58 permits since 2000 (engineer on 50 permits, architect on 8 permits): 35 completed, 15 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1151 Sutter St | Ward-Tek Inc. | in kind repairs to unit 402, due to fire water damage. finishes, wireing. wall framing at roof stairwell.Details
in kind repairs to unit 402, due to fire water damage. finishes, wireing. wall framing at roof stairwell. | $60,500 |
| Aug 20, 2026 | In progress issued Sep 2026 | 1422 25th Av | Giuliani Construction Incorp | in-kind repair to all units (2) due to fire/water damage. roof siding(north) repair. no change to plumbing fixture count.Details
in-kind repair to all units (2) due to fire/water damage. roof siding(north) repair. no change to plumbing fixture count. | $400,000 |
| Jun 2, 2026 | In progress issued Aug 2026 | 3017 20th St | Habitat For Humanity >Sf(Exempt By Btrc | fire repairs to existing units and nov resolution. rebuild roof, floor assemblies, foundation, and mep per plans.Details
fire repairs to existing units and nov resolution. rebuild roof, floor assemblies, foundation, and mep per plans. | $704,000 |
| May 14, 2026 | In progress issued May 2026 | 98 Harrington St | in kind repair to garage due to vehicle impact, and roof structure. to comply with nov 202650239.Details
in kind repair to garage due to vehicle impact, and roof structure. to comply with nov 202650239. | $22,000 | |
| Apr 30, 2026 | In progress issued Jun 2026 | 267 Niagara Av | Kevin Lin Construction Inc | in kind repairs to single family dwelling due to fire & water damage. add kitchenette (2 burners) at lower level. replace windows at front, in kind. no change to size, location, or material.Details
in kind repairs to single family dwelling due to fire & water damage. add kitchenette (2 burners) at lower level. replace windows at front, in kind. no change to size, location, or material. | $20,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 331 Spruce St | Mark Scott Construction Inc | in-kind repairs to common area (breezeway & garage). repairs to breezeway include siding, windows & stairwell. repairs to garage include drywall, finishes & doors. *no repairs visible from street. all in kind.Details
in-kind repairs to common area (breezeway & garage). repairs to breezeway include siding, windows & stairwell. repairs to garage include drywall, finishes & doors. *no repairs visible from street. all in kind. | $235,000 |
| Mar 17, 2026 | In progress issued Apr 2026 | 26 Crestline Dr | Ward-Tek Inc. | unit # 5, 6, 8, 10: in kind repairs to units due to fire damage. ok to comply with nov 202544077Details
unit # 5, 6, 8, 10: in kind repairs to units due to fire damage. ok to comply with nov 202544077 | $750,000 |
| Jan 15, 2026 | In progress issued Jun 2026 | 37 Cook St | All Property Tech Llc., Krueger Bros Builders Inc., Cbs Construction Inc. | fire damage repairs. fix hole on roof. replace interior finishes as needed. reset plubming fixtures, rewire top floor at area of fire. replace one wall standing furnace. work to be perform at units 37,39 and 39a.lower unit to have all floor repalacement.Details
fire damage repairs. fix hole on roof. replace interior finishes as needed. reset plubming fixtures, rewire top floor at area of fire. replace one wall standing furnace. work to be perform at units 37,39 and 39a.lower unit to have all floor repalacement. | $45,000 |
| Dec 23, 2025 | In progress filed Dec 2025, not yet issued | 1701 Yosemite Av | to comply with nov#: 202538869. in-kind repairs to restaurant at 1st level and residential unit at second level (due to fire) with accesibility upgrades.Details
to comply with nov#: 202538869. in-kind repairs to restaurant at 1st level and residential unit at second level (due to fire) with accesibility upgrades. | $480,000 | |
| Nov 25, 2025 | In progress issued Mar 2026 | 2 Appleton Av | The Restoration Cleanup Co Inc | all units: remodel and rebuild kitchen and bathroom in areas affected by fire damage. repairs to units 2, 4 & 8 to include finishes, drywall, floorings in-kind; repairs to unit 6 to include (exterior) framing, in-kind; no change to layout or sq ft. not visible from street.to comply with his202538819Details
all units: remodel and rebuild kitchen and bathroom in areas affected by fire damage. repairs to units 2, 4 & 8 to include finishes, drywall, floorings in-kind; repairs to unit 6 to include (exterior) framing, in-kind; no change to layout or sq ft. not visible from street.to comply with his202538819 | $350,000 |
| Jul 30, 2025 | In progress issued Nov 2025 | 3126 22nd St | Mark Scott Construction Inc | fire damage repair like for like kind and quality with code upgrades, electrical, plumbing and finishes in compliance with nov #202430052 abatementDetails
fire damage repair like for like kind and quality with code upgrades, electrical, plumbing and finishes in compliance with nov #202430052 abatement | $200,000 |
| Jul 17, 2025 | Completed final sign-off Dec 2025 | 639 45th Av | Mission Home Remodeling Inc | front door stairway: remove and replace the stair and landing assembly per plan. provide new footing per plan.Details
front door stairway: remove and replace the stair and landing assembly per plan. provide new footing per plan. | $42,000 |
| Jun 20, 2025 | Completed final sign-off Jul 2026 | 501 Minnesota St | Ward-Tek Inc. | in kind repairs to warehouseDetails
in kind repairs to warehouse | $250,000 |
| Mar 14, 2025 | Completed final sign-off May 2026 | 157 West Portal Av | Ibuild Construction & Renovations Inc | fire repairs to first and 2nd levels, in-kind.Details
fire repairs to first and 2nd levels, in-kind. | $491,000 |
| Dec 4, 2024 | Completed final sign-off Dec 2025 | 58 Carmelita St | S C Anderson Group International Inc. | revision to 202307182404: provide detail of porch framing & front view detail 2/s2.2Details
revision to 202307182404: provide detail of porch framing & front view detail 2/s2.2 | |
| Nov 27, 2024 | Completed final sign-off Dec 2025 | 2225 Taraval St | Universe Alliance Inc Dba Universe Cons | repair of wind damaged wall on the south elevation. not visible from street.Details
repair of wind damaged wall on the south elevation. not visible from street. | $56,780 |
| Nov 20, 2024 | In progress issued Sep 2025 | 1242 19th Av | Prosper Construction Dev Inc. | fire repairs to entire building and comply with nov 2023-11201. no expansion of building.Details
fire repairs to entire building and comply with nov 2023-11201. no expansion of building. | $500,000 |
| Oct 31, 2024 | Completed final sign-off Oct 2025 | 830 Sargent St | Ward-Tek Inc. | in kind interior & exterior repairs due to fire damage. repair doors, windows, roof & meps.Details
in kind interior & exterior repairs due to fire damage. repair doors, windows, roof & meps. | $150,000 |
| Oct 15, 2024 | Expired or cancelled withdrawn Sep 2025 | 1242 19th Av | fire repairs workshop at lower level, to include relocation of entry door. with associated mep. to resolve comply with nov #202311201.Details
fire repairs workshop at lower level, to include relocation of entry door. with associated mep. to resolve comply with nov #202311201. | $175,000 | |
| Sep 25, 2024 | In progress filed Sep 2024, not yet issued | 1875 Mission St | Giuliani Construction Incorp | install new security gate at exterior of building.Details
install new security gate at exterior of building. | |
| Aug 15, 2024 | Completed final sign-off Feb 2025 | 1364 Underwood Av | Valley Restoration Services Inc | replace ceiling drywall, paint, replace stucco on front porch; replace window on porch entry (exterior side of stairs); install 2x6 per plans on upper part of residence; replace roof cevering @ porch and rear (2 squares total) (small fire repair) install insulation in atticDetails
replace ceiling drywall, paint, replace stucco on front porch; replace window on porch entry (exterior side of stairs); install 2x6 per plans on upper part of residence; replace roof cevering @ porch and rear (2 squares total) (small fire repair) install insulation in attic | $50,000 |
| May 1, 2024 | In progress issued Oct 2025 | 1410 Thomas Av | Ward-Tek Inc. | 971 sf. fire demage repair - remove & replace demaged roofing,roof sheating,refters,windows,doors,stucco,drywall,insultation all per plan. test elect & replace demage. test plumbing,remove & replace damaged cabinets & fixtures, add smoke & carborn monoxide detectors.Details
971 sf. fire demage repair - remove & replace demaged roofing,roof sheating,refters,windows,doors,stucco,drywall,insultation all per plan. test elect & replace demage. test plumbing,remove & replace damaged cabinets & fixtures, add smoke & carborn monoxide detectors. | $150,000 |
| Apr 25, 2024 | Completed final sign-off Feb 2025 | 3150 03rd St | Webcor Construction Lp | emergency repair to abate nov replace corrugated exterior siding and stucco finishes per plan. replace exterior brick finishes at right of entry and over reinforced concrete staircase per plan.. replace railing in kind. repair e roof framing. replace diagonal steel pipe struts and connection at canoDetails
emergency repair to abate nov replace corrugated exterior siding and stucco finishes per plan. replace exterior brick finishes at right of entry and over reinforced concrete staircase per plan.. replace railing in kind. repair e roof framing. replace diagonal steel pipe struts and connection at cano | $10,000 |
| Mar 27, 2024 | In progress issued Apr 2024 | 530 Funston Av | Giuliani Construction Incorp | revision to pa#202306281100: replace decking with deck membrane systemDetails
revision to pa#202306281100: replace decking with deck membrane system | $100 |
| Feb 28, 2024 | Completed final sign-off Mar 2025 | 1377 Florida St | Giuliani Construction Incorp | revision to pa 202309186792 replace damaged wall sheathing, studs and top/bottom plates in south & south eastern walls. replace interior wall finishes, insulatuion, windows. 1377 remove non-compliant fire escapeDetails
revision to pa 202309186792 replace damaged wall sheathing, studs and top/bottom plates in south & south eastern walls. replace interior wall finishes, insulatuion, windows. 1377 remove non-compliant fire escape | $50,000 |
| Feb 1, 2024 | Completed final sign-off Aug 2025 | 606 Buchanan St | Ward-Tek Inc. | fire repair with interior remodel. remodel to include new partitions, wall layouts, and new den and bathroom. associated mep work. new windows and doors. all work on the first floor onlyDetails
fire repair with interior remodel. remodel to include new partitions, wall layouts, and new den and bathroom. associated mep work. new windows and doors. all work on the first floor only | $250,000 |
| Sep 18, 2023 | Completed final sign-off Mar 2025 | 1377 Florida St | Giuliani Construction Incorp | revision to pa# 202303012840. dryrot repairs. unit #1379: in-kind replacement of wall framing in dining, bath, living, & front bedroom. unit #1381: replace wall framing in living, hall, bath. replace portions of deck framing. unit #1377: fire damage repair. replace int wall finishes, insulation/Details
revision to pa# 202303012840. dryrot repairs. unit #1379: in-kind replacement of wall framing in dining, bath, living, & front bedroom. unit #1381: replace wall framing in living, hall, bath. replace portions of deck framing. unit #1377: fire damage repair. replace int wall finishes, insulation/ | $100,000 |
| Aug 14, 2023 | Completed final sign-off Mar 2025 | 1377 Florida St | Giuliani Construction Incorp | legalization of existing dwelling unit at top floor. remodel/upgrade kitchen & laundry area.adu per ordinance #95-17Details
legalization of existing dwelling unit at top floor. remodel/upgrade kitchen & laundry area.adu per ordinance #95-17 | $30,000 |
| Jul 18, 2023 | Completed final sign-off Dec 2025 | 58 Carmelita St | S C Anderson Group International Inc. | in-kind fire repair: rr damaged insulation, finishes & drwall throughout residence. replace damaged roof & floor framing only. replace exterior doors, windows & siding. to comply with nov202303631.Details
in-kind fire repair: rr damaged insulation, finishes & drwall throughout residence. replace damaged roof & floor framing only. replace exterior doors, windows & siding. to comply with nov202303631. | $500,000 |
| Jul 6, 2023 | Completed final sign-off Dec 2025 | 100 Rae Av | Astorga Construction Inc | in-kind repairs due to fire. remove & replace interior drywall, finishes & insulation. replace window (not street facing). remove damaged electrical wiring & replace back to panel. replace plumbing fixtures & ducting. to comply w/ nov202302264. remove (e) range at lower lvl & install 2 range cooktopDetails
in-kind repairs due to fire. remove & replace interior drywall, finishes & insulation. replace window (not street facing). remove damaged electrical wiring & replace back to panel. replace plumbing fixtures & ducting. to comply w/ nov202302264. remove (e) range at lower lvl & install 2 range cooktop | $350,000 |
| Jul 5, 2023 | Completed final sign-off Oct 2024 | 606 Buchanan St | Ward-Tek Inc. | in kind replacement of rear egress stairwall due to fire. stairwell located in common areaDetails
in kind replacement of rear egress stairwall due to fire. stairwell located in common area | $175,000 |
| Jul 5, 2023 | Completed final sign-off Oct 2024 | 600 Buchanan St | Ward-Tek Inc. | to comply with nov 202296831 & 202296869 in kind replacement of rear egress stairwall due to fire. stairwell located in common areaDetails
to comply with nov 202296831 & 202296869 in kind replacement of rear egress stairwall due to fire. stairwell located in common area | $175,000 |
| Jun 28, 2023 | Never finaled issued Jun 2023, no final | 530 Funston Av | Giuliani Construction Incorp | in-kind repair due to fire damage. repair wall assembly at garage. replace damaged floor finishes at family room. replace wiring back to panel. replace fau, water heater and ductwork.Details
in-kind repair due to fire damage. repair wall assembly at garage. replace damaged floor finishes at family room. replace wiring back to panel. replace fau, water heater and ductwork. | $83,000 |
| Jun 13, 2023 | Completed final sign-off Jun 2024 | 606 Buchanan St | Ward-Tek Inc. | revision to bpa# 202303163814, install new 1/2 bath in masterDetails
revision to bpa# 202303163814, install new 1/2 bath in master | $25,000 |
| Jun 6, 2023 | Expired or cancelled expired Aug 2026 | 1314 Hayes St | Ward-Tek Inc. | fire damage repair. remove/replace interior drywall, finishes & insulation throughout, replace window, electrical wiring back to panel, plumbing fixtures. all repairs in-kind. no exterior wall repair work, those walls to remain. replace roof.Details
fire damage repair. remove/replace interior drywall, finishes & insulation throughout, replace window, electrical wiring back to panel, plumbing fixtures. all repairs in-kind. no exterior wall repair work, those walls to remain. replace roof. | $450,000 |
| Jun 1, 2023 | Completed final sign-off Jan 2025 | 1316 Hayes St | Ward-Tek Inc. | work proposed on middle floor only (#1316). replace damaged interior wall finishes, drywall, insulation & electrical wiring. replace window & exterior finishes. all repairs in-kind located at kitchen, bathrooms. also remodel kitchen approx. 203sf, bath #1-49 sf, bath #2-20 sf.Details
work proposed on middle floor only (#1316). replace damaged interior wall finishes, drywall, insulation & electrical wiring. replace window & exterior finishes. all repairs in-kind located at kitchen, bathrooms. also remodel kitchen approx. 203sf, bath #1-49 sf, bath #2-20 sf. | $100,000 |
| May 31, 2023 | Completed final sign-off Mar 2024 | 2880 Golden Gate Av | Matthew Kelly Construction Inc | fire damage repair in kind. remove and replace roof sheathing, shingles and windows (not visible to front). emove and replace insulation drywall and finshes.Details
fire damage repair in kind. remove and replace roof sheathing, shingles and windows (not visible to front). emove and replace insulation drywall and finshes. | $170,000 |
| May 5, 2023 | Completed final sign-off Aug 2024 | 240 03rd Av | Ati Restoration Llc | to commply with bid nov#202298114, repair fire damaged areas on roof, replace insulation/drywall, minor roof framing on rafters, new electrical subpanel/plumbing work/plan, install new kitchen cabinets in upper/lower units, in-kind. added by appicant windows at front facade to be replaced with woodDetails
to commply with bid nov#202298114, repair fire damaged areas on roof, replace insulation/drywall, minor roof framing on rafters, new electrical subpanel/plumbing work/plan, install new kitchen cabinets in upper/lower units, in-kind. added by appicant windows at front facade to be replaced with wood | $300,000 |
| Apr 10, 2023 | Completed final sign-off Feb 2024 | 601 Fell St | Mcmahon Construction | water damage repair and resolution of nov 202171894. remove and replace damaged drywall, insulation, finishes, etc. reconfigure flr plan at 3/f bathroom. replace damaged electrical wiring to panel. replace (e) plumbing fixtures. remove (e) wooden portion of fence to meet 3' max height.Details
water damage repair and resolution of nov 202171894. remove and replace damaged drywall, insulation, finishes, etc. reconfigure flr plan at 3/f bathroom. replace damaged electrical wiring to panel. replace (e) plumbing fixtures. remove (e) wooden portion of fence to meet 3' max height. | $211,000 |
| Mar 29, 2023 | Never finaled issued Apr 2023, no final | 417 10th Av | Valley Restoration Services Inc | replace insulation & drywall, windows and doors repair roof framing and sheathing in kind remove (e) walls and provide new header, minor remodel of both units replace wall frame in # 417 with new fau & locate fau of #419 replac elec wiring to panel replace plumbing fixtures in kindDetails
replace insulation & drywall, windows and doors repair roof framing and sheathing in kind remove (e) walls and provide new header, minor remodel of both units replace wall frame in # 417 with new fau & locate fau of #419 replac elec wiring to panel replace plumbing fixtures in kind | $275,000 |
| Mar 16, 2023 | Completed final sign-off Jun 2024 | 606 Buchanan St | Ward-Tek Inc. | fire damage repair. remove and replace damaged drywall, insulation, wall framing, etc. replace windows/door at rear. all repairs are in kind to match pre fire appearance.Details
fire damage repair. remove and replace damaged drywall, insulation, wall framing, etc. replace windows/door at rear. all repairs are in kind to match pre fire appearance. | $150,000 |
| Mar 16, 2023 | Completed final sign-off Jun 2024 | 608 Buchanan St | Ward-Tek Inc. | fire damage repair. remove and replace damaged drywall, insulation, wall framing, etc. replace windows/door at rear. all repairs are in kind to match pre fire appearance.Details
fire damage repair. remove and replace damaged drywall, insulation, wall framing, etc. replace windows/door at rear. all repairs are in kind to match pre fire appearance. | $150,000 |
| Mar 7, 2023 | Expired or cancelled cancelled Jan 2026 | 1290 Rhode Island St | unit 21 - vehicle damage repair. remove & replace damaged drywall & insulation, in-kind replace. damaged wall framing & replace window.Details
unit 21 - vehicle damage repair. remove & replace damaged drywall & insulation, in-kind replace. damaged wall framing & replace window. | $75,000 | |
| Mar 1, 2023 | Completed final sign-off Mar 2025 | 1379 Florida St | Giuliani Construction Incorp | fire restoration. to comply w/nov 202292411. unit# 1379 & 1381: remove & replace interior finishes, insulation. replace windows & doors in-kind; remove & replace plumbing fixt., fau, in-kind; replace electrical wiring.Details
fire restoration. to comply w/nov 202292411. unit# 1379 & 1381: remove & replace interior finishes, insulation. replace windows & doors in-kind; remove & replace plumbing fixt., fau, in-kind; replace electrical wiring. | $300,000 |
| Feb 28, 2023 | Completed final sign-off Sep 2024 | 2872 Golden Gate Av | Ward-Tek Inc. | to comply with nov 202298175. fire repair/replacement in kind. remove and replace damaged drywall, finishes in-kind. replace roof framing, windows. replace damaged faus, wiring, ductwork, plumbing and electrical fixtures.Details
to comply with nov 202298175. fire repair/replacement in kind. remove and replace damaged drywall, finishes in-kind. replace roof framing, windows. replace damaged faus, wiring, ductwork, plumbing and electrical fixtures. | $150,000 |
| Feb 7, 2023 | Never finaled issued Mar 2023, no final | 1934 Palou Av | Valley Restoration Services Inc | fire restoration with minor remodel (kitchen) remove and replace finishes, framing,windows and doors, replace wiring backto panel. replace fau and water heater in kind replace plumbing fixtures in-kindDetails
fire restoration with minor remodel (kitchen) remove and replace finishes, framing,windows and doors, replace wiring backto panel. replace fau and water heater in kind replace plumbing fixtures in-kind | $500,000 |
| Dec 29, 2022 | Completed final sign-off Dec 2024 | 600 Buchanan St | Lindquist Custom Construction Inc | fire damage repair to partially comply w/ nov 202296831. #600:repair ceiling finishes,drywall,insulation. replace 3 rear windows in kind. #602:replace finishes & 2 windows in kind. relocate bathroom. #604: replace roof framing & finishes in kind. ext. rear deck&stair repair under separate permit.Details
fire damage repair to partially comply w/ nov 202296831. #600:repair ceiling finishes,drywall,insulation. replace 3 rear windows in kind. #602:replace finishes & 2 windows in kind. relocate bathroom. #604: replace roof framing & finishes in kind. ext. rear deck&stair repair under separate permit. | $300,000 |
| Dec 29, 2022 | Completed final sign-off Jan 2024 | 1274 Girard St | Ward-Tek Inc. | water damage repair w/ kitchen remodel: replace insulation & ceiling finshes, remove & replace wall finishes & insulation, remove kitchen wall & install new header. install kitchen range hood & remove existing brick fireplace & install gas insert, reconfigure interior walls for bathrm expansionDetails
water damage repair w/ kitchen remodel: replace insulation & ceiling finshes, remove & replace wall finishes & insulation, remove kitchen wall & install new header. install kitchen range hood & remove existing brick fireplace & install gas insert, reconfigure interior walls for bathrm expansion | $60,000 |
| Nov 23, 2022 | Completed final sign-off Apr 2024 | 580 Fell St | Ward-Tek Inc. | to resolve nov# 202296810: fire repair/replacement in-kind. remove damaged ceiling & roof framing, replace in-kind. new sheathing & roofing. replace int finishes, insulation, wall framing, floor finishes. replace wall furnace & fau/ducting. replace damaged wiring back to panel. replace (1) window @Details
to resolve nov# 202296810: fire repair/replacement in-kind. remove damaged ceiling & roof framing, replace in-kind. new sheathing & roofing. replace int finishes, insulation, wall framing, floor finishes. replace wall furnace & fau/ducting. replace damaged wiring back to panel. replace (1) window @ | $150,000 |
| Nov 22, 2022 | Completed final sign-off Oct 2024 | 3970 San Bruno Av | Ward-Tek Inc. | to resolve nov 202296691: replace porch roof structure in-kind. reinstall undamaged wall framing & replace garage door & opening. replace damaged floor framing & finishes at porch stairs. rebuild masonary wall & damaged wall framing.Details
to resolve nov 202296691: replace porch roof structure in-kind. reinstall undamaged wall framing & replace garage door & opening. replace damaged floor framing & finishes at porch stairs. rebuild masonary wall & damaged wall framing. | $150,000 |
| Sep 26, 2022 | Completed final sign-off Mar 2024 | 118 Arleta Av | Ward-Tek Inc. | to comply nov 202182804. shore existing roof framing, remove and replace damaged wall framing and finishes, in kind. remove (e) floor finishes, in kind. provide new footing under replaced wall. vehicle impactDetails
to comply nov 202182804. shore existing roof framing, remove and replace damaged wall framing and finishes, in kind. remove (e) floor finishes, in kind. provide new footing under replaced wall. vehicle impact | $51,000 |
| Sep 12, 2022 | Never finaled issued Oct 2022, no final | 141 Noe St | fire repair floors 1-4. roof: remove e fire damage over top floor bedroom and living room, new roof where needed. remove and replace int wall finishes, insulation, electric, wall framing, exterior wall finishes. fau/ductwork to comply with nov 202289658Details
fire repair floors 1-4. roof: remove e fire damage over top floor bedroom and living room, new roof where needed. remove and replace int wall finishes, insulation, electric, wall framing, exterior wall finishes. fau/ductwork to comply with nov 202289658 | $40,000 | |
| Sep 8, 2022 | Completed final sign-off Jul 2023 | 3663 17th St | H C L Construction Inc. | to comply with nov# 202290676 and 202290684. remove damaged roof framing over unit 3663. replace in-kind roof structure. install new roof sheathing.Details
to comply with nov# 202290676 and 202290684. remove damaged roof framing over unit 3663. replace in-kind roof structure. install new roof sheathing. | $150,000 |
| Jun 2, 2022 | Completed final sign-off Apr 2024 | 4440 Mission St | Ward-Tek Inc. | repair and replace stairs at rear of building in kind, due to collapse. stairs are at exterior of building. minor exterior lighting for dismantled and installed for repairs. repair/replace in kind.Details
repair and replace stairs at rear of building in kind, due to collapse. stairs are at exterior of building. minor exterior lighting for dismantled and installed for repairs. repair/replace in kind. | $50,000 |
| Mar 3, 2022 | Completed final sign-off Mar 2023 | 2076 Mcallister St | Ward-Tek Inc. | fire restoration:(2078) repair roof at fire access hole. replace 5 windows (2 front).new drywall, insulation & electrical wiring.strip &replae floor finishes.replace wall heater & plumbing fixtures in-kind.(2076): repair interior plaster finishes on ceiling.replace p & elec fixtures in-kind.Details
fire restoration:(2078) repair roof at fire access hole. replace 5 windows (2 front).new drywall, insulation & electrical wiring.strip &replae floor finishes.replace wall heater & plumbing fixtures in-kind.(2076): repair interior plaster finishes on ceiling.replace p & elec fixtures in-kind. | $300,000 |
| Feb 25, 2022 | Completed final sign-off Oct 2023 | 134 Dublin St | Mark Scott Construction Inc | comply with nov 2021179199, replace damaged wall assembly around entry, powder room. replace floor joists and sheating, replace 1 window,1 skylight, 1 door in entry passageway. legalize powder room at ground floor.Details
comply with nov 2021179199, replace damaged wall assembly around entry, powder room. replace floor joists and sheating, replace 1 window,1 skylight, 1 door in entry passageway. legalize powder room at ground floor. | $229,000 |
| Nov 23, 2021 | Never finaled issued Jan 2022, no final | 49 Capp St | Ward-Tek Inc. | demolition of exterior bathroom and structure. associated electrical and plumbing work (demo) to be performed. approx. 50sf.Details
demolition of exterior bathroom and structure. associated electrical and plumbing work (demo) to be performed. approx. 50sf. | $2,500 |
| Aug 31, 2021 | Completed final sign-off Nov 2022 | 49 Capp St | Future General Construction Inc, Ward-Tek Inc. | fire repair 2 unit dwelling: unit 49: replace wall framing footings. interior finishes, elec. windows and doors. water heater, plumbing fixt in kind. replace damaged floor/sheathing in kind . unit 51, wtr htr,plumb fixt in kind,fire rated ceiling utility rm, repair foundationDetails
fire repair 2 unit dwelling: unit 49: replace wall framing footings. interior finishes, elec. windows and doors. water heater, plumbing fixt in kind. replace damaged floor/sheathing in kind . unit 51, wtr htr,plumb fixt in kind,fire rated ceiling utility rm, repair foundation | $50,000 |