Back to bathroom remodel contractors
Us Construction California, Inc
- Based in
- Greenbrae
- On San Francisco permits
- Nov 2016 to Apr 2021
- Last 24 months
- 0 permits filed
75 permits since 2000: 51 completed, 21 never finaled, 3 expired or cancelled.
Of the 21 never-finaled permits, 21 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 32 completed, 13 never finaled. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2020 | Never finaled issued Feb 2021, no final | 555 Buena Vista West Av | revision to pa# 202002114120. change to unit #205 only-move walls. bathroom and kitchen locations swap.Details
revision to pa# 202002114120. change to unit #205 only-move walls. bathroom and kitchen locations swap. | $130,000 |
| Nov 18, 2020 | Completed final sign-off May 2021 | 3201 Octavia St | unit 301: renovation. new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical, exterior, fire alarm or sprinkler.Details
unit 301: renovation. new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical, exterior, fire alarm or sprinkler. | $65,000 |
| Feb 11, 2020 | Completed final sign-off May 2021 | 555 Buena Vista Tr | renovation of 2 apts - units 106 on 1st fl & unit 205 on 2nd fl. new bedrooms & bath, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. no structural.Details
renovation of 2 apts - units 106 on 1st fl & unit 205 on 2nd fl. new bedrooms & bath, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. no structural. | $135,000 |
| Feb 4, 2020 | Completed final sign-off May 2021 | 3201 Octavia St | unit# 103: remodel kitchen and bathroom at units 103 on 2nd floor. new counter, cabinets and plumbing fixgtures in kind. new tiles, vanity and fixutres in kind. no change to mechanical no exterior work. no fire alarm, sprinkler. no structural work under this permit.Details
unit# 103: remodel kitchen and bathroom at units 103 on 2nd floor. new counter, cabinets and plumbing fixgtures in kind. new tiles, vanity and fixutres in kind. no change to mechanical no exterior work. no fire alarm, sprinkler. no structural work under this permit. | $11,000 |
| Jan 9, 2020 | Completed final sign-off May 2021 | 3201 Octavia St | unit 303, 4th fl - new bedrooms and bathrooms. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinklerDetails
unit 303, 4th fl - new bedrooms and bathrooms. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler | $65,000 |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 3099 Washington St | unit 2, 3 and 10 - remodel of kitchen & bathrooms replace counters, cabinets, fixtures & appliances in-kind. replace (e) dishwashers & washer/dryers w/(n) models in (e) locations. all bathrooms 35 sf each. all kitchen = 70 sf eachDetails
unit 2, 3 and 10 - remodel of kitchen & bathrooms replace counters, cabinets, fixtures & appliances in-kind. replace (e) dishwashers & washer/dryers w/(n) models in (e) locations. all bathrooms 35 sf each. all kitchen = 70 sf each | $65,000 |
| Sep 12, 2019 | Never finaled issued Nov 2019, no final | 1637 Sacramento St | apt 7 - new kitchen, bathroom & bedroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler.Details
apt 7 - new kitchen, bathroom & bedroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler. | $65,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2020 | 930 Post St | reno of 1 apt unit 6 on 2nd flr - new kitchen, bathroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structralDetails
reno of 1 apt unit 6 on 2nd flr - new kitchen, bathroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structral | $65,000 |
| Sep 10, 2019 | Completed final sign-off Feb 2020 | 2425 Buchanan St | remodel kitchen 4x8 and bath 5x6,new washer dryer,ventless under cabinet, kitch cabinets, new bath fixt, new tub, sink sink vanilty, new elec subpanel, vinyl planking over e floor, no structural, no outside workDetails
remodel kitchen 4x8 and bath 5x6,new washer dryer,ventless under cabinet, kitch cabinets, new bath fixt, new tub, sink sink vanilty, new elec subpanel, vinyl planking over e floor, no structural, no outside work | $34,000 |
| Aug 21, 2019 | Completed final sign-off Oct 2019 | 530 Stockton St | unit 207 & 304: kitchen & bath remodel. new kitchen cabinets, bath fixtuers, flooring. bath sq ft approx 30. kitchen sq ft approx 48. nol alteratiion of walls.Details
unit 207 & 304: kitchen & bath remodel. new kitchen cabinets, bath fixtuers, flooring. bath sq ft approx 30. kitchen sq ft approx 48. nol alteratiion of walls. | $37,000 |
| Aug 15, 2019 | Completed final sign-off Feb 2020 | 2425 Buchanan St | unit 203, 3rd fl - new kitchen cabinets and plubming fixtures, new bathroom. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler or structural workDetails
unit 203, 3rd fl - new kitchen cabinets and plubming fixtures, new bathroom. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler or structural work | $65,000 |
| Aug 15, 2019 | Completed final sign-off Feb 2020 | 1985 Fulton St | reno of 1 apt unit 203 on 2nd flr - new kitchen, bedrooms, bathroom, d/w, w/d, plm fixtures. no chage to mech. no ext work. no fa or sprinkler work no structural. new lighting at (e) j-box locationsDetails
reno of 1 apt unit 203 on 2nd flr - new kitchen, bedrooms, bathroom, d/w, w/d, plm fixtures. no chage to mech. no ext work. no fa or sprinkler work no structural. new lighting at (e) j-box locations | $65,000 |
| Aug 6, 2019 | Completed final sign-off Nov 2020 | 930 Post St | renovation of 5 apartments: 02//05/08/20/21. unit 2 on 1st fl, 5 and 8 on 2nd floor, 20 and 21 on 3rd fl. new bedrooms and baths. new kitchen cabinets, plumbing fixtures. new washer/dryers. new lighting at e j boxes. no change to mech. no exterior fire alarm, sprinkler or structural work.Details
renovation of 5 apartments: 02//05/08/20/21. unit 2 on 1st fl, 5 and 8 on 2nd floor, 20 and 21 on 3rd fl. new bedrooms and baths. new kitchen cabinets, plumbing fixtures. new washer/dryers. new lighting at e j boxes. no change to mech. no exterior fire alarm, sprinkler or structural work. | $300,000 |
| Jul 1, 2019 | Completed final sign-off Nov 2021 | 3201 Octavia St | reno. of 9 units: 101,102,103 on 2nd floor; 201,202,203,204 on 3rd fl. units 302 & 304 on 4th fl. nw bedrooms, bathrooms, kitchen cabnets. nw plmg fixtures, nw lighting at extg j-box locations. nw dishwashers, washers/dryers. no change to mech, exterior work, fire alarm or sprinkler work. n/a maherDetails
reno. of 9 units: 101,102,103 on 2nd floor; 201,202,203,204 on 3rd fl. units 302 & 304 on 4th fl. nw bedrooms, bathrooms, kitchen cabnets. nw plmg fixtures, nw lighting at extg j-box locations. nw dishwashers, washers/dryers. no change to mech, exterior work, fire alarm or sprinkler work. n/a maher | $540,000 |
| Apr 26, 2019 | Completed final sign-off Oct 2019 | 530 Stockton St | unit 308 & 505: remodel kitchens & baths, kitchen approx 4'x8', bath approx 5'x6'Details
unit 308 & 505: remodel kitchens & baths, kitchen approx 4'x8', bath approx 5'x6' | $37,000 |
| Apr 26, 2019 | Completed final sign-off Sep 2019 | 1555 Chestnut St | unit 1: remodel kitchen & bath, refresh floor, paint/patch drywall, subpanel no exterior work, kitchen approx 10'x10', bath approx 5'x8'Details
unit 1: remodel kitchen & bath, refresh floor, paint/patch drywall, subpanel no exterior work, kitchen approx 10'x10', bath approx 5'x8' | $30,000 |
| Apr 5, 2019 | Never finaled issued May 2019, no final | 810 Eddy St | conversions for studios to 1 bedrm for 201,303,405,406,507,604. new bathroom in 405. all units - new kitchen cabinets, plumbing fixtures. lighting @ (e) jbox locations, dishwashers, w/d. no: change to mech, ext, fire alarm, sprinklers or structuralDetails
conversions for studios to 1 bedrm for 201,303,405,406,507,604. new bathroom in 405. all units - new kitchen cabinets, plumbing fixtures. lighting @ (e) jbox locations, dishwashers, w/d. no: change to mech, ext, fire alarm, sprinklers or structural | $360,000 |
| Feb 27, 2019 | Completed final sign-off Jun 2019 | 530 Stockton St | units 104 and 508: remodel kitchen and bathroom. install new electrical subpanel.Details
units 104 and 508: remodel kitchen and bathroom. install new electrical subpanel. | $36,000 |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 1637 Sacramento St | unit# 8 kitchen & bath remodel, replace (3) light fixts, replace kitchen cabinets, bath fixts, add washer/dryer. all in-kind. n/a for maher.Details
unit# 8 kitchen & bath remodel, replace (3) light fixts, replace kitchen cabinets, bath fixts, add washer/dryer. all in-kind. n/a for maher. | $36,837 |
| Jan 11, 2019 | Completed final sign-off Jun 2019 | 530 Stockton St | units 406 and 605 kitchen and bath remodel, replace kitchen cabinets and bath fixtures, add washer and dryer, replace existing light fixtures. all in kind.Details
units 406 and 605 kitchen and bath remodel, replace kitchen cabinets and bath fixtures, add washer and dryer, replace existing light fixtures. all in kind. | $40,000 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 530 Stockton St | kitchen bath remodel, replace existing light fixtures. no structural, no outside work.Details
kitchen bath remodel, replace existing light fixtures. no structural, no outside work. | $40,000 |
| Nov 14, 2018 | Completed final sign-off Jun 2019 | 1740 Sacramento St | kitchen and bath remodel, add washer, dryer no structural, no outside work.Details
kitchen and bath remodel, add washer, dryer no structural, no outside work. | $30,000 |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 1575 Sacramento St | unit #11: renovation of 3rd floor: new kitchen,new bathroom, new plmbg fixtures, nw lighting, add washer and dryer, add dishwasher. no exterior work. no structural work. no fire alarm or sprinkler work.Details
unit #11: renovation of 3rd floor: new kitchen,new bathroom, new plmbg fixtures, nw lighting, add washer and dryer, add dishwasher. no exterior work. no structural work. no fire alarm or sprinkler work. | $35,000 |
| Jul 26, 2018 | Completed final sign-off Jan 2019 | 530 Stockton St | kitchen and bathroom remodel, new cabinets, sinks, toilets. no walls moved.Details
kitchen and bathroom remodel, new cabinets, sinks, toilets. no walls moved. | $33,000 |
| May 31, 2018 | Never finaled issued Aug 2018, no final | 726 Fillmore St | renovation of one unit #10 on 1st floor. replace kitchen and bath fixtures. new dishwasher and washer dryer. no work visible from street. n fire alarm or sprinkler work.Details
renovation of one unit #10 on 1st floor. replace kitchen and bath fixtures. new dishwasher and washer dryer. no work visible from street. n fire alarm or sprinkler work. | $65,000 |
| May 17, 2018 | Never finaled issued Jul 2018, no final | 1433 Clay St | unit 11, 3rd fl - demo of non-structural walls. new bedroom, kitchen cabinets, plumbing fixtures, lighting & electrical. new dishwasher & washer/dryer. no structural. no change to mech. no exterior work. no fire alarm or sprinklers work. remodel (e) bath, add new bath.Details
unit 11, 3rd fl - demo of non-structural walls. new bedroom, kitchen cabinets, plumbing fixtures, lighting & electrical. new dishwasher & washer/dryer. no structural. no change to mech. no exterior work. no fire alarm or sprinklers work. remodel (e) bath, add new bath. | $10,000 |
| May 4, 2018 | Completed final sign-off Aug 2018 | 1637 Sacramento St | unit #2: kitchen cabinets replaced, replace tub, toilet & sink, replace existing lighting, retile bath, replace in kind stove. maher naDetails
unit #2: kitchen cabinets replaced, replace tub, toilet & sink, replace existing lighting, retile bath, replace in kind stove. maher na | $35,000 |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 1330 Union St | unit 20: kitchen & bath remodel, replace cabinets, bath fixtures, no exterior work, no structural work, no walls changed.Details
unit 20: kitchen & bath remodel, replace cabinets, bath fixtures, no exterior work, no structural work, no walls changed. | $35,000 |
| Apr 20, 2018 | Completed final sign-off Dec 2018 | 1555 Chestnut St | unit 23: kitchen & bath remodel, replace cabinets & bath fixtures, no exterior work, no structural work, no walls changed.Details
unit 23: kitchen & bath remodel, replace cabinets & bath fixtures, no exterior work, no structural work, no walls changed. | $35,000 |
| Mar 22, 2018 | Completed final sign-off Sep 2018 | 3099 Washington St | unit #11: kitchen and bath remodel, new subpanel, kitchen cabinets, bath fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
unit #11: kitchen and bath remodel, new subpanel, kitchen cabinets, bath fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $35,000 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 1290 Grove St | interior renovation of 6 extg apartments. units 103 and 106 on 1st floor, unit 306 on 3rd floor, unit 404 on 4th floor, units 601 and 603 on 6th floor. new kitchen and bath fixtures, new washer/dryers and dishwashers.Details
interior renovation of 6 extg apartments. units 103 and 106 on 1st floor, unit 306 on 3rd floor, unit 404 on 4th floor, units 601 and 603 on 6th floor. new kitchen and bath fixtures, new washer/dryers and dishwashers. | $300,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 224 Haight St | unit #2: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/aDetails
unit #2: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/a | $40,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 220 Haight St | unit #1: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/aDetails
unit #1: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, maher n/a | $35,000 |
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 1 Scott St | unit #4: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification,Details
unit #4: kitchen and bathroom remodel. replace kitchen cabinets, bath fixtures, install subpanel, no exterior work. no structural work. no wall modification, | $35,000 |
| Jan 30, 2018 | Completed final sign-off Aug 2018 | 1223 Laguna St | #1225. remodel kitchen & bath, new cabinets & fixtures, add closet in bedroom, add dishwasher. no rough framing and / or change of (e) layout.Details
#1225. remodel kitchen & bath, new cabinets & fixtures, add closet in bedroom, add dishwasher. no rough framing and / or change of (e) layout. | $38,000 |
| Jan 26, 2018 | Completed final sign-off Jun 2018 | 1575 Sacramento St | work in unit #9: kitchen and bath remodel, tile floor, new fixturesDetails
work in unit #9: kitchen and bath remodel, tile floor, new fixtures | $40,000 |
| Jan 24, 2018 | Completed final sign-off Jun 2018 | 2425 Buchanan St | unit#101 remodel kitchen & bath. n/a for maher.Details
unit#101 remodel kitchen & bath. n/a for maher. | $30,000 |
| Jan 24, 2018 | Completed final sign-off Aug 2018 | 1637 Sacramento St | unit#5 remodel kitchen & bath, replace cabinets, sinks, tub, etc. kitchen bath floor tile. repair walls. n/a for maher.Details
unit#5 remodel kitchen & bath, replace cabinets, sinks, tub, etc. kitchen bath floor tile. repair walls. n/a for maher. | $34,000 |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 1740 Sacramento St | unit #2: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063Details
unit #2: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063 | $20,000 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 726 Fillmore St | unit 2. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc.Details
unit 2. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc. | $85,000 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 726 Fillmore St | unit 3. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc.Details
unit 3. remodel ktichen & bathroom with new cabinets, tile, sinks, electrical, etc. | $20,000 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 1740 Sacramento St | unit #7: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063Details
unit #7: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a. to comply with complaint #201833063 | $20,000 |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 1740 Sacramento St | unit #1: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a.to comply with complaint #201833063Details
unit #1: remodel kitchen & bathroom, replace cabinets, tile, sinks, etc. maher n/a.to comply with complaint #201833063 | $80,000 |
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 201 Divisadero St | unit#201 retile kitchen & bath floors. replace kitchen & bath countertop. n/a for maher.Details
unit#201 retile kitchen & bath floors. replace kitchen & bath countertop. n/a for maher. | $15,000 |
| Jun 21, 2017 | Completed final sign-off May 2019 | 930 Post St | unit 1: kitchen & bathroom remodelDetails
unit 1: kitchen & bathroom remodel | $35,000 |