Kelsey Foster
- Listed as
- engineer
- Firm
- Verdant Structural Engineers
- Based in
- Berkeley
- On San Francisco permits
- Apr 2021 to Sep 2026
7 permits since 2000 (engineer on 7 permits): 2 completed, 3 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 4348 17th St | Level 21 Construction Company | reinforcement floor sructure below kitchen area with concrete piers, post and beams per structural drawings. (prepared by verdant structural engineers)Details
reinforcement floor sructure below kitchen area with concrete piers, post and beams per structural drawings. (prepared by verdant structural engineers) | $12,000 |
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 55 Valparaiso St | Prosper Construction Dev Inc. | (2) new roof decks addition. new roof access. new lot line windows. planning record number 2025-010306prjDetails
(2) new roof decks addition. new roof access. new lot line windows. planning record number 2025-010306prj | $30,000 |
| Oct 8, 2025 | In progress issued Oct 2025 | 53 Valparaiso St | common area. create 10' shear wall . remove sheetrock/drywall between apartment & hallway, replace in kind, 1hr rated min. remove rotten wood & replace. reinforce as sheer wall per plansDetails
common area. create 10' shear wall . remove sheetrock/drywall between apartment & hallway, replace in kind, 1hr rated min. remove rotten wood & replace. reinforce as sheer wall per plans | $5,000 | |
| May 12, 2025 | Completed final sign-off Jan 2026 | 723 27th St | Elemental Homeworks | remodel kitchen, reframe rough opening for window, rear door, passage to dining room, and hall. install (n) electrical, plumbing, appliances, luminares and oak flooring. install 2 doors, and 5 windows (2 facing street). replace (e) hvac with (n) heat pump for heating and cooling. install (n) heatDetails
remodel kitchen, reframe rough opening for window, rear door, passage to dining room, and hall. install (n) electrical, plumbing, appliances, luminares and oak flooring. install 2 doors, and 5 windows (2 facing street). replace (e) hvac with (n) heat pump for heating and cooling. install (n) heat | $500,000 |
| Apr 8, 2024 | Completed final sign-off May 2025 | 210 Casitas Av | Art Of Italy Inc Dba: Aoi Group | 3 story remodel. extend kitchen into alcove hall-remove wall towards stairs & add railing. repace one window in dining & living room. replace one window w/ lift slide door. create storage loft above entry in existing attic space. storage room- reinforce flooring structureDetails
3 story remodel. extend kitchen into alcove hall-remove wall towards stairs & add railing. repace one window in dining & living room. replace one window w/ lift slide door. create storage loft above entry in existing attic space. storage room- reinforce flooring structure | $122,500 |
| Oct 21, 2021 | Never finaled issued Oct 2021, no final | 610 16th Av | Redican Homes | revision to pa 2020-0211-4124 s1. remove proposed steel beam & footings in garage. existing structural post to remainDetails
revision to pa 2020-0211-4124 s1. remove proposed steel beam & footings in garage. existing structural post to remain | |
| Apr 8, 2021 | Never finaled issued Jun 2021, no final | 569 Duboce Av | Harte Building & Design Inc. | widening the (e)7'-6" garage door to 9'-0". replace in-kind (e) exterior door, 2(e) exterior windows at the rearside of the house. replace 2(e) exterior doors at rear. repair & replace portion of (e) concreate sluab & foundation. remove non-structural (e) interior walls & add (n) interior partition.Details
widening the (e)7'-6" garage door to 9'-0". replace in-kind (e) exterior door, 2(e) exterior windows at the rearside of the house. replace 2(e) exterior doors at rear. repair & replace portion of (e) concreate sluab & foundation. remove non-structural (e) interior walls & add (n) interior partition. | $300,000 |