Ernie Selander
- License
- C12715
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C12715 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Selander Architects
- Based in
- San Franciswco
- On San Francisco permits
- Jul 2001 to May 2025
175 permits since 2000 (architect on 166 permits, authorized agent-others on 7 permits, engineer on 3 permits, designer on 1 permit): 120 completed, 4 in progress, 25 never finaled, 26 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Mcmahon Construction (11), Eastwood Development Incorporated (7), Norwood Construction (5), Neal T Pauline (4), Ewen Utting Inc. (3), J A P Construction (3), Graham Moore Construction Inc (2), Kingfish Construction Llc. (2), Mitchell Engineering (2), Sunset Builders Llc. (2), A J O Group Build Inc, Ace Drilling & Excavation, Allwood Co, American Builders, Bayward Builders, Bernhardt Remodeling, Bevilacqua & Sons, Beyond The Horizon Construction, Blue Bay Painting Contractor, Cameron Builders Sf, Commins Construction Co, Dave Mason Building, Donald Lewis Gen. Contr.Inc., G B U Construction Development, Genesis Residential Construction, Gil Construction & Assoc Inc., Kunkel Construction, O'dwyer Construction Inc, Old Sod Construction Inc, Phollies Inc, Prosper Construction Dev Inc., Rafael Eduardo Moran, S C P Builders Inc, Sanchez Home Improvement, Sandquist Construction, Spectrum Development Co., Talbco Development Corp Dba Supreme Buil, Tinka Construction, Twin Pinnacles Construction, Western Contractors, Zen Construction
- Architects
- Edward Kaplan
- Engineers
- Michael Hom (13), Mike Hom (6), Albert Urrutia, Justen Peek
Most recent permits
Showing the 100 most recent of 175.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2025 | In progress filed May 2025, not yet issued | 86 Sussex St | reduction in scope to issued bpa# 2022-1027-5297; fire sprinklers are not required and will not be provided for this project.Details
reduction in scope to issued bpa# 2022-1027-5297; fire sprinklers are not required and will not be provided for this project. | ||
| Sep 18, 2024 | Completed final sign-off Nov 2025 | 1533 Newhall St | Tinka Construction | interior: bathroom remodel & closet at 1st fl. exterior: replace primary bedroom window w/ bigger window. (n) conc patio at grade in rear yard; replace (e) decking with (n) decking; add sleepers at rear yard (e)patio; strengthening (e) deckDetails
interior: bathroom remodel & closet at 1st fl. exterior: replace primary bedroom window w/ bigger window. (n) conc patio at grade in rear yard; replace (e) decking with (n) decking; add sleepers at rear yard (e)patio; strengthening (e) deck | $75,000 |
| Jan 24, 2024 | Completed final sign-off Oct 2025 | 315 Holly Park Cr | Norwood Construction | revision to pa# 202110049737, exterior: replace front facade (e) windows in-kind in existing frame. demo (e) shack & stairs between decks, (n) bigger doors to deck @ rear of house. interior: add sink in laundry, move family room wall @ south side 3'-4" from property line. minor revisions to kitchen-Details
revision to pa# 202110049737, exterior: replace front facade (e) windows in-kind in existing frame. demo (e) shack & stairs between decks, (n) bigger doors to deck @ rear of house. interior: add sink in laundry, move family room wall @ south side 3'-4" from property line. minor revisions to kitchen- | $65,000 |
| Dec 21, 2023 | Completed final sign-off Oct 2024 | 257 Brentwood Av | Mcmahon Construction | interior remodel at 2nd floor - remodel kitchen, pantry, and powder room. exterior - replace kitchen window (not street facing-rear).Details
interior remodel at 2nd floor - remodel kitchen, pantry, and powder room. exterior - replace kitchen window (not street facing-rear). | $60,000 |
| Dec 5, 2023 | Completed final sign-off Jun 2025 | 712 10th Av | Cameron Builders Sf | exterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same.Details
exterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same. | $25,000 |
| Nov 17, 2023 | Completed final sign-off Aug 2025 | 3325 Pierce St | Ewen Utting Inc. | interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroomDetails
interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroom | $125,000 |
| Sep 29, 2023 | In progress issued Apr 2024 | 1395 Evans Av | Mitchell Engineering | revision to 202210275308, 201906173524. relocate elevator & reconfigure main stair. revise floor plan. add 2 restrooms. minor interior partition changes.Details
revision to 202210275308, 201906173524. relocate elevator & reconfigure main stair. revise floor plan. add 2 restrooms. minor interior partition changes. | $12,000 |
| Sep 27, 2023 | Completed final sign-off Jun 2025 | 26 Avila St | Ewen Utting Inc. | revison to previous approved permit#202302242589. remodel master bedroom & bathroom @ 3rd flr. add (n) roof deck @ rear, (n) skylight, replace windows @ back of house(not visible from street). minor revisions to ground flr.Details
revison to previous approved permit#202302242589. remodel master bedroom & bathroom @ 3rd flr. add (n) roof deck @ rear, (n) skylight, replace windows @ back of house(not visible from street). minor revisions to ground flr. | $35,000 |
| Aug 31, 2023 | Completed final sign-off Sep 2023 | 145 Industrial St | to comply with accessuble business entrance program per ordinance 51-16. provide accessibility analyses for (e) conditions. no change proposed to (e) conditions. abe# 201903155542. no work for documentation only.Details
to comply with accessuble business entrance program per ordinance 51-16. provide accessibility analyses for (e) conditions. no change proposed to (e) conditions. abe# 201903155542. no work for documentation only. | ||
| Jun 27, 2023 | Expired or cancelled expired Oct 2025 | 163 Carl St | Dave Mason Building | replace dry rotted (e) deck w/ new deck & stairs at reat of house. no work inside houseDetails
replace dry rotted (e) deck w/ new deck & stairs at reat of house. no work inside house | $35,000 |
| May 2, 2023 | Completed final sign-off Nov 2023 | 342 26th Av | Prosper Construction Dev Inc. | replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen.Details
replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen. | $125,000 |
| Apr 28, 2023 | Completed final sign-off Feb 2025 | 462 Kansas St | Norwood Construction | interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen.Details
interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen. | $75,000 |
| Mar 3, 2023 | Completed final sign-off Jun 2025 | 712 10th Av | Graham Moore Construction Inc | revision to pa#202111051910. rearrange entrance lobby, add new exterior door to unit #2. new steps and path at grade at front yard. new curb & decorative fence at extg landscaping. redesign bathrooms layout at 2nd and 3rd floors.Details
revision to pa#202111051910. rearrange entrance lobby, add new exterior door to unit #2. new steps and path at grade at front yard. new curb & decorative fence at extg landscaping. redesign bathrooms layout at 2nd and 3rd floors. | $5,000 |
| Feb 24, 2023 | Completed final sign-off Jun 2025 | 26 Avila St | Ewen Utting Inc. | remodel bathrooms & kitchen at 2nd floor. rebuild interior stairs from 2nd to 3rd floor. (n) interior stairs to 1st floor. develop 634 sf. ft. habitable space at 1st floor: new laundry, guest bedroom, bathroom, family room & office.Details
remodel bathrooms & kitchen at 2nd floor. rebuild interior stairs from 2nd to 3rd floor. (n) interior stairs to 1st floor. develop 634 sf. ft. habitable space at 1st floor: new laundry, guest bedroom, bathroom, family room & office. | $250,000 |
| Jan 30, 2023 | Completed final sign-off Jun 2025 | 712 10th Av | Graham Moore Construction Inc | revision to 202209092180 which was for partial foundation replacement. this permit is replace the remaining portion.Details
revision to 202209092180 which was for partial foundation replacement. this permit is replace the remaining portion. | $15,000 |
| Jan 5, 2023 | Completed final sign-off May 2024 | 1741 16th Av | G B U Construction Development | remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work.Details
remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work. | $25,000 |
| Oct 27, 2022 | Never finaled issued Jul 2023, no final | 1395 Evans Av | Mitchell Engineering | revision to pa 201906173524. add elevator,mech penthouse on roof, add elevator. revise fenestration and roof framing. add exterior exit access stairway. maher n/a.Details
revision to pa 201906173524. add elevator,mech penthouse on roof, add elevator. revise fenestration and roof framing. add exterior exit access stairway. maher n/a. | $35,000 |
| Oct 27, 2022 | In progress issued Mar 2024 | 86 Sussex St | Genesis Residential Construction | to erect a 1-story, 1 adu unit, type vn building, r-3, new adu on the rear yard of existing front building, under state program #65852.2.Details
to erect a 1-story, 1 adu unit, type vn building, r-3, new adu on the rear yard of existing front building, under state program #65852.2. | $60,000 |
| Oct 21, 2022 | Completed final sign-off Mar 2024 | 358 Brannan St | Bevilacqua & Sons | to comply w/city planning complaint #2020088enf, remove storefront & brannan facade, legalize varney place facadeDetails
to comply w/city planning complaint #2020088enf, remove storefront & brannan facade, legalize varney place facade | $8,000 |
| Sep 23, 2022 | Completed final sign-off Sep 2023 | 1336 Shrader St | Mcmahon Construction | replace rear deck and stairs in kind.Details
replace rear deck and stairs in kind. | $25,000 |
| Jun 23, 2022 | Completed final sign-off Aug 2022 | 1937 Hayes St | Old Sod Construction Inc | barrier removal: replace (e) bathroom with (n) ada bathroom in commercial space at 1st fl, for 1937 hayes st.Details
barrier removal: replace (e) bathroom with (n) ada bathroom in commercial space at 1st fl, for 1937 hayes st. | $15,000 |
| Jun 21, 2022 | Expired or cancelled withdrawn Jan 2024 | 719 York St | add interior spiral stair to connect floors. 1st floor add (n) laundry room, finish space and redo slab under deck. add concrete stair to rear yard. add home gym, lower portion of slab appro 6" remove (e) posts replace beams , add new bath, 2nd floor: remodel kitchen, extend into sun room. redo (e)Details
add interior spiral stair to connect floors. 1st floor add (n) laundry room, finish space and redo slab under deck. add concrete stair to rear yard. add home gym, lower portion of slab appro 6" remove (e) posts replace beams , add new bath, 2nd floor: remodel kitchen, extend into sun room. redo (e) | $260,000 | |
| Jun 1, 2022 | Completed final sign-off Dec 2024 | 338 Sanchez St | A J O Group Build Inc | remove (e) rear deck and stair and replace with new. add new spiral stair.Details
remove (e) rear deck and stair and replace with new. add new spiral stair. | $15,000 |
| Apr 18, 2022 | Never finaled filed Apr 2022, never issued | 151 Bernard St | add garage, expand 3rd flr, add roof deck, interior remodelDetails
add garage, expand 3rd flr, add roof deck, interior remodel | $400,000 | |
| Apr 14, 2022 | In progress issued Jul 2024 | 952 Carolina St | partial demolition of existing structure, relocate earthquake shack at front of property, erect new 3-story 2 unit addition over basementDetails
partial demolition of existing structure, relocate earthquake shack at front of property, erect new 3-story 2 unit addition over basement | $600,000 | |
| Apr 5, 2022 | Completed final sign-off Aug 2022 | 25 Baywood Ct | Norwood Construction | revision to pa# 202009265149. update kitchen & laundry layout. (n) door to living area at 1st fl. updated windows & doors schedule. reduce scope of voluntary structural work at 2nd fl. eliminate addition of voluntary structural elements in areas which are not remodeled.Details
revision to pa# 202009265149. update kitchen & laundry layout. (n) door to living area at 1st fl. updated windows & doors schedule. reduce scope of voluntary structural work at 2nd fl. eliminate addition of voluntary structural elements in areas which are not remodeled. | $1,000 |
| Jan 19, 2022 | Never finaled issued Jan 2022, no final | 1900 45th Av | Kingfish Construction Llc. | demo 2nd floor bath and replace like kind. add skylight above staircase.Details
demo 2nd floor bath and replace like kind. add skylight above staircase. | $10,000 |
| Dec 23, 2021 | Completed final sign-off Jun 2022 | 1551 Mckinnon Av | Sunset Builders Llc. | create new corridor in garage area.Details
create new corridor in garage area. | $2,500 |
| Dec 8, 2021 | Completed final sign-off Jun 2023 | 1340 12th Av | Gil Construction & Assoc Inc. | to comply w/ nov #202172338. replace footings & slab @ tradesman alley. repair dryrot as exposed trademan alley. remove & replace exterior slabs on grade at rear of bldg. (n) area drains and lighting.Details
to comply w/ nov #202172338. replace footings & slab @ tradesman alley. repair dryrot as exposed trademan alley. remove & replace exterior slabs on grade at rear of bldg. (n) area drains and lighting. | $15,000 |
| Oct 12, 2021 | Completed final sign-off Jun 2022 | 1551 Mckinnon Av | Sunset Builders Llc. | revision to issued permit 202008313029. interior remodel @ 1st fl: new master bedroom, closet, enlarge (e) bath. revise stair location @ deckDetails
revision to issued permit 202008313029. interior remodel @ 1st fl: new master bedroom, closet, enlarge (e) bath. revise stair location @ deck | $15,000 |
| Oct 4, 2021 | Completed final sign-off Oct 2025 | 315 Holly Park Cr | Norwood Construction | horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom.Details
horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom. | $425,000 |
| Sep 29, 2021 | Never finaled issued Feb 2022, no final | 634 27th Av | Mcmahon Construction | interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet.Details
interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet. | $425,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2023 | 3926 Mission St | Rafael Eduardo Moran | change of use from office space to (n) coffee shop. repaint floors. add mop & prep sinks, new countersDetails
change of use from office space to (n) coffee shop. repaint floors. add mop & prep sinks, new counters | $2,500 |
| May 26, 2021 | Completed final sign-off Feb 2023 | 7 Ord St | Sanchez Home Improvement | new half bath at 1st floor. remodel (e) bathroom and home office at 2nd floor. new skylight.Details
new half bath at 1st floor. remodel (e) bathroom and home office at 2nd floor. new skylight. | $25,000 |
| May 13, 2021 | Never finaled filed May 2021, never issued | 125 Pope St | (n) 3 story addition to rear of (e) 3 story residence. remodel (e) spaces to remain, new stair, new kitchen, & new laundry rooms. house will change from (e) 2 bedroom, 1 office, 2 bathroom to proposed 4 bedroom, 1 office, 4 bathroom.Details
(n) 3 story addition to rear of (e) 3 story residence. remodel (e) spaces to remain, new stair, new kitchen, & new laundry rooms. house will change from (e) 2 bedroom, 1 office, 2 bathroom to proposed 4 bedroom, 1 office, 4 bathroom. | $150,000 | |
| Apr 6, 2021 | Completed final sign-off Mar 2023 | 23 Alta St | Mcmahon Construction | 3rd flr: remove abandoned chimney. reconfigure windows and sliders. add new window at property line.Details
3rd flr: remove abandoned chimney. reconfigure windows and sliders. add new window at property line. | $45,000 |
| Feb 5, 2021 | Expired or cancelled cancelled Jan 2026 | 823 York St | create (n) 1-bedroom unit at ground floor. new kitchen. new half bath. this (e) habitable space was developed under pa# 201505206769. no exterior work.Details
create (n) 1-bedroom unit at ground floor. new kitchen. new half bath. this (e) habitable space was developed under pa# 201505206769. no exterior work. | $15,000 | |
| Feb 5, 2021 | Completed final sign-off Jul 2023 | 2361 Bryant St | Mcmahon Construction | interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights.Details
interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights. | $75,000 |
| Nov 23, 2020 | Completed final sign-off Oct 2021 | 1435 Grant Av | O'dwyer Construction Inc | refinish retail space at basement and 1st flr levels for new tenant. new ada bathroom at basement level. no change of use. no change of occupancy.Details
refinish retail space at basement and 1st flr levels for new tenant. new ada bathroom at basement level. no change of use. no change of occupancy. | $17,500 |
| Nov 12, 2020 | Expired or cancelled cancelled Jan 2026 | 306 Elsie St | Neal T Pauline | revision to pa# 201912240489: add wet bar in family room at first floor.Details
revision to pa# 201912240489: add wet bar in family room at first floor. | $600 |
| Sep 26, 2020 | Completed final sign-off May 2022 | 100 Robinson Dr | American Builders | remodel kitchen. reconfigure interior stairs. new deck at rear.Details
remodel kitchen. reconfigure interior stairs. new deck at rear. | $30,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2022 | 25 Baywood Ct | Zen Construction, Norwood Construction | 1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall.Details
1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall. | |
| Sep 25, 2020 | Completed final sign-off Jul 2022 | 1900 45th Av | Kingfish Construction Llc. | demo interior & exterior stairs , replace w/ 1 stair. develop habitable space on 1st floor.Details
demo interior & exterior stairs , replace w/ 1 stair. develop habitable space on 1st floor. | $40,000 |
| Sep 3, 2020 | Never finaled issued Dec 2021, no final | 2461 Ofarrell St | Western Contractors | erect a three story type v-1 construction two family dwelling building at block 1104, lot 031. reference pa #201609198161 174 terra vista ave.Details
erect a three story type v-1 construction two family dwelling building at block 1104, lot 031. reference pa #201609198161 174 terra vista ave. | $100,000 |
| Feb 27, 2020 | Completed final sign-off Apr 2020 | 354 Los Palmos Dr | Kunkel Construction | new partition in garage, relocate (e) laundry.Details
new partition in garage, relocate (e) laundry. | $5,000 |
| Feb 7, 2020 | Completed final sign-off Jul 2022 | 600 Alvarado St | J A P Construction | new closets at unit 4Details
new closets at unit 4 | $5,000 |
| Feb 5, 2020 | Completed final sign-off Jan 2022 | 600 Alvarado St | J A P Construction | unit 2 - relocate entry door, remove (e) pantry & closet, bathroom & kitchen interior remodelDetails
unit 2 - relocate entry door, remove (e) pantry & closet, bathroom & kitchen interior remodel | $35,000 |
| Jan 30, 2020 | Completed final sign-off Jan 2021 | 600 Alvarado St | J A P Construction | unit #1: relocate entry door, add new closets, kitchen and bathroom interior remodel. new storage in common area at 1st floor.Details
unit #1: relocate entry door, add new closets, kitchen and bathroom interior remodel. new storage in common area at 1st floor. | $25,000 |
| Dec 24, 2019 | Completed final sign-off Dec 2021 | 306 Elsie St | Neal T Pauline | develop habitable space @ existing first floor: new bedroom, new bathroom, new family roomDetails
develop habitable space @ existing first floor: new bedroom, new bathroom, new family room | $50,000 |
| Dec 24, 2019 | Completed final sign-off Mar 2021 | 245 Ewing Tr | Phollies Inc | add new bathroom @ existing unconditioned space of rear of garage. relocate existing laundry. kitchen remodel. new skylightsDetails
add new bathroom @ existing unconditioned space of rear of garage. relocate existing laundry. kitchen remodel. new skylights | $85,000 |
| Dec 4, 2019 | Completed final sign-off Nov 2021 | 164 Evelyn Wy | to obtain final inspection for work approved under pa# 8614990. all work is completeDetails
to obtain final inspection for work approved under pa# 8614990. all work is complete | ||
| Dec 3, 2019 | Expired or cancelled cancelled Jan 2026 | 334 Sweeny St | reconfigure main staircase to create open connections between floors. convert shower to more closet. add vestibule, e closets, full bathroom, bedroom, living rm 1st flDetails
reconfigure main staircase to create open connections between floors. convert shower to more closet. add vestibule, e closets, full bathroom, bedroom, living rm 1st fl | $21,000 | |
| Nov 26, 2019 | Completed final sign-off May 2020 | 368 17th Av | Eastwood Development Incorporated | comply w/ nov# 201992001: replace/rebuild front facade & exterior stairs. work to include new wood windows to replace in kind. rebuild arch detailing in kind that is subject to dry rot, demo, & replace stucco. rebuild upper stairs in woodDetails
comply w/ nov# 201992001: replace/rebuild front facade & exterior stairs. work to include new wood windows to replace in kind. rebuild arch detailing in kind that is subject to dry rot, demo, & replace stucco. rebuild upper stairs in wood | $12,000 |
| Nov 26, 2019 | Completed final sign-off May 2021 | 559 Alvarado St | Ace Drilling & Excavation | relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylightsDetails
relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylights | $600,000 |
| Nov 21, 2019 | Completed final sign-off Jul 2020 | 284 Roosevelt Wy | Eastwood Development Incorporated | revision to app#201802050353. add a.c. to 4th floorDetails
revision to app#201802050353. add a.c. to 4th floor | $10,000 |
| Nov 12, 2019 | Completed final sign-off Oct 2020 | 291 Mangels Av | add bathroom at gr fl in (e) unconditioned space at rear of garageDetails
add bathroom at gr fl in (e) unconditioned space at rear of garage | $10,000 | |
| Oct 23, 2019 | Completed final sign-off Mar 2022 | 180 Cortland Av | revision to pa 2017-0413-3883 s/r2 relocate (e) unit b to 1st fl from 3rd floor (n) layout for unit b to consist of 1 bedroom, 1 bath, 1 office 1 kitchen/living. stucco exterior north & east 1st storyDetails
revision to pa 2017-0413-3883 s/r2 relocate (e) unit b to 1st fl from 3rd floor (n) layout for unit b to consist of 1 bedroom, 1 bath, 1 office 1 kitchen/living. stucco exterior north & east 1st story | ||
| Sep 6, 2019 | Completed final sign-off Dec 2020 | 1533 Newhall St | Bayward Builders | (n) property line windowsDetails
(n) property line windows | $1,000 |
| Aug 8, 2019 | Never finaled filed Aug 2019, never issued | 2215 Lake St | rear addition @ lower two levels, add office, playroom & bathroom at basement level behind garage, remodel kitchen & add family room on level one, extend rear deck on level two, add 4th floor with workout zone, bathroom & roof decks @ fribt & rear.Details
rear addition @ lower two levels, add office, playroom & bathroom at basement level behind garage, remodel kitchen & add family room on level one, extend rear deck on level two, add 4th floor with workout zone, bathroom & roof decks @ fribt & rear. | $300,000 | |
| Jul 31, 2019 | Completed final sign-off Jun 2020 | 151 Juanita Wy | rehabilitate family room. new door and window and finishesDetails
rehabilitate family room. new door and window and finishes | $7,500 | |
| Jul 23, 2019 | Completed final sign-off Nov 2021 | 2670 16th Av | Allwood Co | interior remodel - relocate lightwell, develop habitable space @ basement level. add (n) master bathroom @ 1st floor, relocate (e) bathroom, add half bath @ 2nd floor. remove balcony @ rearDetails
interior remodel - relocate lightwell, develop habitable space @ basement level. add (n) master bathroom @ 1st floor, relocate (e) bathroom, add half bath @ 2nd floor. remove balcony @ rear | $225,000 |
| Jun 19, 2019 | Completed final sign-off Feb 2020 | 91 Winfield St | Spectrum Development Co. | new family room, laundry and bathroom at 1st floor.Details
new family room, laundry and bathroom at 1st floor. | $75,000 |
| Jun 3, 2019 | Completed final sign-off Feb 2020 | 930 Anza St | Mcmahon Construction | replace and enlarge deck at rearDetails
replace and enlarge deck at rear | $5,000 |
| May 16, 2019 | Expired or cancelled cancelled Jan 2026 | 543 Dolores St | add new bathroom at 4th floor. | $20,000 | |
| May 16, 2019 | Never finaled issued Jul 2020, no final | 121 Kensington Wy | (n) kitchen @ 2nd fl. convert 2nd fl into adu per ordinance #95-17Details
(n) kitchen @ 2nd fl. convert 2nd fl into adu per ordinance #95-17 | $50,000 | |
| Apr 5, 2019 | Completed final sign-off May 2019 | 210 Texas St | Bernhardt Remodeling | footing replacement. approx 24 linear feet.Details
footing replacement. approx 24 linear feet. | $10,000 |
| Mar 4, 2019 | Never finaled issued Jul 2020, no final | 480 Magellan Av | convert (e) detached garage into adu per ord #162-16 w/ (n) kitchen, closet, bathroom, sleeping area @ proposed adu.Details
convert (e) detached garage into adu per ord #162-16 w/ (n) kitchen, closet, bathroom, sleeping area @ proposed adu. | $15,000 | |
| Dec 6, 2018 | Completed final sign-off Jul 2019 | 447 14th Av | add new bathroom at 3rd fl, replace cabinets and fixtures i kitchen area at 2nd and 3rd flDetails
add new bathroom at 3rd fl, replace cabinets and fixtures i kitchen area at 2nd and 3rd fl | $20,000 | |
| Dec 4, 2018 | Expired or cancelled expired Jul 2022 | 1533 Newhall St | Donald Lewis Gen. Contr.Inc. | remodel 2nd floor. add stair between floors.Details
remodel 2nd floor. add stair between floors. | $45,000 |
| Sep 25, 2018 | Completed final sign-off Sep 2021 | 306 Elsie St | Neal T Pauline | relocate bathroom at main living floor and remodel bedroom and closet. add interior stair to garage 1st fl. add wall at garage first floor add wall at ground flr to create 2 separate garages. 1 full bath & office at ground flrDetails
relocate bathroom at main living floor and remodel bedroom and closet. add interior stair to garage 1st fl. add wall at garage first floor add wall at ground flr to create 2 separate garages. 1 full bath & office at ground flr | $20,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 257 Brentwood Av | Mcmahon Construction | remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living spaceDetails
remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living space | $45,000 |
| Jul 31, 2018 | Expired or cancelled withdrawn Apr 2022 | 4 Encanto Av | legalize existing unauthorized dwelling unit(4a) per ord# 43-14. a new adu unit under pa# 2018-0726-5631.Details
legalize existing unauthorized dwelling unit(4a) per ord# 43-14. a new adu unit under pa# 2018-0726-5631. | $1,000 | |
| Jul 26, 2018 | Expired or cancelled withdrawn Apr 2022 | 2 Encanto Av | create a new adu (2a) at ground floor. per ordinance #162-16. legalize uou additional permit# 2018-0731-6021.Details
create a new adu (2a) at ground floor. per ordinance #162-16. legalize uou additional permit# 2018-0731-6021. | $10,000 | |
| Jul 10, 2018 | Completed final sign-off May 2020 | 368 17th Av | Eastwood Development Incorporated | rebuild & enclose (e) deck & porches on all three levels.Details
rebuild & enclose (e) deck & porches on all three levels. | $60,000 |
| Jun 14, 2018 | Completed final sign-off Jun 2020 | 368 17th Av | Eastwood Development Incorporated | develop habitable space @ existing 1st fl - office, family room, laundry and bathroom. add interior stairs between 2nd and 1st floor. add half bath @ 2nd fl and full bath at 3rd fl. remodel 2nd and 3rd floorDetails
develop habitable space @ existing 1st fl - office, family room, laundry and bathroom. add interior stairs between 2nd and 1st floor. add half bath @ 2nd fl and full bath at 3rd fl. remodel 2nd and 3rd floor | $300,000 |
| Jun 5, 2018 | Completed final sign-off Dec 2018 | 3236 Sacramento St | Mcmahon Construction | revision to 201805098619 create a new bathroom at second flrDetails
revision to 201805098619 create a new bathroom at second flr | $10,000 |
| Mar 29, 2018 | Completed final sign-off Feb 2021 | 40 Ravenwood Dr | Twin Pinnacles Construction | develop habitable space at (e) basement & first flr & fill in at rear yard. add family room, bedroom, bath, laudnry and officeDetails
develop habitable space at (e) basement & first flr & fill in at rear yard. add family room, bedroom, bath, laudnry and office | $120,000 |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 11 Santa Monica Wy | remodel kitchen and bathroom at first floor maher naDetails
remodel kitchen and bathroom at first floor maher na | $30,000 | |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 2215 Lake St | Sandquist Construction, Mcmahon Construction | remodel 2 bathrooms at 3rd floor; lightwell infill at 3/f; 2 new skylights.Details
remodel 2 bathrooms at 3rd floor; lightwell infill at 3/f; 2 new skylights. | $20,000 |
| Feb 22, 2018 | Never finaled issued May 2022, no final | 2919 Pine St | remodel unit, add bathroom, new foundation and framing (downstairs street level unit)Details
remodel unit, add bathroom, new foundation and framing (downstairs street level unit) | $50,000 | |
| Feb 9, 2018 | Expired or cancelled expired Feb 2026 | 3250 Laguna St | apt #300: comply with 201706251, legalize ~1000 sq ft existing roof deck with pt sleepers and trex decking, to be noncombustible. new guardrailDetails
apt #300: comply with 201706251, legalize ~1000 sq ft existing roof deck with pt sleepers and trex decking, to be noncombustible. new guardrail | $15,000 | |
| Feb 5, 2018 | Completed final sign-off Jul 2020 | 284 Roosevelt Wy | Eastwood Development Incorporated | to erect 3 stories, 1 basement, type v-b, 2 units residential building.Details
to erect 3 stories, 1 basement, type v-b, 2 units residential building. | $25,000 |
| Feb 5, 2018 | Expired or cancelled withdrawn Nov 2018 | 284 Roosevelt Wy | clear complaint# 201603171. complete unfinished structure to create 2 new residential units.Details
clear complaint# 201603171. complete unfinished structure to create 2 new residential units. | $25,000 | |
| Feb 5, 2018 | Completed final sign-off Feb 2019 | 284 Roosevelt Wy | Eastwood Development Incorporated | to demolish 2 story single family dwelling.Details
to demolish 2 story single family dwelling. | $5,000 |
| Dec 15, 2017 | Never finaled filed Dec 2017, never issued | 370 Lexington St | to comply with complaint 2017015608enf which identified trim, an awning, and railing as unpermitted alterations maher naDetails
to comply with complaint 2017015608enf which identified trim, an awning, and railing as unpermitted alterations maher na | $2,000 | |
| Dec 13, 2017 | Completed final sign-off Jan 2022 | 2011 Sacramento St | Talbco Development Corp Dba Supreme Buil | add two new adu's to the rear of the building at ground floor. ordinance 162-16Details
add two new adu's to the rear of the building at ground floor. ordinance 162-16 | $40,000 |
| Nov 20, 2017 | Never finaled issued Jun 2019, no final | 2216 09th Av | horizontal & vertical addition, new bedroom addition over garage, expansion of living room & master bedroom, and kitchen expansion at rear.Details
horizontal & vertical addition, new bedroom addition over garage, expansion of living room & master bedroom, and kitchen expansion at rear. | $150,000 | |
| Nov 14, 2017 | Completed final sign-off Nov 2018 | 137 Prentiss St | renovation to include convert gr level to habitable space. fill in area beneath overhang at rear of bldg as well as reposistion stairs and partition wall on 2nd levelDetails
renovation to include convert gr level to habitable space. fill in area beneath overhang at rear of bldg as well as reposistion stairs and partition wall on 2nd level | $60,000 | |
| Nov 2, 2017 | Never finaled issued May 2018, no final | 543 Dolores St | add half bath, new partition walls, office and relocate laundry at ground floor. add new sliding door @ rear and shower headDetails
add half bath, new partition walls, office and relocate laundry at ground floor. add new sliding door @ rear and shower head | $15,000 | |
| Oct 19, 2017 | Completed final sign-off Oct 2020 | 825 York St | Eastwood Development Incorporated | remodel & add (2) stories to existing 2-story single family dwelling to create two units.Details
remodel & add (2) stories to existing 2-story single family dwelling to create two units. | $350,000 |
| Oct 11, 2017 | Completed final sign-off Oct 2017 | 1181 Valencia St | Neal T Pauline | revision to pa #201303011345 s1: reduction in scope, rear roof unchanged and remains as-is & not be raised as per plans. maher n/a.Details
revision to pa #201303011345 s1: reduction in scope, rear roof unchanged and remains as-is & not be raised as per plans. maher n/a. | |
| Jul 26, 2017 | Never finaled issued Aug 2017, no final | 999 Green St | Blue Bay Painting Contractor | project to isolate existing electrical equipment and meters from exisitng storage with a new 1 hr wall rated wall and door on 16 and 28 floorDetails
project to isolate existing electrical equipment and meters from exisitng storage with a new 1 hr wall rated wall and door on 16 and 28 floor | $8,000 |
| Jul 25, 2017 | Completed final sign-off Feb 2018 | 23 Alta St | Mcmahon Construction | new bedroom, add (n) en suite bath on 2/f, (n) partition wall at guest bedroom closet. (n) desk in guest bedroom & (n) pemko drop seal door at guest bedroom. (n) shelving in new bedroom.Details
new bedroom, add (n) en suite bath on 2/f, (n) partition wall at guest bedroom closet. (n) desk in guest bedroom & (n) pemko drop seal door at guest bedroom. (n) shelving in new bedroom. | $30,000 |
| Jun 27, 2017 | Completed final sign-off Sep 2019 | 1741 16th Av | Mcmahon Construction | addition of new unit on 1st floor. no exterior changes based on state law. to complete the unit a kitchen will be added.Details
addition of new unit on 1st floor. no exterior changes based on state law. to complete the unit a kitchen will be added. | $10,000 |
| May 11, 2017 | Completed final sign-off May 2019 | 1542 Mckinnon Av | new adu. horizontal addition. add new bedroom, living room & bath @ ground floor.Details
new adu. horizontal addition. add new bedroom, living room & bath @ ground floor. | $15,000 | |
| Apr 18, 2017 | Completed final sign-off Jan 2018 | 151 Juanita Wy | Commins Construction Co | remodel 1/f master bedroom & bath, relocate stair between floors.Details
remodel 1/f master bedroom & bath, relocate stair between floors. | $45,000 |
| Mar 8, 2017 | Never finaled filed Mar 2017, never issued | 75 Folsom St | 10th floor: new 1 hour assembly communicating opening between units 1005 and 1006 in non-bearing demising wall. n/a for maher.Details
10th floor: new 1 hour assembly communicating opening between units 1005 and 1006 in non-bearing demising wall. n/a for maher. | $1,500 | |
| Feb 2, 2017 | Completed final sign-off Jan 2018 | 152 Stanyan Bl | Beyond The Horizon Construction | remodel kitchen and add master bath to master bedroomDetails
remodel kitchen and add master bath to master bedroom | $30,000 |
| Jan 31, 2017 | Completed final sign-off Jul 2017 | 1741 16th Av | reconfigure retaining walls and fencing in response to nov 201641951Details
reconfigure retaining walls and fencing in response to nov 201641951 | $5,000 | |
| Jan 17, 2017 | Completed final sign-off Jun 2021 | 300 Flood Av | S C P Builders Inc | vertical & horizontal addition. add 3rd floor master bedroom suite with closet & bath.Details
vertical & horizontal addition. add 3rd floor master bedroom suite with closet & bath. | $150,000 |