The Restoration Cleanup Co Inc
- Based in
- Pittsburg
- On San Francisco permits
- Sep 2022 to Sep 2026
- Last 24 months
- 4 permits filed
5 permits since 2000: 1 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 437 Goettingen St | drywall for bedrooms, carpet, paint. 3 replacement windows and siding at side of property.Details
drywall for bedrooms, carpet, paint. 3 replacement windows and siding at side of property. | $32,710 |
| Nov 25, 2025 | In progress issued Mar 2026 | 2 Appleton Av | all units: remodel and rebuild kitchen and bathroom in areas affected by fire damage. repairs to units 2, 4 & 8 to include finishes, drywall, floorings in-kind; repairs to unit 6 to include (exterior) framing, in-kind; no change to layout or sq ft. not visible from street.to comply with his202538819Details
all units: remodel and rebuild kitchen and bathroom in areas affected by fire damage. repairs to units 2, 4 & 8 to include finishes, drywall, floorings in-kind; repairs to unit 6 to include (exterior) framing, in-kind; no change to layout or sq ft. not visible from street.to comply with his202538819 | $350,000 |
| Aug 25, 2025 | In progress issued Sep 2025 | 252 16th Av | demolition & repair all fire affected damaged areas: garage walls and ceiling. install insulation and drywall in kind with 5/8" type x sheetrock. application of primer base and painting. post construction cleaning.Details
demolition & repair all fire affected damaged areas: garage walls and ceiling. install insulation and drywall in kind with 5/8" type x sheetrock. application of primer base and painting. post construction cleaning. | $10,000 |
| Jul 7, 2025 | In progress issued Jul 2025 | 3350 Taraval St | to comply w/ nov 202538146: framing roof area due to fire damage. replace transon & double door due to fire damage. electrical services and penal replace due to fire damage. plumbing-copper lines replace dur to fire. drywall due to fire damageDetails
to comply w/ nov 202538146: framing roof area due to fire damage. replace transon & double door due to fire damage. electrical services and penal replace due to fire damage. plumbing-copper lines replace dur to fire. drywall due to fire damage | $100,000 |
| Sep 13, 2022 | Completed final sign-off Sep 2022 | 208 Lexington St | selective demolition and structure cleaning after the fire. start of work inspection required.Details
selective demolition and structure cleaning after the fire. start of work inspection required. | $58,000 |