How long do building permits take in San Francisco's Potrero Hill neighborhood?

In the Potrero Hill neighborhood of San Francisco, of the 424 building permits filed from October 2025 through September 2026 that have been issued, half were issued within 1 day, up from 0 days a year earlier. Of the 323 permits filed from October 2023 through September 2024 that have reached final sign-off, half did so within 107 days of being issued, down from 137 days the year before.

From the city’s permit records, by the quarter each permit was filed. Data as of 23 November 2026. How to cite this · How this is calculated

How long until a permit is issued, and until final sign-off?

How long building permits take in San Francisco's Potrero HillneighborhoodMedian days from filing to permit issuedMedian days from issue to final sign-offToo recent to judge0501001502002502017201820192020202120222023202420252026DaysSource: San Francisco Department of Building Inspection permit data via DataSF, analysis by Permit Graph(permitgraph.org), CC BY 4.0.www.permitgraph.org/neighborhoods/potrero-hill · Data as of 23 November 2026By the quarter the permit was filed. A median counts only permits that finished the stage, so recent quarterslook faster than they will end up. Gaps: fewer than 5 permits.

This chart as an image (SVG), with its title, source and date, free to embed under CC BY 4.0.

At a glance

StagePermits filedPermits countedMedian daysCounted a year earlierMedian a year earlier
Filed to permit issuedOctober 2025 through September 2026424 issued1478 issued0
Permit issued to final sign-offOctober 2023 through September 2024323 finished107347 finished137

“Counted” is the permits the median was taken over: those filed in the window that have been issued, or that have reached final sign-off. The first stage covers the last four complete quarters, since most permits are issued within the year. The second covers the last four quarters that ended two or more years ago, so that most of their permits have had time to finish. Citywide, the median was 0 days to issue and 99 days from issue to final over the same quarters. See every quarter since 2000.

Every quarter since 2000 (108 quarters)

One row for each quarter in which permits were filed, newest first. To see whether permits are getting faster or slower, read the two median columns down the page; “too recent” quarters have not had time to finish, so their medians run low.

Quarter filedFiledIssuedMedian days to issueSlowest 10%Reached finalMedian days issue to finalSlowest 10%Never finaledSettled
2026-Q4644401530too recent
2026-Q3108880223640740too recent
2026-Q212210393557811310too recent
2026-Q112811914283561570too recent
2025-Q4125114114665672310too recent
2025-Q312811807881692930too recent
2025-Q2127120010983632730too recent
2025-Q1139126112783732880too recent
2024-Q412311408384823600too recent
2024-Q312212003378803560yes
2024-Q2132120074931363570yes
2024-Q1949005477885540yes
2023-Q4107981847511035912yes
2023-Q31601470789710646551yes
2023-Q213712211379213642728yes
2023-Q1106991787910343313yes
2022-Q411310011817920166322yes
2022-Q3146136010710616654625yes
2022-Q214412614018911449134yes
2022-Q112510813058219654921yes
2021-Q412611511018617674027yes
2021-Q31028302036515858120yes
2021-Q215013801079911251437yes
2021-Q112912003278516472629yes
2020-Q4129112262539620286418yes
2020-Q313712841509411250838yes
2020-Q27060102473715496327yes
2020-Q117416001518423477273yes
2019-Q422420709911022276898yes
2019-Q324122506612221086297yes
2019-Q224421805613310983690yes
2019-Q120520004411415797983yes
2018-Q4225209013611812894292yes
2018-Q3207200016410718692990yes
2018-Q222320709111518599185yes
2018-Q119418302159614368281yes
2017-Q41691590608313399470yes
2017-Q322121006210413466995yes
2017-Q21791660888918658075yes
2017-Q1177166019610220089861yes
2016-Q41561400142751471,33758yes
2016-Q317616901359516242665yes
2016-Q215414402049212978951yes
2016-Q118617001491051721,12860yes
2015-Q416115201899324889958yes
2015-Q319017705710415873966yes
2015-Q2161153064991691,05150yes
2015-Q1184175024611914296649yes
2014-Q41641550125881701,12867yes
2014-Q31821720861151841,35654yes
2014-Q2187180025512812671547yes
2014-Q114614109408816894446yes
2013-Q4159156033210813989040yes
2013-Q31771690181236840843yes
2013-Q21861760501148358360yes
2013-Q11211160908611654624yes
2012-Q412612001397213248842yes
2012-Q31301270567910661645yes
2012-Q2130124045839254835yes
2012-Q187860925812253925yes
2011-Q412411701277910558135yes
2011-Q3147141023869052752yes
2011-Q21211150397611759835yes
2011-Q1132127097810439445yes
2010-Q41039601406410872232yes
2010-Q31731630211007438758yes
2010-Q21451410178710757749yes
2010-Q110093028636435128yes
2009-Q4135131063877547737yes
2009-Q31071020356810828833yes
2009-Q21341320111765032850yes
2009-Q11281210107710838139yes
2008-Q41311260107312730744yes
2008-Q315815208796333053yes
2008-Q2154146062768243358yes
2008-Q113512306597933351yes
2007-Q413712201625211528452yes
2007-Q3142136032649646857yes
2007-Q2148145055769238849yes
2007-Q1141140075557034857yes
2006-Q4116113017628627635yes
2006-Q3153149069697534639yes
2006-Q2142140050768828039yes
2006-Q1134130051689434140yes
2005-Q41331320135811435153yes
2005-Q31451420467312342241yes
2005-Q21401350536911742040yes
2005-Q11361290507012043838yes
2004-Q4142141066728428839yes
2004-Q3160149023729055250yes
2004-Q21551520368912545549yes
2004-Q11721680100938230453yes
2003-Q41701660128937445736yes
2003-Q32011950631107436855yes
2003-Q21461420165889734728yes
2003-Q11131110146637024220yes
2002-Q413513003066311836230yes
2002-Q3172163082847834435yes
2002-Q217616901191046627712yes
2002-Q112411905658843579yes
2001-Q410510207161913603yes
2001-Q31211160110521214372yes
2001-Q21601560142861444584yes
2001-Q11391350234741128167yes
2000-Q41351280113631185521yes
2000-Q31671590156841495474yes
2000-Q21761680221981214613yes
2000-Q11361230148581538742yes

A blank median means fewer than 5 permits behind it: issued permits for the first stage, and for the second, finished permits whose final is dated after their issue (a permit never issued has no span). “Slowest 10%” is the 90th percentile: one permit in ten took at least this long. Download the table as CSV or JSON; both carry the source, license and data date.

What the numbers leave out

4,158 of the 15,938 building permits filed since 2000 (26%) have no final sign-off 3 years after they were issued or, if never issued, filed. A median over finished permits understates the real wait: the permits that never finish are not in it. Citywide, 803 of 803,269 permits since 2000 (0%) name no neighborhood and count in the city's figures only. Inspection records are not yet included: “final sign-off” is the city’s own completion date on the permit.

Project types in San Francisco's Potrero Hill neighborhood

Shown apart, with their own page here: bathroom remodel (1,786 filed, 1,243 finished; contractors); kitchen remodel (1,485 filed, 1,016 finished; contractors); stairs (1,136 filed, 720 finished; contractors); deck (757 filed, 511 finished; contractors); roof deck (192 filed, 119 finished; contractors). Other types: 12,071 permits.

What was filed here, by building use

Of 2,512 permits filed in the Potrero Hill neighborhood of San Francisco from October 2021 through September 2026, the largest building uses were two-family buildings (29.1%), single-family homes (27.3%) and apartment buildings (19.3%); 0.6% had no use on record.

What was filed in San Francisco's Potrero Hill neighborhood,by building useTwo-family buildings: 732 permits (29.1%)Single-family homes: 685 permits (27.3%)Apartment buildings: 484 permits (19.3%)Offices: 177 permits (7.0%)Industrial and storage: 122 permits (4.9%)Food and drink: 89 permits (3.5%)Everything else: 223 permits (8.9%)Two-family buildings732 · 29.1%Single-family homes685 · 27.3%Apartment buildings484 · 19.3%Offices177 · 7.0%Industrial and storage122 · 4.9%Food and drink89 · 3.5%Everything else223 · 8.9%Source: San Francisco Department of Building Inspection permit data via DataSF, analysis by Permit Graph(permitgraph.org), CC BY 4.0.www.permitgraph.org/neighborhoods/potrero-hill · Data as of 23 November 20262,512 permits filed October 2021 through September 2026, by the building use the city wrote on the permit. Withnone, the assessor's class for the parcel where it names a home; otherwise "No use on record".

This chart as an image (SVG) and the numbers as CSV, with the source and date, free to reuse under CC BY 4.0. The sentence names the largest groups that have a name; the table also lists the catch-all groups. The building use is the one the city wrote on the permit; with none, the assessor’s class for the parcel where it names a home. Residential hotels are counted with hotels.

Building usePermits filedShare
Two-family buildings73229.1%
Single-family homes68527.3%
Apartment buildings48419.3%
Offices1777.0%
Industrial and storage1224.9%
Food and drink893.5%
Other uses742.9%
Health, schools and assembly612.4%
Retail and services471.9%
Parking and vacant lots241.0%
No use on record150.6%
Hotels20.1%

What was filed here, by project type

Of 2,512 permits filed in the Potrero Hill neighborhood of San Francisco from October 2021 through September 2026, 71.7% matched none of the project types this site names. The most common types were bathroom remodel (7.8% of all permits), kitchen remodel (4.2%) and stairs (3.0%); 9.6% matched more than one type.

What was filed in San Francisco's Potrero Hill neighborhood,by project typeMore than one typeMore than one type: 240 permits (9.6%)240 · 9.6%Bathroom remodelBathroom remodel: 197 permits (7.8%)197 · 7.8%Kitchen remodelKitchen remodel: 106 permits (4.2%)106 · 4.2%StairsStairs: 76 permits (3.0%)76 · 3.0%DeckDeck: 69 permits (2.7%)69 · 2.7%Roof deckRoof deck: 21 permits (0.8%)21 · 0.8%Other typesOther types: 2 permits (0.1%)2 · 0.1%1,801 of 2,512 permits (71.7%) matched none of the project types this site names; they are not drawn as a bar.Source: San Francisco Department of Building Inspection permit data via DataSF, analysis by Permit Graph(permitgraph.org), CC BY 4.0.www.permitgraph.org/neighborhoods/potrero-hill · Data as of 23 November 20262,512 permits filed October 2021 through September 2026, by the project type the site's keyword rules read inthe permit's description. A permit with several types is one bar, "More than one type".

This chart as an image (SVG) and the numbers as CSV, with the source and date, free to reuse under CC BY 4.0. The sentence names the largest groups that have a name; the table also lists the catch-all groups. The project type is what this site’s keyword rules read in the permit’s description, so most permits match none of the types named here; a permit that matches several is counted once, as “more than one type”.

Project typePermits filedShare
No type matched1,80171.7%
More than one type2409.6%
Bathroom remodel1977.8%
Kitchen remodel1064.2%
Stairs763.0%
Deck692.7%
Roof deck210.8%
Other types20.1%

Nearby neighborhoods

Mission Bay, Mission, South of Market; all of San Francisco; every neighborhood compared.

How this is calculated

Approved means the city issued the permit: the permit’s issue date. The first stage counts days from the filing date to the issue date, over permits issued on or after they were filed.

Final sign-off means the city’s own status for the permit is “complete”, with its completion date; this site does not yet read inspection records, so the inspection date is not a separate stage. The second stage counts days from the issue date to the completion date, over permits that have reached it.

Permits are grouped by the quarter they were filed. A quarter’s median counts only its permits that have finished the stage, so recent quarters look faster than they will end up: their slow permits have not finished yet. Quarters that ended two or more years ago are marked settled; the rest are shaded in the chart. The headline’s first stage uses the last four complete quarters; its second uses the last four settled quarters.

The median is the middle permit: half took less, half more. It shows how long a typical permit took: half of the permits that finished did so faster, and a few that took years do not pull it up the way they would an average. It leaves out permits that never finished, so treat it as a floor, not a promise. The slowest 10% is the 90th percentile. A median needs at least 5 permits behind it, or it is left out. A project type is shown apart within a neighborhood only when it has 30 or more finished permits there; the rest are “other types”.

Never finaled means no final sign-off three years after the permit was issued (or filed, if never issued), and not expired, cancelled, withdrawn, revoked, disapproved, denied or suspended (the site’s “expired or cancelled” outcome). About a quarter of permits citywide end this way; often the work was done and nobody called for the final inspection. These permits are in the counts and not in the medians.

A permit’s neighborhood is the Analysis Neighborhood the city writes on the permit record (the official set of 41). Permits with none are counted citywide only; the page says how many. “Nearby” neighborhoods are the three nearest by the center of their permits. The site reloads the city’s data every night; permits filed since 1 January 2000 are included. The placement of a permit, its dates and its status are the city’s; the grouping and the words are this site’s. How to read these records.