Back to bathroom remodel contractors
Neal T Pauline
- Based in
- Berkeley
- On San Francisco permits
- Mar 2000 to May 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 24, 2019 | Completed final sign-off Dec 2021 | 306 Elsie St | develop habitable space @ existing first floor: new bedroom, new bathroom, new family roomDetails
develop habitable space @ existing first floor: new bedroom, new bathroom, new family room | $50,000 |
| Sep 25, 2018 | Completed final sign-off Sep 2021 | 306 Elsie St | relocate bathroom at main living floor and remodel bedroom and closet. add interior stair to garage 1st fl. add wall at garage first floor add wall at ground flr to create 2 separate garages. 1 full bath & office at ground flrDetails
relocate bathroom at main living floor and remodel bedroom and closet. add interior stair to garage 1st fl. add wall at garage first floor add wall at ground flr to create 2 separate garages. 1 full bath & office at ground flr | $20,000 |
| May 13, 2014 | Completed final sign-off Aug 2014 | 2170 Harrison St | expand bathroom at master bedroom, renovation at existing interior and 1/2 bath. compliance with ordinance no. 155-13 not required.Details
expand bathroom at master bedroom, renovation at existing interior and 1/2 bath. compliance with ordinance no. 155-13 not required. | $50,000 |
| Sep 21, 2012 | Completed final sign-off Aug 2013 | 1181 Valencia St | relocate partition walls and doors for new bathroom + laundry + remodeled bedroom.Details
relocate partition walls and doors for new bathroom + laundry + remodeled bedroom. | $20,000 |
| Dec 9, 2009 | Completed final sign-off May 2010 | 480 Magellan Av | kitchen remodel, new cabs and appliances. open wall to dining rm w/ new header. construct powder rm, reconfigure partition walls on upper floor. remodel master bath. new fixtures and finishes. relocate side window, new window and door at rearDetails
kitchen remodel, new cabs and appliances. open wall to dining rm w/ new header. construct powder rm, reconfigure partition walls on upper floor. remodel master bath. new fixtures and finishes. relocate side window, new window and door at rear | $45,000 |
| May 17, 2005 | Completed final sign-off Oct 2005 | 1322 Hampshire St | kitchen remodel w/study (change dining room to kitchen). new sink in bath.Details
kitchen remodel w/study (change dining room to kitchen). new sink in bath. | $25,000 |
| Mar 7, 2000 | Expired or cancelled expired Sep 2000 | 399 Moncada Wy | remodel bathroom - bathtub shower, sink vanity, tile floor & wall.Details
remodel bathroom - bathtub shower, sink vanity, tile floor & wall. | $8,500 |