Back to bathroom remodel contractors
Sf Build
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Dec 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 6 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Jul 2019 | 1571 Fulton St | repair fire damaged building per attached nov #201699821- replace back stair with full sprinkler system. add habitable space @ ground floor - 2 bedrooms, wet bar, media room, bathroom, add 1 bath on 3rd flr, new bath & office on 4th floor. add dormers per zoning admin admin bulletin# 3.Details
repair fire damaged building per attached nov #201699821- replace back stair with full sprinkler system. add habitable space @ ground floor - 2 bedrooms, wet bar, media room, bathroom, add 1 bath on 3rd flr, new bath & office on 4th floor. add dormers per zoning admin admin bulletin# 3. | $150,000 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 78 Harper St | bath remodel, kitchen remodel, repair (e) sunroom porch, replace windows @ porch, replace doors to rear yard. no walls to be moved, no change of bldg envelope. no change on walls.Details
bath remodel, kitchen remodel, repair (e) sunroom porch, replace windows @ porch, replace doors to rear yard. no walls to be moved, no change of bldg envelope. no change on walls. | $78,000 |
| Nov 13, 2014 | Completed final sign-off Nov 2015 | 2313 Jones St | remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet.Details
remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet. | $125,000 |
| Jul 31, 2014 | Completed final sign-off Dec 2014 | 72 Madrone Av | bathroom remodel on 2/f, change galvanized water lines to copper, all bathroom fixtures to be replaced in same location, replace window, same-size, same location, not visible from street, u factor 0.40Details
bathroom remodel on 2/f, change galvanized water lines to copper, all bathroom fixtures to be replaced in same location, replace window, same-size, same location, not visible from street, u factor 0.40 | $8,000 |
| Jul 25, 2014 | Completed final sign-off Aug 2015 | 40 Gorham St | interior remodel to ground floor: new stair, bath, laundry, office, media room, skylight, exterior rear doors. no expansion to building envelope. no alteration to front facade. compliance with maher ordinance no. 155-13 not required.Details
interior remodel to ground floor: new stair, bath, laundry, office, media room, skylight, exterior rear doors. no expansion to building envelope. no alteration to front facade. compliance with maher ordinance no. 155-13 not required. | $75,000 |
| Apr 23, 2014 | Never finaled issued Jul 2014, no final | 2701 Folsom St | install ada compliant ramp. convert office to ada bathroom. install 2 vestibules with fire safety door ***sffd:incomplete scope of work - includes change of use b to a per planning dept commission motion #18958. no lighting change, operable windows to remain.Details
install ada compliant ramp. convert office to ada bathroom. install 2 vestibules with fire safety door ***sffd:incomplete scope of work - includes change of use b to a per planning dept commission motion #18958. no lighting change, operable windows to remain. | $40,000 |