Foremost Builders Inc
- Based in
- Newcastle
- On San Francisco permits
- Nov 2019 to Mar 2026
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2026 | In progress issued Aug 2026 | 551 Nevada St | structural repair at the south wall for vehicle impact damage and asbestos abatement of exterior siding at the south wall (to comply with nov#202649875).0.Details
structural repair at the south wall for vehicle impact damage and asbestos abatement of exterior siding at the south wall (to comply with nov#202649875).0. | $75,000 |
| Nov 13, 2019 | Completed final sign-off Nov 2021 | 2902 23rd St | remove and replace damaged interior finishes, insulation, doors, restroom and interior hallway due to fire damage. match with pre fire appearance. remove and replace roofing to match pre fire appearance. skylights. ramp for ada accessDetails
remove and replace damaged interior finishes, insulation, doors, restroom and interior hallway due to fire damage. match with pre fire appearance. remove and replace roofing to match pre fire appearance. skylights. ramp for ada access | $150,000 |