Sf Build
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Dec 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 1571 Fulton St | to renew pa# 201705317970 and 201608124948 for final inspection.Details
to renew pa# 201705317970 and 201608124948 for final inspection. | |
| May 14, 2018 | Expired or cancelled expired Aug 2024 | 1509 10th Av | ground flr conversion to habitable space with renovation to (e) second floor and (1) bike space. adding doors and windows to rearDetails
ground flr conversion to habitable space with renovation to (e) second floor and (1) bike space. adding doors and windows to rear | $170,000 |
| Mar 21, 2018 | Expired or cancelled expired Mar 2025 | 1509 10th Av | third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units.Details
third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units. | $100,000 |
| Mar 1, 2018 | Completed final sign-off Jun 2018 | 1575 Fulton St | construct std l shaped (n) concrete footing 12"x12" w/6" stem wall 6" min above grade. with #5 rebar at 12" center. replace existing framing & siding as req. to remediate dryrot. paint to match existing.Details
construct std l shaped (n) concrete footing 12"x12" w/6" stem wall 6" min above grade. with #5 rebar at 12" center. replace existing framing & siding as req. to remediate dryrot. paint to match existing. | $3,000 |
| Jan 11, 2018 | Completed final sign-off Mar 2025 | 1509 10th Av | exploratory demolition (structural) - place bin on street. remove plaster, wall sections & concrete to expose structural elements for visual inspection by structural engineer. 25 sq ft feet total.Details
exploratory demolition (structural) - place bin on street. remove plaster, wall sections & concrete to expose structural elements for visual inspection by structural engineer. 25 sq ft feet total. | $7,500 |
| Oct 2, 2017 | Never finaled issued Oct 2017, no final | 1575 Fulton St | selective replacement of horizontal wood siding and section of foundation at east elevation. no other work. total length of foundation repair is 10 l.f. appropriate siding & framing to also be replaced. replace in kind -Details
selective replacement of horizontal wood siding and section of foundation at east elevation. no other work. total length of foundation repair is 10 l.f. appropriate siding & framing to also be replaced. replace in kind - | $2,500 |
| Dec 22, 2016 | Completed final sign-off Jul 2019 | 1571 Fulton St | repair fire damaged building per attached nov #201699821- replace back stair with full sprinkler system. add habitable space @ ground floor - 2 bedrooms, wet bar, media room, bathroom, add 1 bath on 3rd flr, new bath & office on 4th floor. add dormers per zoning admin admin bulletin# 3.Details
repair fire damaged building per attached nov #201699821- replace back stair with full sprinkler system. add habitable space @ ground floor - 2 bedrooms, wet bar, media room, bathroom, add 1 bath on 3rd flr, new bath & office on 4th floor. add dormers per zoning admin admin bulletin# 3. | $150,000 |
| Nov 18, 2016 | Completed final sign-off Nov 2019 | 1571 Fulton St | replace exisiting brick foundation with new concrete foundation. replace concrete slab at same elevationDetails
replace exisiting brick foundation with new concrete foundation. replace concrete slab at same elevation | $50,000 |
| Aug 12, 2016 | Expired or cancelled expired Jul 2019 | 1571 Fulton St | non-structural expoloration to evaluate magnitude of fire damage to walls floors & ceililngs to comply with nov#201699821.Details
non-structural expoloration to evaluate magnitude of fire damage to walls floors & ceililngs to comply with nov#201699821. | $15,000 |
| Mar 25, 2015 | Completed final sign-off Nov 2015 | 78 Harper St | revision to pa# 201502178534: window replacement at rear porch - larger openings, replace door with french doors. dining room - replace window with french door, rear bedroom - replace (e) window-same sizeDetails
revision to pa# 201502178534: window replacement at rear porch - larger openings, replace door with french doors. dining room - replace window with french door, rear bedroom - replace (e) window-same size | |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 78 Harper St | bath remodel, kitchen remodel, repair (e) sunroom porch, replace windows @ porch, replace doors to rear yard. no walls to be moved, no change of bldg envelope. no change on walls.Details
bath remodel, kitchen remodel, repair (e) sunroom porch, replace windows @ porch, replace doors to rear yard. no walls to be moved, no change of bldg envelope. no change on walls. | $78,000 |
| Feb 10, 2015 | Completed final sign-off Nov 2015 | 2313 Jones St | revision to 201411131376. new footing detail between garage and entryDetails
revision to 201411131376. new footing detail between garage and entry | |
| Jan 13, 2015 | Completed final sign-off Nov 2015 | 2315 Jones St | revision to permit application #2014-1113-1376. new plans with altered layout with alterations to basement: new gyp board, removal of non-brg walls, alteration of wall btwn entry & garage. new fire-rated decor btwn garage & entry.Details
revision to permit application #2014-1113-1376. new plans with altered layout with alterations to basement: new gyp board, removal of non-brg walls, alteration of wall btwn entry & garage. new fire-rated decor btwn garage & entry. | $125,000 |
| Dec 1, 2014 | Completed final sign-off May 2015 | 72 Madrone Av | kitchen remodel. remove partial wall between kitchen and dining room on 2nd levelDetails
kitchen remodel. remove partial wall between kitchen and dining room on 2nd level | $20,000 |
| Nov 13, 2014 | Completed final sign-off Nov 2015 | 2313 Jones St | remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet.Details
remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet. | $125,000 |
| Sep 26, 2014 | Completed final sign-off Nov 2015 | 2701 Folsom St | install new wood beams, posts, concrete footing and slab. repair partial sidewalk. ref bpa#201404233937Details
install new wood beams, posts, concrete footing and slab. repair partial sidewalk. ref bpa#201404233937 | $20,000 |
| Jul 31, 2014 | Completed final sign-off Dec 2014 | 72 Madrone Av | bathroom remodel on 2/f, change galvanized water lines to copper, all bathroom fixtures to be replaced in same location, replace window, same-size, same location, not visible from street, u factor 0.40Details
bathroom remodel on 2/f, change galvanized water lines to copper, all bathroom fixtures to be replaced in same location, replace window, same-size, same location, not visible from street, u factor 0.40 | $8,000 |
| Jul 25, 2014 | Completed final sign-off Aug 2015 | 40 Gorham St | interior remodel to ground floor: new stair, bath, laundry, office, media room, skylight, exterior rear doors. no expansion to building envelope. no alteration to front facade. compliance with maher ordinance no. 155-13 not required.Details
interior remodel to ground floor: new stair, bath, laundry, office, media room, skylight, exterior rear doors. no expansion to building envelope. no alteration to front facade. compliance with maher ordinance no. 155-13 not required. | $75,000 |
| Apr 23, 2014 | Never finaled issued Jul 2014, no final | 2701 Folsom St | install ada compliant ramp. convert office to ada bathroom. install 2 vestibules with fire safety door ***sffd:incomplete scope of work - includes change of use b to a per planning dept commission motion #18958. no lighting change, operable windows to remain.Details
install ada compliant ramp. convert office to ada bathroom. install 2 vestibules with fire safety door ***sffd:incomplete scope of work - includes change of use b to a per planning dept commission motion #18958. no lighting change, operable windows to remain. | $40,000 |