Back to kitchen remodel contractors
Neal T Pauline
- Based in
- Berkeley
- On San Francisco permits
- Mar 2000 to May 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2023 | Completed final sign-off Aug 2023 | 306 Elsie St | replace kitchen cabinets, countertops, and flooring.Details
replace kitchen cabinets, countertops, and flooring. | $20,000 |
| Aug 19, 2014 | Completed final sign-off Aug 2014 | 2170 Harrison St | to amend bpa 2014-0513-5624 to reflect additional kitchen remodel. replace (e) countertops, sink & range.Details
to amend bpa 2014-0513-5624 to reflect additional kitchen remodel. replace (e) countertops, sink & range. | |
| Dec 9, 2009 | Completed final sign-off May 2010 | 480 Magellan Av | kitchen remodel, new cabs and appliances. open wall to dining rm w/ new header. construct powder rm, reconfigure partition walls on upper floor. remodel master bath. new fixtures and finishes. relocate side window, new window and door at rearDetails
kitchen remodel, new cabs and appliances. open wall to dining rm w/ new header. construct powder rm, reconfigure partition walls on upper floor. remodel master bath. new fixtures and finishes. relocate side window, new window and door at rear | $45,000 |
| May 17, 2005 | Completed final sign-off Oct 2005 | 1322 Hampshire St | kitchen remodel w/study (change dining room to kitchen). new sink in bath.Details
kitchen remodel w/study (change dining room to kitchen). new sink in bath. | $25,000 |
| May 24, 2000 | Completed final sign-off Aug 2000 | 2782 Jackson St | remodel kitchen, replace cab inets, countertops, flooring, dishwasher, fauceDetails
remodel kitchen, replace cab inets, countertops, flooring, dishwasher, fauce | $15,000 |