Block 1555, lot 042
530 Funston Ave
- City’s use
- Single Family Residential
- Built
- 1912
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,713 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 10, 2025 | Completed final sign-off Dec 2025 | 530 Funston Av | Giuliani Construction Incorp | to obtain final inspection for work approved under pa 202306281100. all work is complete.Details
to obtain final inspection for work approved under pa 202306281100. all work is complete. | |
| Mar 27, 2024 | In progress issued Apr 2024 | 530 Funston Av | Giuliani Construction Incorp | revision to pa#202306281100: replace decking with deck membrane systemDetails
revision to pa#202306281100: replace decking with deck membrane system | $100 |
| Dec 11, 2023 | Completed final sign-off Jan 2024 | 530 Funston Av | Lifetime Roofing & Renovation Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Jun 28, 2023 | Never finaled issued Jun 2023, no final | 530 Funston Av | Giuliani Construction Incorp | in-kind repair due to fire damage. repair wall assembly at garage. replace damaged floor finishes at family room. replace wiring back to panel. replace fau, water heater and ductwork.Details
in-kind repair due to fire damage. repair wall assembly at garage. replace damaged floor finishes at family room. replace wiring back to panel. replace fau, water heater and ductwork. | $83,000 |
| Aug 30, 2007 | Never finaled issued Sep 2007, no final | 530 Funston Av | Canyon Construction | revision to pa# 2007.08.13.9551. all work on basement level. convert full bath room to half bath. keep (e) exterior doors and windows. keep (e) location of door btn garage and storage room. move door from staircase.Details
revision to pa# 2007.08.13.9551. all work on basement level. convert full bath room to half bath. keep (e) exterior doors and windows. keep (e) location of door btn garage and storage room. move door from staircase. | |
| Aug 13, 2007 | Completed final sign-off Nov 2007 | 530 Funston Av | Canyon Construction | create habitable space in the lowest story by converting about 409 square feet of unconditioned space - 367 sf for a home office and about 42 sf for a bathroom.Details
create habitable space in the lowest story by converting about 409 square feet of unconditioned space - 367 sf for a home office and about 42 sf for a bathroom. | $60,000 |
| Jan 25, 2005 | Never finaled issued Jan 2005, no final | 530 Funston Av | sidewalkDetails
sidewalk | ||
| Sep 29, 2000 | Expired or cancelled expired Mar 2001 | 530 Funston Av | install new kitchen cabinets and fixtures, repair miscelaneous non structural, dry rot & repair plasDetails
install new kitchen cabinets and fixtures, repair miscelaneous non structural, dry rot & repair plas | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Giuliani Construction Incorp (3), Canyon Construction (2), Lifetime Roofing & Renovation Inc
- Engineers
- Abraham Lynn (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.