Block 3553, lot 044
49 Capp St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,354 sq ft
- Lot
- 3,598 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
2 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 23, 2021 | Never finaled issued Jan 2022, no final | 49 Capp St | Ward-Tek Inc. | demolition of exterior bathroom and structure. associated electrical and plumbing work (demo) to be performed. approx. 50sf.Details
demolition of exterior bathroom and structure. associated electrical and plumbing work (demo) to be performed. approx. 50sf. | $2,500 |
| Aug 31, 2021 | Completed final sign-off Nov 2022 | 49 Capp St | Future General Construction Inc, Ward-Tek Inc. | fire repair 2 unit dwelling: unit 49: replace wall framing footings. interior finishes, elec. windows and doors. water heater, plumbing fixt in kind. replace damaged floor/sheathing in kind . unit 51, wtr htr,plumb fixt in kind,fire rated ceiling utility rm, repair foundationDetails
fire repair 2 unit dwelling: unit 49: replace wall framing footings. interior finishes, elec. windows and doors. water heater, plumbing fixt in kind. replace damaged floor/sheathing in kind . unit 51, wtr htr,plumb fixt in kind,fire rated ceiling utility rm, repair foundation | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ward-Tek Inc. (2), Future General Construction Inc
- Engineers
- Abraham Lynn (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.