Allwood Co
- Based in
- Kentfield
- On San Francisco permits
- Mar 2016 to Feb 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2023 | Completed final sign-off Aug 2023 | 455 Delano Av | refinish existing terrazo steps at front exterior stairs; all work in kind.Details
refinish existing terrazo steps at front exterior stairs; all work in kind. | $12,000 |
| Sep 29, 2022 | Expired or cancelled cancelled Jul 2025 | 326 10th Av | house damage from fire next door. rebuild in kind same as was. replacement of (e) finishes and fixtures affected by fire/water damage. electr/plumbing work as needed. (e) locations to be maintainedDetails
house damage from fire next door. rebuild in kind same as was. replacement of (e) finishes and fixtures affected by fire/water damage. electr/plumbing work as needed. (e) locations to be maintained | $300,000 |
| Jan 19, 2022 | Completed final sign-off Jun 2026 | 146 02nd Av | revision to pa# 202011209430. incentive qualifying voluntary residential soft story seismic upgrade in conformance w/ prescriptive provisions of ch a3 of 2019 cbc to include (n) strong wall system at front facade at 1st fl. (n) seismic bolting + bracing at perimeter foundation.Details
revision to pa# 202011209430. incentive qualifying voluntary residential soft story seismic upgrade in conformance w/ prescriptive provisions of ch a3 of 2019 cbc to include (n) strong wall system at front facade at 1st fl. (n) seismic bolting + bracing at perimeter foundation. | $1,000 |
| Nov 20, 2020 | Expired or cancelled expired Jun 2026 | 146 02nd Av | voluntary residential soft-story seismic upgrade.Details
voluntary residential soft-story seismic upgrade. | $25,000 |
| Jul 23, 2019 | Completed final sign-off Nov 2021 | 2670 16th Av | interior remodel - relocate lightwell, develop habitable space @ basement level. add (n) master bathroom @ 1st floor, relocate (e) bathroom, add half bath @ 2nd floor. remove balcony @ rearDetails
interior remodel - relocate lightwell, develop habitable space @ basement level. add (n) master bathroom @ 1st floor, relocate (e) bathroom, add half bath @ 2nd floor. remove balcony @ rear | $225,000 |
| Jun 22, 2017 | Completed final sign-off Feb 2018 | 3465 Sacramento St | compliance with mandatory seismic retrofit program per 2016 cebc appendix a-4.Details
compliance with mandatory seismic retrofit program per 2016 cebc appendix a-4. | $50,000 |
| Dec 7, 2016 | Completed final sign-off Aug 2018 | 163 17th Av | soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4, adding 2x moment frame, 2x shear wall, relocating (e) window.Details
soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4, adding 2x moment frame, 2x shear wall, relocating (e) window. | $72,000 |
| Mar 22, 2016 | Completed final sign-off Oct 2020 | 815 Pierce St | mandatory retrofit of soft story per sfbc chapter 34b using fema p-807.Details
mandatory retrofit of soft story per sfbc chapter 34b using fema p-807. | $75,000 |