Oshri Prosper Malka
- Listed as
- authorized agent-others, contractor
- Firm
- Prosper Construction Dev Inc.
- Based in
- Sunnyvale
- On San Francisco permits
- Dec 2012 to Aug 2026
238 permits since 2000 (contractor on 238 permits, authorized agent-others on 5 permits): 141 completed, 31 in progress, 50 never finaled, 16 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 238.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 1421 Hayes St | Prosper Construction Dev Inc. | full bathroom remodel, in kind.Details
full bathroom remodel, in kind. | $13,550 |
| Aug 14, 2026 | In progress issued Aug 2026 | 34 Fairfield Wy | Prosper Construction Dev Inc. | approx. 26ft french drain at back of hom on east side. demolish stucco on entire house & and stucco, approx. 3000sqft. replace 23 windows in kind street facing, like to like. replace (1) interior outlet.Details
approx. 26ft french drain at back of hom on east side. demolish stucco on entire house & and stucco, approx. 3000sqft. replace 23 windows in kind street facing, like to like. replace (1) interior outlet. | $70,000 |
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 55 Valparaiso St | Prosper Construction Dev Inc. | (2) new roof decks addition. new roof access. new lot line windows. planning record number 2025-010306prjDetails
(2) new roof decks addition. new roof access. new lot line windows. planning record number 2025-010306prj | $30,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 1930 33rd Av | Prosper Construction Dev Inc. | add conditioned space on 1st flr (700 sqft) & a (n) bathroom. infill lightwell (50sqft) on 2nd flr. add a (n) interior stairway. relocate kitchen on 1st flr.Details
add conditioned space on 1st flr (700 sqft) & a (n) bathroom. infill lightwell (50sqft) on 2nd flr. add a (n) interior stairway. relocate kitchen on 1st flr. | $175,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 1264 03rd Av | Prosper Construction Dev Inc. | revisoin to bpa#202512242587. new 8x6.5 dormer in 3rd floor bedroom.Details
revisoin to bpa#202512242587. new 8x6.5 dormer in 3rd floor bedroom. | $10,000 |
| May 28, 2026 | In progress issued May 2026 | 25 Vernon St | Prosper Construction Dev Inc., Goldenline General Construction Inc | remodel full kitchen like for like. rewire entire home, 200a in-iind.Details
remodel full kitchen like for like. rewire entire home, 200a in-iind. | $16,500 |
| May 28, 2026 | In progress issued May 2026 | 55 Valparaiso St | Prosper Construction Dev Inc. | reroofing. with tpo. no torch down.Details
reroofing. with tpo. no torch down. | $8,500 |
| May 11, 2026 | In progress issued May 2026 | 155 Miraloma Dr | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa# 202306281077. all work is complete.Details
to obtain final inspection for work approved under pa# 202306281077. all work is complete. | |
| Apr 7, 2026 | Completed final sign-off Jul 2026 | 232 Ellsworth St | Prosper Construction Dev Inc. | 64 sqf bathroom remodeling in kind.Details
64 sqf bathroom remodeling in kind. | $20,000 |
| Mar 18, 2026 | Completed final sign-off Aug 2026 | 201 Magellan Av | Prosper Construction Dev Inc. | bathroom remodel like for likeDetails
bathroom remodel like for like | $20,000 |
| Mar 18, 2026 | In progress issued Mar 2026 | 884 York St | Prosper Construction Dev Inc. | bathroom remodel like for like 43 sq ft.Details
bathroom remodel like for like 43 sq ft. | $22,000 |
| Mar 18, 2026 | Completed final sign-off Jun 2026 | 1236 Washington St | Prosper Construction Dev Inc. | 35 sq ft bathroom remodel - all in kind, no wall removal.Details
35 sq ft bathroom remodel - all in kind, no wall removal. | $20,000 |
| Mar 17, 2026 | In progress filed Mar 2026, not yet issued | 1264 03rd Av | Prosper Construction Dev Inc. | revision to permit#202512242587. new 8x8 dormer on 3rd floor for a new bathroom. new bedroom on 3rd floorDetails
revision to permit#202512242587. new 8x8 dormer on 3rd floor for a new bathroom. new bedroom on 3rd floor | $30,000 |
| Mar 16, 2026 | Completed final sign-off Apr 2026 | 1264 03rd Av | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa # 202208049962 & 202406043709. all work is complete.Details
to obtain final inspection for work approved under pa # 202208049962 & 202406043709. all work is complete. | |
| Mar 16, 2026 | In progress issued May 2026 | 999 Green St | Prosper Construction Dev Inc. | unit 1104: remodel, demo/replace bath, move non-load bearing partition @ mater closet, add new washer/dryer, replace interior doors in-kind, remodel kitchen. window wall replacement of ne facade. no new square footage, no expansion.Details
unit 1104: remodel, demo/replace bath, move non-load bearing partition @ mater closet, add new washer/dryer, replace interior doors in-kind, remodel kitchen. window wall replacement of ne facade. no new square footage, no expansion. | $47,500 |
| Mar 9, 2026 | Completed final sign-off Apr 2026 | 34 Topaz Wy | Prosper Construction Dev Inc. | bathroom remodel like for like.Details
bathroom remodel like for like. | $35,000 |
| Mar 2, 2026 | Completed final sign-off Mar 2026 | 401 Anderson St | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa# 202211035797. all work is complete.Details
to obtain final inspection for work approved under pa# 202211035797. all work is complete. | |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 401 Anderson St | Prosper Construction Dev Inc. | renewal.Details
renewal. | |
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 1264 03rd Av | Prosper Construction Dev Inc. | reroof, no hot work. ref. pa# 202601224329 for sheathing repair.Details
reroof, no hot work. ref. pa# 202601224329 for sheathing repair. | $15,000 |
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 1264 03rd Av | Prosper Construction Dev Inc. | replace rotten plywood at roof. ref pa# 202601224330Details
replace rotten plywood at roof. ref pa# 202601224330 | $2,000 |
| Dec 24, 2025 | In progress issued Jan 2026 | 1264 03rd Av | Prosper Construction Dev Inc. | to install new heating system (baseboard radiators w/central boiler). interior renovation and replace (e) windows/doors. to comply with nov 202420749.Details
to install new heating system (baseboard radiators w/central boiler). interior renovation and replace (e) windows/doors. to comply with nov 202420749. | $275,000 |
| Dec 24, 2025 | In progress issued Jan 2026 | 476 Lansdale Av | Prosper Construction Dev Inc. | shared wood fence and gate with neighbor at 472 lansdale. sharing plans 202512121711Details
shared wood fence and gate with neighbor at 472 lansdale. sharing plans 202512121711 | $500 |
| Dec 24, 2025 | Completed final sign-off Apr 2026 | 1242 19th Av | Prosper Construction Dev Inc. | re-roofing: reroofing 2500 sq ft t.p.o, no torch down, ref#202411205342 and #202512242638Details
re-roofing: reroofing 2500 sq ft t.p.o, no torch down, ref#202411205342 and #202512242638 | $16,000 |
| Dec 24, 2025 | Completed final sign-off Apr 2026 | 1242 19th Av | Prosper Construction Dev Inc. | replace plywood as needed/sheating, ref#202411205342 and ref#202512242636 for re-roofing.Details
replace plywood as needed/sheating, ref#202411205342 and ref#202512242636 for re-roofing. | $4,000 |
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 1293 28th Av | Prosper Construction Dev Inc. | to add bathroom on third floor.Details
to add bathroom on third floor. | $25,000 |
| Dec 12, 2025 | In progress issued Jan 2026 | 472 Lansdale Av | Prosper Construction Dev Inc. | provide corrective action to nov 202544191. install 2 new windows. replace damaged tubular steel post under (e) beam. remove unpermitted wood enclosure under front overhang. new shared wood gate with the neighbor at the side of houseDetails
provide corrective action to nov 202544191. install 2 new windows. replace damaged tubular steel post under (e) beam. remove unpermitted wood enclosure under front overhang. new shared wood gate with the neighbor at the side of house | $6,500 |
| Nov 24, 2025 | In progress issued Dec 2025 | 1295 Holloway Av | Prosper Construction Dev Inc. | re roofing no hot works.Details
re roofing no hot works. | $8,000 |
| Nov 24, 2025 | In progress issued Dec 2025 | 1295 Holloway Av | Prosper Construction Dev Inc. | reference pa 202511240329: replacement of sheating for re roofing.Details
reference pa 202511240329: replacement of sheating for re roofing. | $8,000 |
| Nov 18, 2025 | In progress issued Nov 2025 | 1295 Holloway Av | Prosper Construction Dev Inc. | commencement of work not started under previously approved permit 202309086221Details
commencement of work not started under previously approved permit 202309086221 | $19,440 |
| Nov 13, 2025 | Completed final sign-off Apr 2026 | 888 Darien Wy | Prosper Construction Dev Inc. | remove (e) ext stucco in designated areas to expose substrage and assess for moisture instrusion or damage; install new water resistent barrier, flashing & lathe; 3 cont of stucco; staircase less than 50%, brick replacement and waterproof. no structural modifications.Details
remove (e) ext stucco in designated areas to expose substrage and assess for moisture instrusion or damage; install new water resistent barrier, flashing & lathe; 3 cont of stucco; staircase less than 50%, brick replacement and waterproof. no structural modifications. | $45,000 |
| Nov 7, 2025 | Completed final sign-off Mar 2026 | 401 Anderson St | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa # 2023-0330-4707. all work is complete.Details
to obtain final inspection for work approved under pa # 2023-0330-4707. all work is complete. | |
| Oct 30, 2025 | In progress issued Oct 2025 | 1634 Dolores St | Prosper Construction Dev Inc. | to obtain final inspection for work approved under bpa 202104027826. all work is complete.Details
to obtain final inspection for work approved under bpa 202104027826. all work is complete. | |
| Oct 28, 2025 | In progress issued Oct 2025 | 1756 Grove St | Prosper Construction Dev Inc. | front windows replacement 10 windows on front of home. windows to be fiberglass. stucco replacement on front facade.Details
front windows replacement 10 windows on front of home. windows to be fiberglass. stucco replacement on front facade. | $20,000 |
| Oct 23, 2025 | Completed final sign-off Nov 2025 | 68 Castro St | Prosper Construction Dev Inc. | laundry room remodel in kind. replace electrical receptacles. new plumbing for laundry room, like for like. drywall repair.Details
laundry room remodel in kind. replace electrical receptacles. new plumbing for laundry room, like for like. drywall repair. | $3,500 |
| Oct 17, 2025 | In progress issued Oct 2025 | 1930 Eddy St | Prosper Construction Dev Inc. | apt 101: remove shelves in living room, install 4 wall cabinets and patch dry wall in the kitchen area, install crown molding in the living room, install laminated floor throughout apartment (not in bathroom) paint the area.Details
apt 101: remove shelves in living room, install 4 wall cabinets and patch dry wall in the kitchen area, install crown molding in the living room, install laminated floor throughout apartment (not in bathroom) paint the area. | $30,000 |
| Oct 16, 2025 | In progress issued Oct 2025 | 18 Cragmont Av | Prosper Construction Dev Inc. | 2 bathroom remodels like for like, guest bathroom shower relacement like for like. master bath tub replacement like for like, fixture count to remain the same, no wall demolition or wall construction.Details
2 bathroom remodels like for like, guest bathroom shower relacement like for like. master bath tub replacement like for like, fixture count to remain the same, no wall demolition or wall construction. | $66,889 |
| Oct 16, 2025 | In progress issued Oct 2025 | 1140 Plymouth Av | Prosper Construction Dev Inc. | bathroom remodel, at 2nd floor. shower to shower replacement no change in plumbing fixture count, no wall demolition or wall constrution.Details
bathroom remodel, at 2nd floor. shower to shower replacement no change in plumbing fixture count, no wall demolition or wall constrution. | $30,000 |
| Aug 22, 2025 | Completed final sign-off Aug 2025 | 149 Capistrano Av | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa# 200206209579.Details
to obtain final inspection for work approved under pa# 200206209579. | |
| Aug 5, 2025 | Completed final sign-off Nov 2025 | 149 Capistrano Av | Prosper Construction Dev Inc. | refrence 202507100573, renovate e kitchen, add new bath (257 sf)Details
refrence 202507100573, renovate e kitchen, add new bath (257 sf) | $75,000 |
| Jul 25, 2025 | Completed final sign-off Feb 2026 | 45 Lucerne St | Prosper Construction Dev Inc., Allied Bay Contractors | 1st floor: add office room. convert half bath to full bath with shower.Details
1st floor: add office room. convert half bath to full bath with shower. | $50,000 |
| Jul 10, 2025 | Completed final sign-off Nov 2025 | 149 Capistrano Av | Prosper Construction Dev Inc. | bathroom remodel: 65 sq ft. shower pan (like for like).Details
bathroom remodel: 65 sq ft. shower pan (like for like). | $10,000 |
| Feb 27, 2025 | Completed final sign-off Nov 2025 | 560 Presidio Av | Prosper Construction Dev Inc. | unit #2: bathroom remodel like for likeDetails
unit #2: bathroom remodel like for like | $30,000 |
| Nov 21, 2024 | In progress issued Nov 2024 | 1536 Noe St | Prosper Construction Dev Inc. | 2 windows in the front replacement like for like. windows will be wood aluminum clad. no change to operationDetails
2 windows in the front replacement like for like. windows will be wood aluminum clad. no change to operation | $8,000 |
| Nov 20, 2024 | In progress issued Sep 2025 | 1242 19th Av | Prosper Construction Dev Inc. | fire repairs to entire building and comply with nov 2023-11201. no expansion of building.Details
fire repairs to entire building and comply with nov 2023-11201. no expansion of building. | $500,000 |
| Nov 13, 2024 | Completed final sign-off Nov 2024 | 489 30th St | Prosper Construction Dev Inc. | upper terrace - fix rain leak in external stairs, repair staircase tiles & flashing, repair waterproofing, repair stucco.Details
upper terrace - fix rain leak in external stairs, repair staircase tiles & flashing, repair waterproofing, repair stucco. | $15,000 |
| Jul 10, 2024 | Completed final sign-off Aug 2024 | 397 Valley St | Prosper Construction Dev Inc. | 1 bathroom remodel, like for likeDetails
1 bathroom remodel, like for like | $20,000 |
| Jul 3, 2024 | Completed final sign-off Jul 2025 | 401 West Portal Av | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa# 202210063865. all work is complete.Details
to obtain final inspection for work approved under pa# 202210063865. all work is complete. | |
| Jul 3, 2024 | Completed final sign-off Sep 2024 | 1295 Page St | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa# 2019-0517-0998Details
to obtain final inspection for work approved under pa# 2019-0517-0998 | |
| Jun 6, 2024 | Completed final sign-off Oct 2024 | 2363 35th Av | Prosper Construction Dev Inc. | 1 bath remodel and bathroom addition on 2/f.Details
1 bath remodel and bathroom addition on 2/f. | $50,000 |
| Apr 9, 2024 | Completed final sign-off Jun 2024 | 2447 Jackson St | Prosper Construction Dev Inc. | dry rot repair to the outside rear wall adjacent to new stairs (which was under a separate permit).Details
dry rot repair to the outside rear wall adjacent to new stairs (which was under a separate permit). | $15,000 |
| Apr 2, 2024 | In progress issued Apr 2024 | 1353 17th Av | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa# 202206307472. all work is complete.Details
to obtain final inspection for work approved under pa# 202206307472. all work is complete. | |
| Apr 2, 2024 | Completed final sign-off May 2024 | 1754 Grove St | Prosper Construction Dev Inc. | 100 sq ft siding repair like for like in the rear of the building. and 1 window damage trimming repair.Details
100 sq ft siding repair like for like in the rear of the building. and 1 window damage trimming repair. | $3,000 |
| Mar 26, 2024 | Completed final sign-off Oct 2024 | 3219 Laguna St | Prosper Construction Dev Inc. | replace 1 sink and 1 lavatory. replace tile in bathrooms. replace kitchenette cabinets, countertop and flooring 1200 sq ft replacement in-kind. install 1 outlet in the kitchenette. accessibility upgrades.Details
replace 1 sink and 1 lavatory. replace tile in bathrooms. replace kitchenette cabinets, countertop and flooring 1200 sq ft replacement in-kind. install 1 outlet in the kitchenette. accessibility upgrades. | $10,000 |
| Feb 29, 2024 | In progress issued Mar 2024 | 2449 Jackson St | Prosper Construction Dev Inc. | in kind stair replacement in rear yard due to dry rotDetails
in kind stair replacement in rear yard due to dry rot | $23,450 |
| Feb 29, 2024 | Completed final sign-off Mar 2025 | 2586 47th Av | Prosper Construction Dev Inc. | to obtain final inspection for work approved under pa# 2014-1023-9700. all work is complete.Details
to obtain final inspection for work approved under pa# 2014-1023-9700. all work is complete. | |
| Feb 26, 2024 | Completed final sign-off Mar 2025 | 401 Anderson St | Prosper Construction Dev Inc. | replace termite damage siding with new siding.Details
replace termite damage siding with new siding. | $15,000 |
| Feb 1, 2024 | Completed final sign-off Mar 2025 | 401 Anderson St | Prosper Construction Dev Inc. | (10) window replacement like for like - wood aluminum clad within existing openings. u = 0.30 maxDetails
(10) window replacement like for like - wood aluminum clad within existing openings. u = 0.30 max | $5,000 |
| Jan 25, 2024 | Completed final sign-off Feb 2024 | 757 39th Av | Prosper Construction Dev Inc. | 5 windows replacement like for like in front of the house. existing wood with top sash being divided lights as shown on google photo - proposed wood aluminum clad windows to match with fully simulated divided lights to match existing. google photo 2023Details
5 windows replacement like for like in front of the house. existing wood with top sash being divided lights as shown on google photo - proposed wood aluminum clad windows to match with fully simulated divided lights to match existing. google photo 2023 | $10,000 |
| Jan 16, 2024 | In progress issued Jan 2024 | 83 Sharon St | Prosper Construction Dev Inc. | revision to 2023120101824 revised structural details in repsonse to field condtionsDetails
revision to 2023120101824 revised structural details in repsonse to field condtions | |
| Dec 14, 2023 | In progress issued Jan 2024 | 841 Florida St | Prosper Construction Dev Inc. | 2/f: remodel (e) kitchen & bathroom, construct (n) bathroom, widen internal stairscase to be code compliant. 1/f: (n) bedroom, meida room, bathroom, relocate laundry, new bar sink. add 3 skylights on flat roofDetails
2/f: remodel (e) kitchen & bathroom, construct (n) bathroom, widen internal stairscase to be code compliant. 1/f: (n) bedroom, meida room, bathroom, relocate laundry, new bar sink. add 3 skylights on flat roof | $180,000 |
| Dec 13, 2023 | Completed final sign-off Jun 2024 | 149 Elsie St | Prosper Construction Dev Inc. | revision to pa# 2023-0307-3142 removal of reinforcing steel from special inspections. revision to structural details to reflect field condition installation changesDetails
revision to pa# 2023-0307-3142 removal of reinforcing steel from special inspections. revision to structural details to reflect field condition installation changes | |
| Dec 7, 2023 | Completed final sign-off Jul 2024 | 515 19th Av | Prosper Construction Dev Inc. | revision to permit 2023-1122-1322: cancelling one bathroom remodel- only doing two bathroomsDetails
revision to permit 2023-1122-1322: cancelling one bathroom remodel- only doing two bathrooms | |
| Dec 1, 2023 | Completed final sign-off Jul 2024 | 83 Sharon St | Prosper Construction Dev Inc. | in kind stair replacement in side yard due to dry rot.Details
in kind stair replacement in side yard due to dry rot. | $20,000 |
| Nov 22, 2023 | Completed final sign-off Jul 2024 | 515 19th Av | Prosper Construction Dev Inc. | 3 complete bathrooms remodels like for like, no wall or layout floor changes, two shower pans and one tub (replace in kind). no structural work.Details
3 complete bathrooms remodels like for like, no wall or layout floor changes, two shower pans and one tub (replace in kind). no structural work. | $60,000 |
| Nov 1, 2023 | Expired or cancelled expired Jul 2026 | 1073 Church St | Prosper Construction Dev Inc. | foundation retrofit at existing basement.Details
foundation retrofit at existing basement. | $20,000 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 1495 31st Av | Prosper Construction Dev Inc. | remodel (e) bottom of bay windowDetails
remodel (e) bottom of bay window | $5,000 |
| Oct 25, 2023 | Completed final sign-off Mar 2024 | 2204 Green St | Prosper Construction Dev Inc. | one bathroom remodel like for like: no walls or layout changeDetails
one bathroom remodel like for like: no walls or layout change | $25,000 |
| Oct 23, 2023 | Completed final sign-off Mar 2024 | 2155 Buchanan St | Prosper Construction Dev Inc. | 1 kitchen remodel like for likeDetails
1 kitchen remodel like for like | $20,000 |
| Oct 18, 2023 | In progress issued Sep 2025 | 1295 Holloway Av | Prosper Construction Dev Inc. | revision to pa# 201911016253 & 202205113984, (n) move inside walls, (n) garage foundation & framing, (n) structural drawing for the garage footing and calculation for shear walls and roof.Details
revision to pa# 201911016253 & 202205113984, (n) move inside walls, (n) garage foundation & framing, (n) structural drawing for the garage footing and calculation for shear walls and roof. | $6,000 |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 75 Lobos St | Prosper Construction Dev Inc. | roof repair for plywoodDetails
roof repair for plywood | $3,000 |
| Oct 2, 2023 | Never finaled issued Oct 2023, no final | 3012 Market St | Prosper Construction Dev Inc. | one complete bathroom remodel like for like tub to tub no walls/layout change.Details
one complete bathroom remodel like for like tub to tub no walls/layout change. | $25,000 |
| Sep 12, 2023 | Completed final sign-off Feb 2024 | 896 34th Av | Prosper Construction Dev Inc. | (1) kitchen remodel like for like - new subpanel 100 amp.Details
(1) kitchen remodel like for like - new subpanel 100 amp. | $30,000 |
| Sep 8, 2023 | Never finaled issued Sep 2023, no final | 1295 Holloway Av | Prosper Construction Dev Inc. | new stucco throughout house exterior. remove all (e) stucco and apply new.Details
new stucco throughout house exterior. remove all (e) stucco and apply new. | $15,000 |
| Sep 5, 2023 | Completed final sign-off Feb 2024 | 757 39th Av | Prosper Construction Dev Inc. | stucco - replacement for front of the house - like for like. roof replacement.Details
stucco - replacement for front of the house - like for like. roof replacement. | $5,000 |
| Aug 31, 2023 | Completed final sign-off Nov 2023 | 1458 Sutter St | Prosper Construction Dev Inc. | complete kitchen remodel like fo like, no walls or layout change.Details
complete kitchen remodel like fo like, no walls or layout change. | $15,000 |
| Aug 23, 2023 | Completed final sign-off Jan 2024 | 1495 31st Av | Prosper Construction Dev Inc. | revision to pa# 202209142446. remodel existing kitchen, remove island and relocate stove.Details
revision to pa# 202209142446. remodel existing kitchen, remove island and relocate stove. | |
| Aug 18, 2023 | Completed final sign-off Mar 2025 | 1578 47th Av | Prosper Construction Dev Inc. | interior remodel of (e) living space. relocate kitchen (from 2/f to g/f), living room, and dining room. remodel bedrooms and bathrooms.Details
interior remodel of (e) living space. relocate kitchen (from 2/f to g/f), living room, and dining room. remodel bedrooms and bathrooms. | $150,000 |
| Aug 14, 2023 | Completed final sign-off Aug 2026 | 162 27th Av | Prosper Construction Dev Inc., A2z Remodeling Inc. | revision to 201811095518. reduction in scope of work in which no 3rd fl addition in front of the house. retain infill entry stair but no lightwell change. retain 1st fl approved plans. retain 2nd fl kitchen but 2nd fl (e) bath change to two. retain 3rd fl master rd, master bath &Details
revision to 201811095518. reduction in scope of work in which no 3rd fl addition in front of the house. retain infill entry stair but no lightwell change. retain 1st fl approved plans. retain 2nd fl kitchen but 2nd fl (e) bath change to two. retain 3rd fl master rd, master bath & | |
| Aug 8, 2023 | Completed final sign-off Nov 2023 | 634 Edna St | Prosper Construction Dev Inc. | revision to 202302282743 & 202306069377. revise ceiling height for laundry area on 1st fl.Details
revision to 202302282743 & 202306069377. revise ceiling height for laundry area on 1st fl. | |
| Aug 8, 2023 | Completed final sign-off Oct 2023 | 3037 Cesar Chavez St | Prosper Construction Dev Inc. | to comply with complaint #202309723 item # 2 and 3: stucco damage- repair to stucco in front where needed. repair in kind.Details
to comply with complaint #202309723 item # 2 and 3: stucco damage- repair to stucco in front where needed. repair in kind. | $5,000 |
| Jul 31, 2023 | Completed final sign-off Oct 2023 | 1524 Pacific Av | Prosper Construction Dev Inc. | front bldg: removing existing tile from the deck and installing new tile with new water proof. 600 sq ft. replacement to be "in like-kind". all work is non-structural only. contact district building inspector at start of work. work not visible from street.Details
front bldg: removing existing tile from the deck and installing new tile with new water proof. 600 sq ft. replacement to be "in like-kind". all work is non-structural only. contact district building inspector at start of work. work not visible from street. | $5,000 |
| Jul 20, 2023 | Completed final sign-off Nov 2023 | 370 Church St | Prosper Construction Dev Inc. | #f: one complete bathroom remodel like for like, no walls or layout change. tub to shower pan.Details
#f: one complete bathroom remodel like for like, no walls or layout change. tub to shower pan. | $25,000 |
| Jul 17, 2023 | Completed final sign-off Nov 2023 | 1760 Ofarrell St | Prosper Construction Dev Inc. | unit #20: 2nd bathroom remodel and one kitchen remodel like for like, no walls or layout change. all work is non structural only.Details
unit #20: 2nd bathroom remodel and one kitchen remodel like for like, no walls or layout change. all work is non structural only. | $35,000 |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 3012 Market St | Prosper Construction Dev Inc. | one kitchen remodel like for like no walls or layout change.Details
one kitchen remodel like for like no walls or layout change. | $25,000 |
| Jul 17, 2023 | Expired or cancelled cancelled Aug 2023 | 149 Elsie St | Prosper Construction Dev Inc. | one complete bathroom remodel like for like no walls/layout change tub to tub. all work is non structural.Details
one complete bathroom remodel like for like no walls/layout change tub to tub. all work is non structural. | $25,000 |
| Jun 28, 2023 | Expired or cancelled expired Apr 2026 | 159 Miraloma Dr | Prosper Construction Dev Inc. | to comply with nov 20231532. re-building of (e) retaining wall for units 149-155-159 miraloma dr.Details
to comply with nov 20231532. re-building of (e) retaining wall for units 149-155-159 miraloma dr. | $50,000 |
| Jun 28, 2023 | Expired or cancelled expired Apr 2026 | 149 Miraloma Dr | Prosper Construction Dev Inc. | to comply with nov 20231531. re-building of (e) retaining wall for units 149-155-159 miraloma dr.Details
to comply with nov 20231531. re-building of (e) retaining wall for units 149-155-159 miraloma dr. | $50,000 |
| Jun 28, 2023 | Expired or cancelled expired Apr 2026 | 155 Miraloma Dr | Prosper Construction Dev Inc. | to comply with nov 20231519. re-building of (e) retaining wall for units 149-155-159 miraloma dr.Details
to comply with nov 20231519. re-building of (e) retaining wall for units 149-155-159 miraloma dr. | $50,000 |
| Jun 14, 2023 | Completed final sign-off Oct 2023 | 15 Red Rock Wy | Prosper Construction Dev Inc. | unit 102 - interior remodel @ 1st fl including partial demo of bearing wall. no work @ exterior of buildingDetails
unit 102 - interior remodel @ 1st fl including partial demo of bearing wall. no work @ exterior of building | $20,000 |
| Jun 13, 2023 | Completed final sign-off Nov 2023 | 230 07th St | Prosper Construction Dev Inc. | unit 102: convert existing interior non-bearing partition to window partition, replace existing single vanity w/new double vanities, add a door to the bedroom.Details
unit 102: convert existing interior non-bearing partition to window partition, replace existing single vanity w/new double vanities, add a door to the bedroom. | $8,000 |
| Jun 12, 2023 | Expired or cancelled cancelled Jan 2026 | 1222 33rd Av | Prosper Construction Dev Inc. | interior bathroom remodel of 194 sq. ft.Details
interior bathroom remodel of 194 sq. ft. | $25,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 887 28th Av | Prosper Construction Dev Inc. | partial kitchen remodel: kitchen and countertop replacement, recirculating hood and induction cooktop.Details
partial kitchen remodel: kitchen and countertop replacement, recirculating hood and induction cooktop. | $5,000 |
| Jun 6, 2023 | Completed final sign-off Nov 2023 | 634 Edna St | Prosper Construction Dev Inc. | structural revision to approved pa#: 202302282743. add new concrete foundation @ line-3 per field change condition (foundation work interior). add guard rail at rear yard.Details
structural revision to approved pa#: 202302282743. add new concrete foundation @ line-3 per field change condition (foundation work interior). add guard rail at rear yard. | $5,000 |
| May 26, 2023 | Never finaled issued May 2023, no final | 1760 Ofarrell St | Prosper Construction Dev Inc. | one bathroom remodel like for like. no walls or layout change.Details
one bathroom remodel like for like. no walls or layout change. | $20,000 |
| May 2, 2023 | Completed final sign-off Nov 2023 | 342 26th Av | Prosper Construction Dev Inc. | replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen.Details
replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen. | $125,000 |
| Apr 10, 2023 | Completed final sign-off Aug 2024 | 2266 48th Av | Prosper Construction Dev Inc. | rev to pa# 202303304721: interior remodel in 1st fl. remodel (e) family room, bathroom, repair (e) slabDetails
rev to pa# 202303304721: interior remodel in 1st fl. remodel (e) family room, bathroom, repair (e) slab | $8,000 |
| Apr 6, 2023 | Never finaled issued Apr 2023, no final | 3425 Quintara St | Prosper Construction Dev Inc. | interior remodel on 2nd fl to widen wall opening in living room, one non-bearing wallDetails
interior remodel on 2nd fl to widen wall opening in living room, one non-bearing wall | $8,000 |
| Mar 30, 2023 | Completed final sign-off Aug 2024 | 2266 48th Av | Prosper Construction Dev Inc. | 1st flr: interior remodel of existing family room, bathroom, repair existing slab.Details
1st flr: interior remodel of existing family room, bathroom, repair existing slab. | $50,000 |
| Mar 30, 2023 | Expired or cancelled expired Mar 2026 | 401 Anderson St | Prosper Construction Dev Inc. | structural revision to pa 2022-1103-5797 - install new concrete footing per change conditionDetails
structural revision to pa 2022-1103-5797 - install new concrete footing per change condition | $20,000 |
| Mar 7, 2023 | Completed final sign-off Jun 2024 | 149 Elsie St | Prosper Construction Dev Inc. | kitchen remodel-remove interior partition wall, install n cabinets, countertops, applicanes, fixtures & finishes. no exterior work.Details
kitchen remodel-remove interior partition wall, install n cabinets, countertops, applicanes, fixtures & finishes. no exterior work. | $50,000 |