Peter J. Sandlin
- Listed as
- architect, engineer
- Firm
- Barrish Pelham
- Based in
- Pleasant Hill
- On San Francisco permits
- May 2015 to Nov 2022
6 permits since 2000 (engineer on 5 permits, architect on 1 permit): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 23, 2022 | Completed final sign-off Apr 2024 | 580 Fell St | Ward-Tek Inc. | to resolve nov# 202296810: fire repair/replacement in-kind. remove damaged ceiling & roof framing, replace in-kind. new sheathing & roofing. replace int finishes, insulation, wall framing, floor finishes. replace wall furnace & fau/ducting. replace damaged wiring back to panel. replace (1) window @Details
to resolve nov# 202296810: fire repair/replacement in-kind. remove damaged ceiling & roof framing, replace in-kind. new sheathing & roofing. replace int finishes, insulation, wall framing, floor finishes. replace wall furnace & fau/ducting. replace damaged wiring back to panel. replace (1) window @ | $150,000 |
| Jun 3, 2022 | Completed final sign-off Sep 2022 | 2529 Fillmore St | Mark Scott Construction Inc | deck repair - less than 50 repair; remove & replace ceramic tile blacony; remove & replace interior wall finish frame per planDetails
deck repair - less than 50 repair; remove & replace ceramic tile blacony; remove & replace interior wall finish frame per plan | $30,000 |
| Nov 13, 2019 | Completed final sign-off Nov 2021 | 2902 23rd St | Foremost Builders Inc | remove and replace damaged interior finishes, insulation, doors, restroom and interior hallway due to fire damage. match with pre fire appearance. remove and replace roofing to match pre fire appearance. skylights. ramp for ada accessDetails
remove and replace damaged interior finishes, insulation, doors, restroom and interior hallway due to fire damage. match with pre fire appearance. remove and replace roofing to match pre fire appearance. skylights. ramp for ada access | $150,000 |
| Jul 11, 2018 | Completed final sign-off Mar 2019 | 1007 Shotwell St | Ward-Tek Inc. | #101: fire repairs to (e) apt bld/some structural damage to wood framed roof structures and walls/r&r all int finishes/complete rewire unit w/new 100amp sub panel/replace insul/drywall-walls &ceiling/replace matching wood windows/putback as was/replace new furnace & ductwork/replair plm fix/repl appDetails
#101: fire repairs to (e) apt bld/some structural damage to wood framed roof structures and walls/r&r all int finishes/complete rewire unit w/new 100amp sub panel/replace insul/drywall-walls &ceiling/replace matching wood windows/putback as was/replace new furnace & ductwork/replair plm fix/repl app | $150,000 |
| Oct 4, 2017 | Completed final sign-off Feb 2019 | 622 Clarendon Av | fire damage repair: remove (e) roof trusses, partial siding, damanged joist & studs. install (n) roof, siding, rear windows, joist, stucs, electrical wiring, insulation, drywall, kitchen cbinets & appliances, bathroom fixtures, lighting, flooring. scope of work to comply with nov#201756314:Details
fire damage repair: remove (e) roof trusses, partial siding, damanged joist & studs. install (n) roof, siding, rear windows, joist, stucs, electrical wiring, insulation, drywall, kitchen cbinets & appliances, bathroom fixtures, lighting, flooring. scope of work to comply with nov#201756314: | $180,000 | |
| May 5, 2015 | Completed final sign-off Jun 2016 | 85 Paradise Av | American Technologies Inc | perform floor joist framing, subfloor, interior 2x4 framing, reglazing of windows, mechanical, electrical & plumbing near moderate fire damage. finish out interior to include cabinets, drywall, insulation, flooring, painting, appliances, fixture in order to return to preloss condition.Details
perform floor joist framing, subfloor, interior 2x4 framing, reglazing of windows, mechanical, electrical & plumbing near moderate fire damage. finish out interior to include cabinets, drywall, insulation, flooring, painting, appliances, fixture in order to return to preloss condition. | $60,000 |