Back to kitchen remodel contractors
Sf Build
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Dec 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2018 | Expired or cancelled expired Mar 2025 | 1509 10th Av | third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units.Details
third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units. | $100,000 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 78 Harper St | bath remodel, kitchen remodel, repair (e) sunroom porch, replace windows @ porch, replace doors to rear yard. no walls to be moved, no change of bldg envelope. no change on walls.Details
bath remodel, kitchen remodel, repair (e) sunroom porch, replace windows @ porch, replace doors to rear yard. no walls to be moved, no change of bldg envelope. no change on walls. | $78,000 |
| Dec 1, 2014 | Completed final sign-off May 2015 | 72 Madrone Av | kitchen remodel. remove partial wall between kitchen and dining room on 2nd levelDetails
kitchen remodel. remove partial wall between kitchen and dining room on 2nd level | $20,000 |
| Nov 13, 2014 | Completed final sign-off Nov 2015 | 2313 Jones St | remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet.Details
remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet. | $125,000 |