Block 1184, lot 027
1571 Fulton St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 6 bedrooms, 4 bathrooms
- Building
- 3,230 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 2, 2020 | Completed final sign-off Jan 2020 | 1571 Fulton St | J & C Safety 1st Fire Protection Inc | to obtain final inspection for work approved under pa# 2017-0531-7970. all work is complete.Details
to obtain final inspection for work approved under pa# 2017-0531-7970. all work is complete. | |
| Dec 13, 2019 | Expired or cancelled cancelled Jan 2020 | 1571 Fulton St | Build Sf Inc. | to obtain final inspection for work approved under pa# 200608038465. all work is complete.Details
to obtain final inspection for work approved under pa# 200608038465. all work is complete. | |
| Dec 20, 2018 | Never finaled issued Dec 2018, no final | 1571 Fulton St | street spaceDetails
street space | ||
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 1571 Fulton St | Sf Build | to renew pa# 201705317970 and 201608124948 for final inspection.Details
to renew pa# 201705317970 and 201608124948 for final inspection. | |
| Aug 14, 2018 | Never finaled issued Aug 2018, no final | 1571 Fulton St | street spaceDetails
street space | ||
| May 9, 2018 | Never finaled issued May 2018, no final | 1571 Fulton St | street spaceDetails
street space | ||
| Mar 1, 2018 | Completed final sign-off Jan 2020 | 1571 Fulton St | J & C Safety 1st Fire Protection Inc | as builts ref pa 2017-0531-7970- adding two heads in 2nd floor walk way. underground approved. sprinklers per nfpa 13 and 13rDetails
as builts ref pa 2017-0531-7970- adding two heads in 2nd floor walk way. underground approved. sprinklers per nfpa 13 and 13r | |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 1571 Fulton St | street spaceDetails
street space | ||
| May 31, 2017 | Expired or cancelled expired Jul 2019 | 1571 Fulton St | J & C Safety 1st Fire Protection Inc | installation of new fire sprinkler system and underground. ref pa 2016-1222-5780Details
installation of new fire sprinkler system and underground. ref pa 2016-1222-5780 | $5,300 |
| Feb 21, 2017 | Never finaled issued Feb 2017, no final | 1571 Fulton St | street spaceDetails
street space | ||
| Dec 22, 2016 | Completed final sign-off Jul 2019 | 1571 Fulton St | Sf Build | repair fire damaged building per attached nov #201699821- replace back stair with full sprinkler system. add habitable space @ ground floor - 2 bedrooms, wet bar, media room, bathroom, add 1 bath on 3rd flr, new bath & office on 4th floor. add dormers per zoning admin admin bulletin# 3.Details
repair fire damaged building per attached nov #201699821- replace back stair with full sprinkler system. add habitable space @ ground floor - 2 bedrooms, wet bar, media room, bathroom, add 1 bath on 3rd flr, new bath & office on 4th floor. add dormers per zoning admin admin bulletin# 3. | $150,000 |
| Nov 18, 2016 | Completed final sign-off Nov 2019 | 1571 Fulton St | Sf Build | replace exisiting brick foundation with new concrete foundation. replace concrete slab at same elevationDetails
replace exisiting brick foundation with new concrete foundation. replace concrete slab at same elevation | $50,000 |
| Aug 12, 2016 | Expired or cancelled expired Jul 2019 | 1571 Fulton St | Sf Build | non-structural expoloration to evaluate magnitude of fire damage to walls floors & ceililngs to comply with nov#201699821.Details
non-structural expoloration to evaluate magnitude of fire damage to walls floors & ceililngs to comply with nov#201699821. | $15,000 |
| Aug 3, 2006 | Expired or cancelled cancelled Jan 2020 | 1571 Fulton St | repair back stairs (10 - 15%) not visible from street. to comply with his nov# 200668537 dated 04/28/06.Details
repair back stairs (10 - 15%) not visible from street. to comply with his nov# 200668537 dated 04/28/06. | $2,500 | |
| Nov 15, 2000 | Completed final sign-off Dec 2000 | 1571 Fulton St | install kitchen linoleum replace kitch cab same loca no constr no alt no plumb no elecDetails
install kitchen linoleum replace kitch cab same loca no constr no alt no plumb no elec | $8,000 | |
| Aug 8, 2000 | Completed final sign-off Dec 2000 | 1571 Fulton St | final inspection and approval 99015063Details
final inspection and approval 99015063 | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sf Build (4), J & C Safety 1st Fire Protection Inc (3), Build Sf Inc.
- Architects
- Ernest Selander
- Engineers
- Donald David