Neal T Pauline
- Based in
- Berkeley
- On San Francisco permits
- Mar 2000 to May 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2023 | Completed final sign-off Aug 2023 | 306 Elsie St | replace kitchen cabinets, countertops, and flooring.Details
replace kitchen cabinets, countertops, and flooring. | $20,000 |
| Nov 12, 2020 | Expired or cancelled cancelled Jan 2026 | 306 Elsie St | revision to pa# 201912240489: add wet bar in family room at first floor.Details
revision to pa# 201912240489: add wet bar in family room at first floor. | $600 |
| Dec 24, 2019 | Completed final sign-off Dec 2021 | 306 Elsie St | develop habitable space @ existing first floor: new bedroom, new bathroom, new family roomDetails
develop habitable space @ existing first floor: new bedroom, new bathroom, new family room | $50,000 |
| Sep 25, 2018 | Completed final sign-off Sep 2021 | 306 Elsie St | relocate bathroom at main living floor and remodel bedroom and closet. add interior stair to garage 1st fl. add wall at garage first floor add wall at ground flr to create 2 separate garages. 1 full bath & office at ground flrDetails
relocate bathroom at main living floor and remodel bedroom and closet. add interior stair to garage 1st fl. add wall at garage first floor add wall at ground flr to create 2 separate garages. 1 full bath & office at ground flr | $20,000 |
| Oct 11, 2017 | Completed final sign-off Oct 2017 | 1181 Valencia St | revision to pa #201303011345 s1: reduction in scope, rear roof unchanged and remains as-is & not be raised as per plans. maher n/a.Details
revision to pa #201303011345 s1: reduction in scope, rear roof unchanged and remains as-is & not be raised as per plans. maher n/a. | |
| Sep 13, 2017 | Completed final sign-off Oct 2017 | 1181 Valencia St | to obtain final inspection for work approved under pa#2015-03-17-1121, 2014-0310-0278 s1. all work is completeDetails
to obtain final inspection for work approved under pa#2015-03-17-1121, 2014-0310-0278 s1. all work is complete | |
| Aug 11, 2016 | Completed final sign-off Oct 2017 | 1181 Valencia St | replace brick foundation at pass through to rear ref pa 2014-0310-0278Details
replace brick foundation at pass through to rear ref pa 2014-0310-0278 | $20,000 |
| Mar 17, 2015 | Expired or cancelled expired Oct 2017 | 1181 Valencia St | new slab on grade & foundation at portion of existing building. n/a for maher.Details
new slab on grade & foundation at portion of existing building. n/a for maher. | $20,000 |
| Aug 19, 2014 | Completed final sign-off Aug 2014 | 2170 Harrison St | to amend bpa 2014-0513-5624 to reflect additional kitchen remodel. replace (e) countertops, sink & range.Details
to amend bpa 2014-0513-5624 to reflect additional kitchen remodel. replace (e) countertops, sink & range. | |
| May 13, 2014 | Completed final sign-off Aug 2014 | 2170 Harrison St | expand bathroom at master bedroom, renovation at existing interior and 1/2 bath. compliance with ordinance no. 155-13 not required.Details
expand bathroom at master bedroom, renovation at existing interior and 1/2 bath. compliance with ordinance no. 155-13 not required. | $50,000 |
| Mar 10, 2014 | Expired or cancelled expired Oct 2017 | 1181 Valencia St | remodel & legalize residential 3rd unit at the ground floor. compliance with ordinance no. 155-13 not required. sprinklers (nfpa-13r for unit, nfpa-13 for garage) on deferred submittal.Details
remodel & legalize residential 3rd unit at the ground floor. compliance with ordinance no. 155-13 not required. sprinklers (nfpa-13r for unit, nfpa-13 for garage) on deferred submittal. | $40,000 |
| Mar 1, 2013 | Completed final sign-off Aug 2013 | 1181 Valencia St | revision to pa# 2012-0921-0347-comply with complaint #201281171-remove abandoned brick chimney (fireplace) in living roomDetails
revision to pa# 2012-0921-0347-comply with complaint #201281171-remove abandoned brick chimney (fireplace) in living room | $1,000 |
| Mar 1, 2013 | Completed final sign-off Oct 2017 | 1181 Valencia St | replace (e) exterior stairs & decks, raise roof & ceiling of (e) 3rd fl bedroom @ rear.Details
replace (e) exterior stairs & decks, raise roof & ceiling of (e) 3rd fl bedroom @ rear. | $35,000 |
| Sep 21, 2012 | Completed final sign-off Aug 2013 | 1181 Valencia St | relocate partition walls and doors for new bathroom + laundry + remodeled bedroom.Details
relocate partition walls and doors for new bathroom + laundry + remodeled bedroom. | $20,000 |
| Dec 9, 2009 | Completed final sign-off May 2010 | 480 Magellan Av | kitchen remodel, new cabs and appliances. open wall to dining rm w/ new header. construct powder rm, reconfigure partition walls on upper floor. remodel master bath. new fixtures and finishes. relocate side window, new window and door at rearDetails
kitchen remodel, new cabs and appliances. open wall to dining rm w/ new header. construct powder rm, reconfigure partition walls on upper floor. remodel master bath. new fixtures and finishes. relocate side window, new window and door at rear | $45,000 |
| Feb 24, 2009 | Completed final sign-off Aug 2009 | 738 Haight St | install gas fireplace in (e) wood burning fireplace in 3rd floor dinning room. run gas & electric to new gas fireplace. new tile at hearth & fireplaceDetails
install gas fireplace in (e) wood burning fireplace in 3rd floor dinning room. run gas & electric to new gas fireplace. new tile at hearth & fireplace | $4,500 |
| May 17, 2005 | Completed final sign-off Oct 2005 | 1322 Hampshire St | kitchen remodel w/study (change dining room to kitchen). new sink in bath.Details
kitchen remodel w/study (change dining room to kitchen). new sink in bath. | $25,000 |
| May 24, 2000 | Completed final sign-off Aug 2000 | 2782 Jackson St | remodel kitchen, replace cab inets, countertops, flooring, dishwasher, fauceDetails
remodel kitchen, replace cab inets, countertops, flooring, dishwasher, fauce | $15,000 |
| Mar 7, 2000 | Expired or cancelled expired Sep 2000 | 399 Moncada Wy | remodel bathroom - bathtub shower, sink vanity, tile floor & wall.Details
remodel bathroom - bathtub shower, sink vanity, tile floor & wall. | $8,500 |