George Wesely
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- 2v Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to May 2026
97 permits since 2000 (architect on 90 permits, authorized agent-others on 2 permits, engineer on 2 permits, attorney on 1 permit, designer on 1 permit, pmt consultant/expediter on 1 permit): 75 completed, 1 in progress, 11 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 7, 2026 | In progress filed May 2026, not yet issued | 172 Landers St | Proano Construction | interior remodel to both units of an existing duplex . remodel existing kitchens, bedrooms, bathrooms, laundry, & dining. new rear horizontal addition to both units. new rear deck and exterior stairs. all new windows. new skylights. new front entry steps & gate.Details
interior remodel to both units of an existing duplex . remodel existing kitchens, bedrooms, bathrooms, laundry, & dining. new rear horizontal addition to both units. new rear deck and exterior stairs. all new windows. new skylights. new front entry steps & gate. | $650,000 |
| Feb 7, 2025 | Completed final sign-off Oct 2025 | 1013 Castro St | Proano Construction | replace (e) rotten & warped treads & risers for (e) exterior entry stairs. add concrete-lined storage under stairs. no interior work, no increase to bldg footprint.Details
replace (e) rotten & warped treads & risers for (e) exterior entry stairs. add concrete-lined storage under stairs. no interior work, no increase to bldg footprint. | $15,000 |
| Dec 13, 2024 | Completed final sign-off Feb 2025 | 4225 Lawton St | revision to pa # 202411265715 rebuild inkind (e) rotted out front ext stairs. (e) guardrails & handrails to remain. no interior work no work on (e) bldg footprintDetails
revision to pa # 202411265715 rebuild inkind (e) rotted out front ext stairs. (e) guardrails & handrails to remain. no interior work no work on (e) bldg footprint | ||
| Jul 27, 2023 | Completed final sign-off Aug 2024 | 1013 Castro St | Proano Construction | rev to pa202107013554-s1: expand rear portion of (e) dormer. not visible from street. no work on front facade. no increase to bldg footprint. no increase to bldg height above (e) roof ridge.Details
rev to pa202107013554-s1: expand rear portion of (e) dormer. not visible from street. no work on front facade. no increase to bldg footprint. no increase to bldg height above (e) roof ridge. | $9,000 |
| Jan 5, 2022 | Completed final sign-off Nov 2022 | 569 03rd Av | Mizen Construction Inc | interior remodel within (e) upper unit. remodel (e) kitchen & bathroom. add new bathroom & side window. new skylights. no work on lower unit. no added sqft. no change to envelope & ext facade.Details
interior remodel within (e) upper unit. remodel (e) kitchen & bathroom. add new bathroom & side window. new skylights. no work on lower unit. no added sqft. no change to envelope & ext facade. | $250,000 |
| Jan 5, 2022 | Completed final sign-off Jan 2024 | 133 Stanyan St | Bravo Building Co Inc | remodel existing kitchen. infill existing internal courtyard. new skylights. no alteration of exterior envelope. no alteration of exterior facades.Details
remodel existing kitchen. infill existing internal courtyard. new skylights. no alteration of exterior envelope. no alteration of exterior facades. | $250,000 |
| Nov 23, 2021 | Expired or cancelled cancelled Mar 2023 | 255 10th Av | raise (e) building 18" (vertical addition), add (n) garage to basement, infill at rear facade (rear horizontal addition), add (n) roof dormers at rear, add (n) roof decks at rear. interior: general interior remodel throughout all floorsDetails
raise (e) building 18" (vertical addition), add (n) garage to basement, infill at rear facade (rear horizontal addition), add (n) roof dormers at rear, add (n) roof decks at rear. interior: general interior remodel throughout all floors | $750,000 | |
| Jul 1, 2021 | Completed final sign-off Aug 2024 | 1013 Castro St | Proano Construction | new kitchen, powder rm, office, stair on 2nd floor. new bedroom & closet on 3rd floor. raise plate hts & flatten back appro 14'-5" portion of (e) rear gable roof. new flat roof & parapet to be no higher than (e) roof ridge. not visible from street. new rear facing windows on raised back portion ofDetails
new kitchen, powder rm, office, stair on 2nd floor. new bedroom & closet on 3rd floor. raise plate hts & flatten back appro 14'-5" portion of (e) rear gable roof. new flat roof & parapet to be no higher than (e) roof ridge. not visible from street. new rear facing windows on raised back portion of | $60,000 |
| Nov 30, 2020 | Completed final sign-off Sep 2021 | 33 Stoneman St | Custom Construction Enterprises | revision to pa #2020-0630-9361: replace (e) foundation & slab where (e) conditions are structurally unsound. (n) media room @ back of (e) garage. relocate (2) (e) skylights, add (1) (n) skylight.Details
revision to pa #2020-0630-9361: replace (e) foundation & slab where (e) conditions are structurally unsound. (n) media room @ back of (e) garage. relocate (2) (e) skylights, add (1) (n) skylight. | $10,000 |
| Oct 1, 2020 | Completed final sign-off Oct 2022 | 766 40th Av | Proano Construction | (n) adu on 1st fl, completely w/in footprint of(e)bldg. (n)adu qualifies for non-waivers from planning code per ord #95-17. 1st fl adu replaces 1st fl scope of work on currently approved pa #201707313380. cost calculation based on add'l cost over(e)permit. no change to(e)bldg footprint front facadeDetails
(n) adu on 1st fl, completely w/in footprint of(e)bldg. (n)adu qualifies for non-waivers from planning code per ord #95-17. 1st fl adu replaces 1st fl scope of work on currently approved pa #201707313380. cost calculation based on add'l cost over(e)permit. no change to(e)bldg footprint front facade | $10,000 |
| Sep 12, 2020 | Completed final sign-off Nov 2022 | 345 Miramar Av | Proano Construction | revision to pa# 201810243996. scope reduction: existing lower stairs to remain. no new skylights. floor plan simplified.Details
revision to pa# 201810243996. scope reduction: existing lower stairs to remain. no new skylights. floor plan simplified. | |
| Jul 31, 2019 | Completed final sign-off Oct 2019 | 615 Sanchez St | Z Construction Company Inc | revsion to 201902132821. remove 1 bedroom to adu unit. scope reductionDetails
revsion to 201902132821. remove 1 bedroom to adu unit. scope reduction | |
| Jul 31, 2019 | Completed final sign-off Aug 2020 | 2474 Great Hy | Elikan Construction Inc, Unicon Construction Solutions Llc | interior remodel to both units of extg duplex, remodel to extg kitchen, bath, add new laundry to each unit. no added square footage, no increase to extg envelope.Details
interior remodel to both units of extg duplex, remodel to extg kitchen, bath, add new laundry to each unit. no added square footage, no increase to extg envelope. | $90,000 |
| Jun 5, 2019 | Never finaled issued Sep 2021, no final | 36 Delano Av | Mizen Construction Inc | (n) (3) story rear addition: (n) 1st fl family room, laundry, bath; (n) 2nd fl breakfast nook, stair; (n) 3rd fl master suite. (n) roof dormer, (n) rear deck. no change to front facadeDetails
(n) (3) story rear addition: (n) 1st fl family room, laundry, bath; (n) 2nd fl breakfast nook, stair; (n) 3rd fl master suite. (n) roof dormer, (n) rear deck. no change to front facade | $200,000 |
| Apr 19, 2019 | Completed final sign-off May 2019 | 1231 Douglass St | disable (e) overhead roll down doors at former pl. sep openings: 3 total openings 1 on 1st, 2 on 2/f.Details
disable (e) overhead roll down doors at former pl. sep openings: 3 total openings 1 on 1st, 2 on 2/f. | $1,350 | |
| Apr 9, 2019 | Expired or cancelled suspend Aug 2025 | 2445 Pacific Av | legalization of (e) ground fl conditions. scope includes living space behind garage, including remodeled bath, laundry, family room, stairs. existing slab to be replaced & lowered. partiallay infill 9e) covered breezeway. new rear windows.Details
legalization of (e) ground fl conditions. scope includes living space behind garage, including remodeled bath, laundry, family room, stairs. existing slab to be replaced & lowered. partiallay infill 9e) covered breezeway. new rear windows. | $250,000 | |
| Mar 19, 2019 | Completed final sign-off Apr 2021 | 569 03rd Av | Mrcc | new rear yard deck & stairs to grade off upper unit. new deck doors within existing window opening. no work on int of unit, lower unit, front facade. no expansion of ext envelope or added sq footage.Details
new rear yard deck & stairs to grade off upper unit. new deck doors within existing window opening. no work on int of unit, lower unit, front facade. no expansion of ext envelope or added sq footage. | $10,000 |
| Feb 13, 2019 | Expired or cancelled expired Mar 2026 | 615 Sanchez St | Z Construction Company Inc | adu ord #95-17. conversion of (e) living space into adu on basement floor of (e) single family home. (n) adu scope includes (n) kitchen, (n) bedroom/closet, (n) fire rated separations as req'd. no increase to gross building area envelopeDetails
adu ord #95-17. conversion of (e) living space into adu on basement floor of (e) single family home. (n) adu scope includes (n) kitchen, (n) bedroom/closet, (n) fire rated separations as req'd. no increase to gross building area envelope | $25,000 |
| Jul 20, 2018 | Completed final sign-off Apr 2019 | 523 17th Av | Mrcc | new 3rd fl master bath/closet. new exterior window at front, wood double hung, no added square footage, no increase to exterior envelopeDetails
new 3rd fl master bath/closet. new exterior window at front, wood double hung, no added square footage, no increase to exterior envelope | $50,000 |
| Mar 19, 2018 | Completed final sign-off Jan 2019 | 2668 Vallejo St | Upscale Construction Inc. | restore previously removed window @ 3rd flr rear/east side of bld. no work to front exterior. no increase to bld envelope, no added sf maher naDetails
restore previously removed window @ 3rd flr rear/east side of bld. no work to front exterior. no increase to bld envelope, no added sf maher na | $5,000 |
| Jul 5, 2017 | Completed final sign-off Oct 2018 | 2785 Jackson St | Citidev Inc. | unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13Details
unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13 | $40,000 |
| May 31, 2017 | Completed final sign-off Nov 2017 | 1215 27th Av | Custom Construction Enterprises | interior remodel - remodel 2nd floor kitchen & bath. remodel 3rd floor - bath, master suite. exterior remodel - replace rear facade windwos, 2 new skylightsDetails
interior remodel - remodel 2nd floor kitchen & bath. remodel 3rd floor - bath, master suite. exterior remodel - replace rear facade windwos, 2 new skylights | $75,000 |
| Apr 21, 2017 | Completed final sign-off Aug 2019 | 36 Commonwealth Av | Colindres & Associates | 1/f: (n) rebuilt stair at same location; 2/f: relocate kitchen, n powder rm,bath relocated; 3/f: (n) full bathrm, (n) laundry rm; foundation - ref.#201701257867 (new perimeter foundation/lower slab)Details
1/f: (n) rebuilt stair at same location; 2/f: relocate kitchen, n powder rm,bath relocated; 3/f: (n) full bathrm, (n) laundry rm; foundation - ref.#201701257867 (new perimeter foundation/lower slab) | $600,000 |
| Mar 13, 2017 | Completed final sign-off Aug 2017 | 228 Chattanooga St | Proano Construction | new replacement inkind of (e) rear egress deck & stairs. no change to (e) configuration beyond code compliance. no work on (e) bldg, no increase to bldg envelope, no change to front facadeDetails
new replacement inkind of (e) rear egress deck & stairs. no change to (e) configuration beyond code compliance. no work on (e) bldg, no increase to bldg envelope, no change to front facade | $9,000 |
| Feb 7, 2017 | Expired or cancelled expired Jul 2024 | 670 12th Av | Harte Building & Design Inc. | new roof deck at front roof. no expansion of bld envelope. no added sq footage.additional scope to bpa #2016/1014/0322Details
new roof deck at front roof. no expansion of bld envelope. no added sq footage.additional scope to bpa #2016/1014/0322 | $5,000 |
| Oct 14, 2016 | Completed final sign-off Dec 2018 | 670 12th Av | Harte Building & Design Inc. | interior remodel on all existing floors, replace exterior windows, new skylights, new roof deck over e roof at rear, replace rear deck, removeal of bay window at rear, partial lightwell infillDetails
interior remodel on all existing floors, replace exterior windows, new skylights, new roof deck over e roof at rear, replace rear deck, removeal of bay window at rear, partial lightwell infill | $600,000 |
| Sep 8, 2016 | Expired or cancelled cancelled Jan 2026 | 1455 Lake St | (e) window replacement/alteration, no work to interior of bldg. no added sq. footage or change to footprint.Details
(e) window replacement/alteration, no work to interior of bldg. no added sq. footage or change to footprint. | $10,000 | |
| Jul 12, 2016 | Completed final sign-off Nov 2018 | 1455 Lake St | Proano Construction | upper unit only -interior remodel: new kitchen, bath, laundry, and stair. replacement of exterior windows. lightwell infill. new roof deck. alteration to rear facade.Details
upper unit only -interior remodel: new kitchen, bath, laundry, and stair. replacement of exterior windows. lightwell infill. new roof deck. alteration to rear facade. | $500,000 |
| May 5, 2016 | Completed final sign-off Sep 2019 | 70 Webster St | Zhizhao Liu Construction Co | add living space to g/f behind (e) garage as part of lower 2nd flr unit(new family,bath/bedrm) add (n) mezzanine living space in (e) attic as part of upper 3rd flr unit (new loft,bath,bedrm)- new roof dormers. new roof deck. replace (e) rear egress stair.Details
add living space to g/f behind (e) garage as part of lower 2nd flr unit(new family,bath/bedrm) add (n) mezzanine living space in (e) attic as part of upper 3rd flr unit (new loft,bath,bedrm)- new roof dormers. new roof deck. replace (e) rear egress stair. | $150,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | Finbarr Collins Construction Inc., Traube Construction Company | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Apr 28, 2016 | Completed final sign-off Apr 2020 | 232 18th Av | Quinlan Construction | exterior: (n) rear horizontal addition, (n) rear deck, (n) recessed front entry, replace (e) front windows. interior: expanded kitchen, dining on ground floor, master suite/office, laundry, bath on 2nd fl.Details
exterior: (n) rear horizontal addition, (n) rear deck, (n) recessed front entry, replace (e) front windows. interior: expanded kitchen, dining on ground floor, master suite/office, laundry, bath on 2nd fl. | $300,000 |
| Apr 25, 2016 | Completed final sign-off Oct 2019 | 70 Webster St | Wing Construction Co. | foundation replacement around perimeter of building with new slab.Details
foundation replacement around perimeter of building with new slab. | $80,000 |
| Feb 19, 2016 | Completed final sign-off Apr 2016 | 35 La Grande Av | rev. to (e) pa#201207205437, modification of exterior windows & material & garage. 1) garage door modification & exterior windows & door modification. a3.1 door. 2) material modification-stucco, moeiridq5ion a3.1. 3) eliminate closet in entry & 2/f a2.1Details
rev. to (e) pa#201207205437, modification of exterior windows & material & garage. 1) garage door modification & exterior windows & door modification. a3.1 door. 2) material modification-stucco, moeiridq5ion a3.1. 3) eliminate closet in entry & 2/f a2.1 | ||
| Feb 19, 2016 | Completed final sign-off Oct 2016 | 71 Germania St | Custom Construction Enterprises | lower existing slab & add living space @ existing basement: new office, new full bath, new laundry closet, new stair, new foundation as necessary. remodel (e) 2nd floor bath. replace windows on rear facade, new radiant heat system.Details
lower existing slab & add living space @ existing basement: new office, new full bath, new laundry closet, new stair, new foundation as necessary. remodel (e) 2nd floor bath. replace windows on rear facade, new radiant heat system. | $110,000 |
| Sep 14, 2015 | Never finaled issued Sep 2015, no final | 67 Melrose Av | E - 5 Construction Inc | revision to app#201504143618. scope reduction: remove rear infill, remove cantilever balcony, revise stair. no relocation of kitchen.Details
revision to app#201504143618. scope reduction: remove rear infill, remove cantilever balcony, revise stair. no relocation of kitchen. | |
| Jun 24, 2015 | Completed final sign-off May 2016 | 484 Day St | Associated Trucking Inc | new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mseDetails
new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mse | $140,000 |
| May 22, 2015 | Never finaled issued Feb 2018, no final | 137 Marston Av | Proano Construction | new 2/f rear yard addition over (e) living space, new 2nd floor cantilever side addition (add master suite) new sloped driveway/garage and hardscape @ front, enclose (e) 2nd floor recessed porch @ front, new windowsDetails
new 2/f rear yard addition over (e) living space, new 2nd floor cantilever side addition (add master suite) new sloped driveway/garage and hardscape @ front, enclose (e) 2nd floor recessed porch @ front, new windows | $75,000 |
| Apr 14, 2015 | Completed final sign-off Apr 2016 | 67 Melrose Av | E - 5 Construction Inc | legalze (e) bedrm, bath & add fam room, powder rm, laundry rm, stairs @ lower floor. remodel (e) kitchen, dining, bedrms, add bath @ upper floor. exterior work: replace (e) windows, infill under (e) living spacr @ rear, (n) cantilever balcony at rear, new skylights.Details
legalze (e) bedrm, bath & add fam room, powder rm, laundry rm, stairs @ lower floor. remodel (e) kitchen, dining, bedrms, add bath @ upper floor. exterior work: replace (e) windows, infill under (e) living spacr @ rear, (n) cantilever balcony at rear, new skylights. | $120,000 |
| Feb 20, 2015 | Completed final sign-off Sep 2016 | 2770 Lyon St | Ventana 76 | interior remodel only: add laundry room & living space on (e) ground floor, remodel (e) kitchen, remodel (e) bathrooms, replace (e) windows - like for like same size in front, modification to window in rear, n0 expansion to building permitDetails
interior remodel only: add laundry room & living space on (e) ground floor, remodel (e) kitchen, remodel (e) bathrooms, replace (e) windows - like for like same size in front, modification to window in rear, n0 expansion to building permit | $145,000 |
| Oct 15, 2014 | Completed final sign-off Jul 2018 | 1930 47th Av | Grand American Construction Co | new 3rd flr vertical addition. new horizontal rear addition. removeled kitchen, new roof deck @ front, new rear deck. adding living space: 2 new bedrooms, 3 new baths, new den, family, laundry, new breakfast.Details
new 3rd flr vertical addition. new horizontal rear addition. removeled kitchen, new roof deck @ front, new rear deck. adding living space: 2 new bedrooms, 3 new baths, new den, family, laundry, new breakfast. | $200,000 |
| Sep 2, 2014 | Completed final sign-off Nov 2015 | 151 Duncan St | Mcmahon Construction | interior remodel unit 151a; remodel kitchen on 1st floor & new furnace. comply with complaint no. 201039651 item #2.Details
interior remodel unit 151a; remodel kitchen on 1st floor & new furnace. comply with complaint no. 201039651 item #2. | $50,000 |
| Jul 25, 2014 | Completed final sign-off Aug 2015 | 40 Gorham St | Sf Build | interior remodel to ground floor: new stair, bath, laundry, office, media room, skylight, exterior rear doors. no expansion to building envelope. no alteration to front facade. compliance with maher ordinance no. 155-13 not required.Details
interior remodel to ground floor: new stair, bath, laundry, office, media room, skylight, exterior rear doors. no expansion to building envelope. no alteration to front facade. compliance with maher ordinance no. 155-13 not required. | $75,000 |
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 1420 Sutter St | Cci Com'l Constr & Improv**See 985808*** | new structural framing for future roof top mechanical uints. mechanical permit to be submitted separatelyDetails
new structural framing for future roof top mechanical uints. mechanical permit to be submitted separately | $5,000 |
| Jul 1, 2014 | Never finaled issued Jul 2014, no final | 1013 Castro St | Proano Construction | to comply with complaint #201473961; (n) accessory storage shed @ rear yard, projected roof area not exceeding 100 sf ht not exceeding 8' above (e) grade, conc. walls & green roof. rev to approved 201311262946.Details
to comply with complaint #201473961; (n) accessory storage shed @ rear yard, projected roof area not exceeding 100 sf ht not exceeding 8' above (e) grade, conc. walls & green roof. rev to approved 201311262946. | $1,000 |
| Jun 26, 2014 | Never finaled issued Jul 2014, no final | 1577 Treat Av | Proano Construction | revision to app#201401277135. add to project scope: demo and rebuild in kind extg 3 story rear porch. remove nov #201478962Details
revision to app#201401277135. add to project scope: demo and rebuild in kind extg 3 story rear porch. remove nov #201478962 | $3,000 |
| Jun 6, 2014 | Never finaled issued Apr 2015, no final | 1577 Treat Av | Proano Construction | extend (e) rear dormer over (e) stairs w/new skylight. extend (e) rear ridge @ rear of bldg. new rear deck/stairs- replace existing. no change to front facade, no expansion of bldg envelope.Details
extend (e) rear dormer over (e) stairs w/new skylight. extend (e) rear ridge @ rear of bldg. new rear deck/stairs- replace existing. no change to front facade, no expansion of bldg envelope. | $20,000 |
| May 23, 2014 | Completed final sign-off Nov 2014 | 1420 Sutter St | C C I Commercial Construction & Improv | ground floor interior t.i. - demo existing partitions, removal of finishes; addition of partition walls including new ada bathrooms & office facilities. mep under separate permit.Details
ground floor interior t.i. - demo existing partitions, removal of finishes; addition of partition walls including new ada bathrooms & office facilities. mep under separate permit. | $250,000 |
| May 9, 2014 | Completed final sign-off Dec 2014 | 2955 22nd St | Royal Lyon Construction | interior remodel of (e) sunroom @ rear of house, new windows & doors @ rear sunroom, exterior stairs, powder room to full bathroom. no added sq footage, no increase to footprint, no work on front facade.Details
interior remodel of (e) sunroom @ rear of house, new windows & doors @ rear sunroom, exterior stairs, powder room to full bathroom. no added sq footage, no increase to footprint, no work on front facade. | $50,000 |
| Jan 27, 2014 | Completed final sign-off Jan 2017 | 1577 Treat Av | Proano Construction | interior: remodel (e) kitchen, baths, add 1 new bath, new interior stair from garage to living space, new electrical, mech. work, repair (e) garage slab as nec. exterior: replace (e) windows with wood windows, new skylite, remove (e) metal siding/repair, structural upgrade as need.Details
interior: remodel (e) kitchen, baths, add 1 new bath, new interior stair from garage to living space, new electrical, mech. work, repair (e) garage slab as nec. exterior: replace (e) windows with wood windows, new skylite, remove (e) metal siding/repair, structural upgrade as need. | $300,000 |
| Nov 20, 2013 | Completed final sign-off May 2014 | 2424 Green St | new exterior door in front & new entry landing, (4 wood french doors).Details
new exterior door in front & new entry landing, (4 wood french doors). | $7,000 | |
| Jun 12, 2013 | Completed final sign-off Aug 2013 | 713 Monterey Bl | Proano Construction | upgrade to lower level multi purpose room - interior only. replace (e) 3'door at rear facade w/new 3' window. replace (e) roll-up door at rear facade w/new sliderDetails
upgrade to lower level multi purpose room - interior only. replace (e) 3'door at rear facade w/new 3' window. replace (e) roll-up door at rear facade w/new slider | $10,000 |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 314 Walnut St | Rockaway Construction Inc. | interior remodel: remodel (e) baths kitchen, new bath, new stair, new electrical, structural upgrades. exterior improvements: new windows, new skylights, new dormers, new rear stair & wall reduction.Details
interior remodel: remodel (e) baths kitchen, new bath, new stair, new electrical, structural upgrades. exterior improvements: new windows, new skylights, new dormers, new rear stair & wall reduction. | $200,000 |
| Jan 10, 2013 | Never finaled issued Jun 2013, no final | 1013 Castro St | Proano Construction | ground floor infill at rear yard under (e) dining room. new 2 story side addition @ rear yard. new single story deck & spiral stair at rear yard. interior remodel @ ground floor: new bath, bedroom, laundry, family room.Details
ground floor infill at rear yard under (e) dining room. new 2 story side addition @ rear yard. new single story deck & spiral stair at rear yard. interior remodel @ ground floor: new bath, bedroom, laundry, family room. | $50,000 |
| Nov 9, 2012 | Completed final sign-off Mar 2014 | 1164 De Haro St | Cesar Garcia General Contractor Inc | remodel interior - new bathroom / family room on basement floor. new bathroom on garage floor. remodel kitchen & bath on 2nd floor. remodel master suite on 3rdf loor. finishes and reframing as necessary, structure upgrade.Details
remodel interior - new bathroom / family room on basement floor. new bathroom on garage floor. remodel kitchen & bath on 2nd floor. remodel master suite on 3rdf loor. finishes and reframing as necessary, structure upgrade. | $150,000 |
| Sep 28, 2012 | Completed final sign-off May 2013 | 22 Castro St | interior remodel. new home office/bath to existing entry. no add square footage. no change to bldg envelope/facadeDetails
interior remodel. new home office/bath to existing entry. no add square footage. no change to bldg envelope/facade | $25,000 | |
| Sep 7, 2012 | Completed final sign-off Jan 2013 | 835 Howard St | B Bilt Contruction Inc | new interior finishes, new offices, new conference rooms, new break area & new reception. hvac & lighting seperate permitDetails
new interior finishes, new offices, new conference rooms, new break area & new reception. hvac & lighting seperate permit | $60,000 |
| Jul 20, 2012 | Completed final sign-off Apr 2016 | 35 La Grande Av | erect 3 stories, no basement, type 5, single family dwelling building.Details
erect 3 stories, no basement, type 5, single family dwelling building. | $175,000 | |
| May 14, 2012 | Completed final sign-off Mar 2014 | 3340 Clay St | rear single story/lower flr addition. remodel (e) kitchen, rear family room. storage room addition below. no work on upper floors of house, no alteration work to front facade.Details
rear single story/lower flr addition. remodel (e) kitchen, rear family room. storage room addition below. no work on upper floors of house, no alteration work to front facade. | $150,000 | |
| Apr 22, 2011 | Completed final sign-off Apr 2012 | 1013 Castro St | Proano Construction | interior remodel to existing 3rd floor. relocate and add bath, relocate master closet, structural repairs to roof. new dormer skylights, replace windowsDetails
interior remodel to existing 3rd floor. relocate and add bath, relocate master closet, structural repairs to roof. new dormer skylights, replace windows | $50,000 |
| Mar 24, 2011 | Expired or cancelled cancelled Apr 2013 | 850 Greenwich St | to comply w/nov 200786935,deck issue only;legalizing (e) unpermitted roof deck. proposed roof deck to be same size & configuration. new deck to be for exclusive use of upper unit, 854 greenwich. roof deck inaccessible to lower 2 units.Details
to comply w/nov 200786935,deck issue only;legalizing (e) unpermitted roof deck. proposed roof deck to be same size & configuration. new deck to be for exclusive use of upper unit, 854 greenwich. roof deck inaccessible to lower 2 units. | $10,000 | |
| Feb 4, 2011 | Completed final sign-off Nov 2014 | 2807 Clay St | Nova Designs Builds Inc | renovation of interior, horizontal addition to rear of basementand first levels. vertical addition inclusive of additional story and roof deck with penthouse, new exterior stair at rear.Details
renovation of interior, horizontal addition to rear of basementand first levels. vertical addition inclusive of additional story and roof deck with penthouse, new exterior stair at rear. | $500,000 |
| Dec 24, 2010 | Completed final sign-off Jul 2011 | 137 Rivoli St | Bedrock Construction | -foundation repair beneath (e) rear bedroom -new deck over regraded rear yard (new deck less than 30" above grade), new rear door. -new conc. ramp & retaining walls as nec. -no added areas of changes to front facade. -all work at rear of house.Details
-foundation repair beneath (e) rear bedroom -new deck over regraded rear yard (new deck less than 30" above grade), new rear door. -new conc. ramp & retaining walls as nec. -no added areas of changes to front facade. -all work at rear of house. | $40,000 |
| Jun 9, 2010 | Completed final sign-off Aug 2010 | 85 Santa Rita Av | Bliss Construction A Partnership | replace & reconfigure exterior entry stairs.Details
replace & reconfigure exterior entry stairs. | $10,000 |
| Sep 18, 2009 | Completed final sign-off Dec 2009 | 519 10th Av | Cairn Construction | interior remodel of (e) bathroom, replace fixtures, millwork, finishes, elec. no changing of (e) walls, no added sq. footage, no change to bldg footprint/exterior.Details
interior remodel of (e) bathroom, replace fixtures, millwork, finishes, elec. no changing of (e) walls, no added sq. footage, no change to bldg footprint/exterior. | $25,000 |
| Mar 9, 2009 | Completed final sign-off Apr 2009 | 875 Castro St | Cairn Construction | remove (e) handrail & guardrails. replace in kind to local building codes. 4" max space between balusters. new rail height 36" min. will provide gradrail at 34" min. no structural work. new rail to be same material & style as existing.Details
remove (e) handrail & guardrails. replace in kind to local building codes. 4" max space between balusters. new rail height 36" min. will provide gradrail at 34" min. no structural work. new rail to be same material & style as existing. | $4,000 |
| Jan 29, 2009 | Completed final sign-off Dec 2010 | 56 Divisadero St | interior remodel to both units, new added dormers to (e) 4th floor, voluntary structural upgrades/improvements. no increase to bldg footprint, no added sq footage of living spaceDetails
interior remodel to both units, new added dormers to (e) 4th floor, voluntary structural upgrades/improvements. no increase to bldg footprint, no added sq footage of living space | $135,000 | |
| Oct 20, 2008 | Completed final sign-off May 2009 | 1219 06th Av | unit 1221: remodel of 2nd floor kitchen,bath ( create full bath and 1 toilet room) change door swing to deck.Details
unit 1221: remodel of 2nd floor kitchen,bath ( create full bath and 1 toilet room) change door swing to deck. | $30,000 | |
| Aug 8, 2008 | Expired or cancelled expired Mar 2010 | 2640 Leavenworth St | expand scope of work to include: kitchen and bath remodel of each unit, voluntary structural strengthening, replace all windows in kind. comply with 200452917, 200560614, 200684053, 200453113. 200560765Details
expand scope of work to include: kitchen and bath remodel of each unit, voluntary structural strengthening, replace all windows in kind. comply with 200452917, 200560614, 200684053, 200453113. 200560765 | $95,000 | |
| Apr 2, 2008 | Completed final sign-off Dec 2008 | 734 Guerrero St | Bliss Construction A Partnership | new internal stair connecting lower flat to (e) lower office/storage space behind garage; general remodel to lower unit; no added sq ft, no increase to bldg envelope, no facade alteration. remove post and joist and install new wx beam at garage.Details
new internal stair connecting lower flat to (e) lower office/storage space behind garage; general remodel to lower unit; no added sq ft, no increase to bldg envelope, no facade alteration. remove post and joist and install new wx beam at garage. | $80,000 |
| Mar 18, 2008 | Expired or cancelled expired May 2011 | 1925 10th Av | 39 sf horizontal addition at rear lower floors, 93 sf horizontal addition at front upper floor, interior remodel. new kitchen, mstr bathDetails
39 sf horizontal addition at rear lower floors, 93 sf horizontal addition at front upper floor, interior remodel. new kitchen, mstr bath | $90,000 | |
| Mar 11, 2008 | Completed final sign-off Feb 2009 | 39 Rosemont Pl | remodel (e) attic, new dormers at roof per sf planning bulletin 96.2. add new sprinklers to attic only per pre-apps 4/4/08.Details
remodel (e) attic, new dormers at roof per sf planning bulletin 96.2. add new sprinklers to attic only per pre-apps 4/4/08. | $60,000 | |
| Feb 1, 2008 | Expired or cancelled expired May 2011 | 1925 10th Av | interior remodel-new front roof deck, rear foundation work with new rear patio deck. convert basement space to living, infill under (e) bldg overhang at rear.Details
interior remodel-new front roof deck, rear foundation work with new rear patio deck. convert basement space to living, infill under (e) bldg overhang at rear. | $70,000 | |
| Sep 25, 2007 | Completed final sign-off Jul 2008 | 2939 Fillmore St | voluntary seismic upgrade in garage level. new slab & perimeter foundation 2 rear of bldg. minor improvement to extg office space at rear of garage. new steel frame @ garage door. no increase to building envelope.Details
voluntary seismic upgrade in garage level. new slab & perimeter foundation 2 rear of bldg. minor improvement to extg office space at rear of garage. new steel frame @ garage door. no increase to building envelope. | $87,000 | |
| Sep 25, 2007 | Completed final sign-off Oct 2008 | 48 Chenery St | interior remodel to (2) (e) bathrooms. no added sq. footage. no increase to building envelope. no alteratio to buld facade.Details
interior remodel to (2) (e) bathrooms. no added sq. footage. no increase to building envelope. no alteratio to buld facade. | $60,000 | |
| Sep 25, 2007 | Never finaled issued Oct 2007, no final | 470 Hearst Av | interior remodel of (e) kitchen, master bath on upper floor. interior remodel of (e) laundry room and bath on lower floor. side lightwell infill.Details
interior remodel of (e) kitchen, master bath on upper floor. interior remodel of (e) laundry room and bath on lower floor. side lightwell infill. | $60,000 | |
| Sep 4, 2007 | Completed final sign-off Mar 2008 | 226 16th Av | expand garage space by removing corridor. new steel frame, no work on upper floors. no added square footage. no exterior work. no increase to bldg envelope. no alteration to facade.Details
expand garage space by removing corridor. new steel frame, no work on upper floors. no added square footage. no exterior work. no increase to bldg envelope. no alteration to facade. | $50,000 | |
| Sep 4, 2007 | Completed final sign-off Mar 2008 | 1221 06th Av | remodel (e) lower floor behind garage: no added sq footage: no increase to envelope: no change to facade: no work on upper unitDetails
remodel (e) lower floor behind garage: no added sq footage: no increase to envelope: no change to facade: no work on upper unit | $60,000 | |
| Aug 10, 2007 | Completed final sign-off Mar 2008 | 463 Jackson St | "change of use". tenant improvement to existing retail space. change of finishes. upgrade entrance.Details
"change of use". tenant improvement to existing retail space. change of finishes. upgrade entrance. | $90,000 | |
| Jul 2, 2007 | Completed final sign-off Jul 2015 | 426 Eureka St | Mrcc | new rear deck & patio (less than 3' above), remodel (e) basement laundry, no increase to building envelope, no alteration to building st facade, new retaining walls for new patio (rear yard).Details
new rear deck & patio (less than 3' above), remodel (e) basement laundry, no increase to building envelope, no alteration to building st facade, new retaining walls for new patio (rear yard). | $60,000 |
| Apr 11, 2007 | Never finaled issued Apr 2007, no final | 35 Oakwood St | (rear bldg) foundation repair, seismic upgrade w/ shear walls & moment frame for 1st floor only. exterior stair repair / replacement in kind. voluntary seismic work, limited to the 1st story only.Details
(rear bldg) foundation repair, seismic upgrade w/ shear walls & moment frame for 1st floor only. exterior stair repair / replacement in kind. voluntary seismic work, limited to the 1st story only. | $20,000 | |
| Apr 11, 2007 | Completed final sign-off Mar 2011 | 1749 Page St | J L M Construction Inc. | new rear deck stair accessory stair minor remodel, (kitchen, bath) on upper unit. note: scope of work has changes between the the "site" and the "addendum". the side egress stairs are to remain, with no infill.Details
new rear deck stair accessory stair minor remodel, (kitchen, bath) on upper unit. note: scope of work has changes between the the "site" and the "addendum". the side egress stairs are to remain, with no infill. | $95,000 |
| Mar 16, 2007 | Completed final sign-off Apr 2008 | 875 Castro St | addendum permit to approved permit #200615192006. scope is limited to addition of 2 electric wall. heaters in attic and associated t-24 req'tsDetails
addendum permit to approved permit #200615192006. scope is limited to addition of 2 electric wall. heaters in attic and associated t-24 req'ts | ||
| Dec 1, 2006 | Completed final sign-off Dec 2006 | 1119 Greenwich St | revision to appl#200507221839Details
revision to appl#200507221839 | ||
| Oct 20, 2006 | Completed final sign-off Mar 2007 | 3652 22nd St | Proano Construction | remove (2) illegal kitchens on 1st & 3rd floors. no (e) removed, no new walls, no new area added, no work on exterior, no increase to building envelope.Details
remove (2) illegal kitchens on 1st & 3rd floors. no (e) removed, no new walls, no new area added, no work on exterior, no increase to building envelope. | $8,000 |
| Sep 29, 2006 | Completed final sign-off Sep 2007 | 1713 Broderick St | revision to 200605181975 structural revisions to 1) rear roof framing, reinforced e condition, 2) e stair framing, reinforce e conditoin,3) n rear moment frame grade beam reconfigured because of e conditionsDetails
revision to 200605181975 structural revisions to 1) rear roof framing, reinforced e condition, 2) e stair framing, reinforce e conditoin,3) n rear moment frame grade beam reconfigured because of e conditions | $5,000 | |
| Aug 16, 2006 | Completed final sign-off May 2007 | 3739 26th St | foundation/slab repair, lower ground floor infill,lower ground floor general remodel to be future daycare for less than 12 children, partial kitchen/bath interior remodel on upper floor dwelling unit,new front stairs,new/replace reak deck.Details
foundation/slab repair, lower ground floor infill,lower ground floor general remodel to be future daycare for less than 12 children, partial kitchen/bath interior remodel on upper floor dwelling unit,new front stairs,new/replace reak deck. | $100,000 | |
| Jun 8, 2006 | Completed final sign-off Sep 2006 | 4161 23rd St | interior remodel (minor) new driveway opening, & partial removed of non structural wall. kitchen remodel. no added sq. footage. no work on exterior. work limited to unit c, inf only new kitchen.Details
interior remodel (minor) new driveway opening, & partial removed of non structural wall. kitchen remodel. no added sq. footage. no work on exterior. work limited to unit c, inf only new kitchen. | $10,000 | |
| May 26, 2006 | Completed final sign-off Nov 2007 | 137 Marston Av | rear addition. 2 story. scope includes: ground floor: new guest suite, laundry. 2nd floor: new family room.Details
rear addition. 2 story. scope includes: ground floor: new guest suite, laundry. 2nd floor: new family room. | $85,000 | |
| May 19, 2006 | Completed final sign-off Apr 2007 | 875 Castro St | add 3 new dormers per sf planning dept. bulletin 96.2, new bath & remodel in (e) occupied attic, new elec. upgrades in (e) occupied attic. new int. closet & misc. millwork.Details
add 3 new dormers per sf planning dept. bulletin 96.2, new bath & remodel in (e) occupied attic, new elec. upgrades in (e) occupied attic. new int. closet & misc. millwork. | $30,000 | |
| May 18, 2006 | Completed final sign-off Jan 2008 | 1713 Broderick St | interior remodel of (e) upper floor master bedroom, bath & closet, interior remodel of (e) lower bath & eating nook, replace windows on rear facade with new moment frame.Details
interior remodel of (e) upper floor master bedroom, bath & closet, interior remodel of (e) lower bath & eating nook, replace windows on rear facade with new moment frame. | $150,000 | |
| May 2, 2006 | Expired or cancelled expired Sep 2010 | 210 Wawona St | Christian Construction | 2 new skylights, int. remodel of (e) bath, new fixtures, replace damaged front door, bath window, new general lighting, no change in building height. envelope. no add s.f.Details
2 new skylights, int. remodel of (e) bath, new fixtures, replace damaged front door, bath window, new general lighting, no change in building height. envelope. no add s.f. | $50,000 |
| Jul 22, 2005 | Completed final sign-off Dec 2006 | 1119 Greenwich St | interior remodel of existing condo unit - no added area, no change to envelope, ext facades, all worDetails
interior remodel of existing condo unit - no added area, no change to envelope, ext facades, all wor | $60,000 | |
| Jun 9, 2005 | Completed final sign-off Aug 2006 | 1356 Grove St | reframing attic. new drop down access stair to access new attic.furnace for upper unit.Details
reframing attic. new drop down access stair to access new attic.furnace for upper unit. | $7,500 | |
| May 12, 2005 | Completed final sign-off Jul 2005 | 2347 Union St | Cairn Construction | replace in kind (e) rear kecks on 2 upper levels. (e) rear deck non-complaint & rotted. new deckDetails
replace in kind (e) rear kecks on 2 upper levels. (e) rear deck non-complaint & rotted. new deck | $10,000 |
| Nov 18, 2004 | Completed final sign-off Jan 2006 | 1325 10th Av | lower ground floor storage area. new laundry. second floor-new stair to storage below. new bath. re-Details
lower ground floor storage area. new laundry. second floor-new stair to storage below. new bath. re- | $80,000 | |
| Nov 3, 2004 | Completed final sign-off Dec 2004 | 3326 Washington St | rev. to pa#2004/03/16/8762-remove w-2 window (clerestory) on rear stairDetails
rev. to pa#2004/03/16/8762-remove w-2 window (clerestory) on rear stair | ||
| Feb 22, 2002 | Completed final sign-off Aug 2002 | 1049 Howard St | barrier removal only (n) ada entry ramp + stairs. no work on (e) bldg facade or interiorDetails
barrier removal only (n) ada entry ramp + stairs. no work on (e) bldg facade or interior | $7,500 |