Adam Winig
- Listed as
- architect, authorized agent-others, designer
- Firm
- Arcsine Architecture
- Based in
- Oakland
- On San Francisco permits
- Jan 2006 to Mar 2022
25 permits since 2000 (architect on 23 permits, authorized agent-others on 1 permit, designer on 1 permit): 15 completed, 5 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2022 | Completed final sign-off Nov 2023 | 432 Powell St | Centric Construction Inc | lower level demo interior finish & non-structural. former scala's bistro location. no ceiling demo is included in this permit. per ab-017a permit showing accessability will be submitted with t.i. permit.Details
lower level demo interior finish & non-structural. former scala's bistro location. no ceiling demo is included in this permit. per ab-017a permit showing accessability will be submitted with t.i. permit. | $20,000 |
| Oct 19, 2021 | Expired or cancelled cancelled Jan 2026 | 230 California St | 5/f suite 510: interior tenant improvment. 2 new private offices and 1 conference room. no mechanical, plumbing or structural work. no work or damage to existing window or mullions.Details
5/f suite 510: interior tenant improvment. 2 new private offices and 1 conference room. no mechanical, plumbing or structural work. no work or damage to existing window or mullions. | $15,000 | |
| Aug 6, 2020 | Expired or cancelled withdrawn May 2023 | 599 Skyline Bl | Terra Nova Industries | interior remodel of (e) restaurant w/ new kitchen & bar, grease hood, walk-in cooler, warewashing station, dishwashing hood and associated mep-removal of structural columns & associated structural work- new floor, wall & ceiling finishes and new lighting & hvac in dining spaces.Details
interior remodel of (e) restaurant w/ new kitchen & bar, grease hood, walk-in cooler, warewashing station, dishwashing hood and associated mep-removal of structural columns & associated structural work- new floor, wall & ceiling finishes and new lighting & hvac in dining spaces. | $4,500,000 |
| Jun 30, 2020 | Expired or cancelled cancelled May 2023 | 599 Skyline Bl | Terra Nova Industries | per ab-017, area of work to remian closed during demolition. scope of work includes demo of: (e) non-load bearing partitions & ceilings, (e)floor and wall finishes, (e) kitchen and bar equipments.Details
per ab-017, area of work to remian closed during demolition. scope of work includes demo of: (e) non-load bearing partitions & ceilings, (e)floor and wall finishes, (e) kitchen and bar equipments. | $20,000 |
| Dec 26, 2019 | Never finaled issued Aug 2020, no final | 599 Skyline Bl | Terra Nova Industries | basement level exterior window replacement with new door; provide new guardrail around existing exterior stair from first floor; exterior paved patio on grade at new basement level door;Details
basement level exterior window replacement with new door; provide new guardrail around existing exterior stair from first floor; exterior paved patio on grade at new basement level door; | $50,000 |
| Apr 19, 2016 | Never finaled issued Aug 2017, no final | 440 Geary St | Bryan J. Valverde Co, Plant Construction Co, Lp | remove (e) awning and associated signs.Details
remove (e) awning and associated signs. | |
| Apr 19, 2016 | Never finaled issued May 2019, no final | 440 Geary St | Bryan J. Valverde Co | remove direct illumination, electric, wall, project, double face, existing sign.Details
remove direct illumination, electric, wall, project, double face, existing sign. | $500 |
| Apr 18, 2016 | Never finaled issued Nov 2016, no final | 333 Ofarrell St | Cw Horton General Contractor | new plumbing and finishes for 389 guestroms in tower 2 on floor 7-23. n/a for maher ordinance no.155-13.Details
new plumbing and finishes for 389 guestroms in tower 2 on floor 7-23. n/a for maher ordinance no.155-13. | $4,862,415 |
| Mar 3, 2016 | Completed final sign-off Dec 2016 | 333 Ofarrell St | Cw Horton General Contractor | interior renovation ground floor promenade, tower 1 elevator lobby, and executive conference center. ti includes new finishes, lighting, furniture, and millwork. no mech and elec maher not reqDetails
interior renovation ground floor promenade, tower 1 elevator lobby, and executive conference center. ti includes new finishes, lighting, furniture, and millwork. no mech and elec maher not req | $353,457 |
| May 12, 2015 | Completed final sign-off Oct 2015 | 2 New Montgomery St | Plant Construction Co, Lp | g/f -addition of accessible counter at lobby & redirection of employee access to back of house spaces; maher n/aDetails
g/f -addition of accessible counter at lobby & redirection of employee access to back of house spaces; maher n/a | $5,000 |
| Feb 12, 2015 | Completed final sign-off Jul 2015 | 2 New Montgomery St | Plant Construction Co, Lp | convert (e) luggage room into vanilla tenant space for retail. space remain vacant for future tenant. n/a maher ordinanceDetails
convert (e) luggage room into vanilla tenant space for retail. space remain vacant for future tenant. n/a maher ordinance | $100,000 |
| Dec 19, 2013 | Completed final sign-off Mar 2014 | 501 Delancey St | Bbc Construction Inc. | renovate units 608 & 609 to allow for bathroom for accessibilty. mep to be design build. gross floor area reduced in unit 609 is less than 25% of total area. not combining units. (combine (2) restroom to make (1) restroom.) all work in building #9.Details
renovate units 608 & 609 to allow for bathroom for accessibilty. mep to be design build. gross floor area reduced in unit 609 is less than 25% of total area. not combining units. (combine (2) restroom to make (1) restroom.) all work in building #9. | $65,000 |
| Oct 17, 2013 | Never finaled issued Nov 2013, no final | 333 Ofarrell St | Cw Horton General Contractor | commercial tenant improvement to (e) lobby cafe, no mechanical of plumbing, new casework & finishes.Details
commercial tenant improvement to (e) lobby cafe, no mechanical of plumbing, new casework & finishes. | $20,000 |
| Aug 21, 2013 | Completed final sign-off Apr 2015 | 333 Ofarrell St | renovation of 566 guest rooms in tower 1 on floors 7 - 44. this is inclusive of (n) plumbing fixtures at (e) locations. all new finishes & (n) light fixtures with equal wattage (or less) at (e) locations. mechanical system to remain.Details
renovation of 566 guest rooms in tower 1 on floors 7 - 44. this is inclusive of (n) plumbing fixtures at (e) locations. all new finishes & (n) light fixtures with equal wattage (or less) at (e) locations. mechanical system to remain. | $2,600,000 | |
| Aug 15, 2013 | Expired or cancelled expired May 2015 | 2146 Chestnut St | Field Construction Inc. | interior renovation to include new finishes millwork and modifications to existing electrical & plumbing systemsDetails
interior renovation to include new finishes millwork and modifications to existing electrical & plumbing systems | $100,000 |
| Mar 26, 2012 | Completed final sign-off Aug 2012 | 314 Sutter St | Terra Nova Industries | cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit.Details
cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit. | $130,000 |
| Sep 28, 2011 | Completed final sign-off Feb 2013 | 3970 17th St | Field Construction Inc. | minimal tenant improvement of extg space. includes new point of save counter, kitchen equipment and guest seating. extg lighting to remain, replace decorative pendants with equal wattage new pendants.Details
minimal tenant improvement of extg space. includes new point of save counter, kitchen equipment and guest seating. extg lighting to remain, replace decorative pendants with equal wattage new pendants. | $115,000 |
| Aug 4, 2011 | Completed final sign-off Jul 2012 | 333 Ofarrell St | interior non struc remodel of 498guest rooms in tower #3. remodfel bathrooms and interior finishes. new unit entry door on all 550 rooms in tower#3. all existing mechanical system to remain. all restroom lighting shall be high-efficacy or occupancy sensor control per cec 150(k). verify door listingDetails
interior non struc remodel of 498guest rooms in tower #3. remodfel bathrooms and interior finishes. new unit entry door on all 550 rooms in tower#3. all existing mechanical system to remain. all restroom lighting shall be high-efficacy or occupancy sensor control per cec 150(k). verify door listing | $5,000,000 | |
| Jun 1, 2011 | Completed final sign-off Oct 2011 | 1483 Mason St | Field Construction Inc. | remodel existing kitchen space including equipment upgrades, minor modifications to back storage area, addition of pass through window from prep area to hot lineDetails
remodel existing kitchen space including equipment upgrades, minor modifications to back storage area, addition of pass through window from prep area to hot line | $18,000 |
| May 4, 2011 | Completed final sign-off Nov 2011 | 2170 Mission St | J M E Construction Services Inc | remodel of (e) restaurant space: includes new accessible restrooms, kitchen, dining, bar, & micro-brewing space. storefront renovation has been submitted to the city planning dept under separate pa #201103303153.Details
remodel of (e) restaurant space: includes new accessible restrooms, kitchen, dining, bar, & micro-brewing space. storefront renovation has been submitted to the city planning dept under separate pa #201103303153. | $165,000 |
| Nov 12, 2010 | Completed final sign-off Jan 2011 | 333 Kearny St | Ward Alan Emery Construction Inc. | new ceiling height non-structural partitions. mep under separate permit.Details
new ceiling height non-structural partitions. mep under separate permit. | $48,000 |
| Mar 16, 2010 | Completed final sign-off Mar 2011 | 55 Cambon Dr | renovate (e) 1st flr for new & basement food preparation & service establishment. new business will be self-service/take away food establishment. no change of use to space. (n) mech., plumb. & elect. (n) accessible restroom will be added. no exterior work and no struct. mod. to (e) bldg.Details
renovate (e) 1st flr for new & basement food preparation & service establishment. new business will be self-service/take away food establishment. no change of use to space. (n) mech., plumb. & elect. (n) accessible restroom will be added. no exterior work and no struct. mod. to (e) bldg. | $132,324 | |
| Nov 17, 2008 | Completed final sign-off Jan 2009 | 333 Ofarrell St | convert (e) vacant cafe to office space upgrade lightingDetails
convert (e) vacant cafe to office space upgrade lighting | $20,000 | |
| May 19, 2008 | Completed final sign-off Jul 2009 | 1818 Lombard St | owner improvement to e 1st floor storage space. convert 1st floor storage to outpatient doctors office. office to include 1 office, 3 patient rooms, wiating room, restroom, storage, and laundry. excavate 1st floor, lower entry door and window, add window on west sideDetails
owner improvement to e 1st floor storage space. convert 1st floor storage to outpatient doctors office. office to include 1 office, 3 patient rooms, wiating room, restroom, storage, and laundry. excavate 1st floor, lower entry door and window, add window on west side | $160,000 | |
| Jan 20, 2006 | Expired or cancelled withdrawn Sep 2006 | 1224 09th Av | convert extg retail space to full service restaurant new storefront at 1st floor only site permitDetails
convert extg retail space to full service restaurant new storefront at 1st floor only site permit | $50,000 |