senior apts, preserve building shell, create 4 stories within seismDetails
adaptive re-use of e church into senior apts, preserve building shell, create 4 stories within seism | $3,500,000 |
| Oct 21, 2004 | Expired or cancelled expired Apr 2007 | 201 Berry St | Cahill Contractors Inc | install, operate + dismatle fixed tower crane. (temporary construction). related site permitDetails
install, operate + dismatle fixed tower crane. (temporary construction). related site permit | $100,000 |
| Apr 27, 2001 | Completed final sign-off May 2001 | 301 Ellis St | revision to extg app #9811436/work includes garage street levelDetails
revision to extg app #9811436/work includes garage street level | $100 |