Sf Build
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Dec 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 5 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2014 | Completed final sign-off Nov 2015 | 2313 Jones St | remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet.Details
remodel kitchen & bath, add bath in bedroom, repair decks at rear at lightwell, new patio doors to (e) deck. convert shower to toilet. | $125,000 |