Back to bathroom remodel contractors
The Toboni Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2026
- Last 24 months
- 48 permits filed
270 permits since 2000: 194 completed, 46 in progress, 18 never finaled, 12 expired or cancelled.
Of the 18 never-finaled permits, 5 are 3 to 5 years old, 8 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
56 bathroom remodel permits: 45 completed, 6 in progress, 2 never finaled, 3 expired or cancelled. Typically 20 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 2206 Lake St | 3rd floor bathroom in kind renovation, patch + paint, add bookshelves. waterproofing @ rear deck (less than 50%) non-visible from st. replace finishes @ kitchen 1st fl.Details
3rd floor bathroom in kind renovation, patch + paint, add bookshelves. waterproofing @ rear deck (less than 50%) non-visible from st. replace finishes @ kitchen 1st fl. | $100,000 |
| Feb 24, 2026 | In progress issued Feb 2026 | 3701 Washington St | bathroom update: replacing bathroom fixtures & light fixtures.Details
bathroom update: replacing bathroom fixtures & light fixtures. | $700,000 |
| Aug 26, 2025 | In progress issued Sep 2025 | 1601 Monterey Bl | dry rot and minor assbestos removal/remediation at mechanical room, kitchen hood, bath fans, and furnace ducting.Details
dry rot and minor assbestos removal/remediation at mechanical room, kitchen hood, bath fans, and furnace ducting. | $2,000 |
| Jul 17, 2025 | Completed final sign-off Jun 2026 | 3447 Clay St | revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f.Details
revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f. | $10,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 540 El Camino Del Mar | subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade.Details
subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade. | $15,000 |
| May 22, 2025 | In progress issued Jun 2025 | 540 El Camino Del Mar | remodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced.Details
remodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced. | $250,000 |
| May 9, 2025 | Completed final sign-off Dec 2025 | 207 Cherry St | remodel of (e) 2/f bathrooms and primary closet. no added sqft or changes to (e) exteriror envelope. no mechanical work in scope, electrical modification as required by code.Details
remodel of (e) 2/f bathrooms and primary closet. no added sqft or changes to (e) exteriror envelope. no mechanical work in scope, electrical modification as required by code. | $25,000 |
| Jan 29, 2025 | Completed final sign-off Mar 2025 | 663 Marina Bl | intallation of new cabinets at primary closet and bathroom(level 2). level 2 bathroom will be converted to additional closet space. existing plumbing lines will be shut off and capped.Details
intallation of new cabinets at primary closet and bathroom(level 2). level 2 bathroom will be converted to additional closet space. existing plumbing lines will be shut off and capped. | $30,000 |
| Jan 9, 2025 | Completed final sign-off Aug 2025 | 2747 Vallejo St | replace finishes in kitchen and bathroom, no change to any mep locations. all fixtures location to remain, replace tiles, stone, and refinish cabinets.Details
replace finishes in kitchen and bathroom, no change to any mep locations. all fixtures location to remain, replace tiles, stone, and refinish cabinets. | $500,000 |
| Dec 24, 2024 | In progress issued May 2025 | 3575 Clay St | new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical.Details
new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical. | $850,000 |
| Nov 18, 2024 | Completed final sign-off Jun 2026 | 3447 Clay St | interior remodel within existing building footprint, new exterior doors and 35 sf. insfill at east exterior 1st level facade. to include kitchen and 5 bath remodel, structural.Details
interior remodel within existing building footprint, new exterior doors and 35 sf. insfill at east exterior 1st level facade. to include kitchen and 5 bath remodel, structural. | $450,000 |
| Mar 13, 2024 | Completed final sign-off Feb 2025 | 294 Page St | interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair.Details
interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair. | $10,000 |
| May 15, 2023 | Completed final sign-off May 2023 | 1291 03rd Av | revision to clarify scope of pa# 202304105385: ground floor until 1291 bath remodel in kind only. 1289 second floor bathroom remodel, replace plumbing fixtures and new lighting. no kitchen work anywhere.Details
revision to clarify scope of pa# 202304105385: ground floor until 1291 bath remodel in kind only. 1289 second floor bathroom remodel, replace plumbing fixtures and new lighting. no kitchen work anywhere. | |
| Apr 10, 2023 | Completed final sign-off May 2023 | 1291 03rd Av | 1st floor bathroom remodel- 2nd floor fixtures replacement. kitchen and bathroom remodel. no structural work.Details
1st floor bathroom remodel- 2nd floor fixtures replacement. kitchen and bathroom remodel. no structural work. | $2,500 |
| Apr 6, 2023 | Completed final sign-off May 2024 | 2210 Vallejo St | remodel of existing fixtures and finishes of kitchen, laundry, and primary bathroom. replacement in kind of lighting. new flooring throughout.Details
remodel of existing fixtures and finishes of kitchen, laundry, and primary bathroom. replacement in kind of lighting. new flooring throughout. | $150,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry doorDetails
main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry door | $2,400,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures.Details
existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures. | $200,000 |
| Oct 6, 2021 | Completed final sign-off Aug 2022 | 2700 Pierce St | interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kindDetails
interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kind | $200,000 |
| Feb 5, 2021 | Completed final sign-off Jan 2026 | 2900 Broadway | interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls.Details
interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls. | $1,500,000 |
| Nov 8, 2019 | Completed final sign-off Mar 2020 | 2701 Pacific Av | replace finishes and fixtures in one 2nd fl. bathroom, 7 foot by 10 foot room, no walls being alteredDetails
replace finishes and fixtures in one 2nd fl. bathroom, 7 foot by 10 foot room, no walls being altered | $11,000 |
| Aug 6, 2019 | Completed final sign-off Oct 2021 | 2640 Broderick St | replace in-kind front facade windows, front door and garage door. (n) stucco. interior remodel within (e) bldg. (n) bath at ground flr, 2 (n) skylights. replace deck finishes and add (n) glass guardrail to meet code.Details
replace in-kind front facade windows, front door and garage door. (n) stucco. interior remodel within (e) bldg. (n) bath at ground flr, 2 (n) skylights. replace deck finishes and add (n) glass guardrail to meet code. | $300,000 |
| Jun 19, 2019 | Completed final sign-off Jan 2021 | 2720 Pierce St | interior remodel including associated structural work. work to include new layout to 1st & 3rd fls, with new baths & bedrooms. new stairs connecting 1st & 2nd fl.Details
interior remodel including associated structural work. work to include new layout to 1st & 3rd fls, with new baths & bedrooms. new stairs connecting 1st & 2nd fl. | $1,100,000 |
| Feb 1, 2019 | Completed final sign-off Aug 2019 | 15 Presidio Tr | interior kitchen and bath remodel, per plans. maher n/a.Details
interior kitchen and bath remodel, per plans. maher n/a. | $45,000 |
| Nov 28, 2018 | Completed final sign-off Dec 2020 | 2747 Vallejo St | windows, doors & finishes @ rear facade, interior remodel of the 3 & 4 flrs with associated structural work remodel of (e) family rm kitchen &didint rm, on 3rd flr remodel of (e) master suite bedroom & bathroom on 4th flr addition of elevator from garage to 4th flrDetails
windows, doors & finishes @ rear facade, interior remodel of the 3 & 4 flrs with associated structural work remodel of (e) family rm kitchen &didint rm, on 3rd flr remodel of (e) master suite bedroom & bathroom on 4th flr addition of elevator from garage to 4th flr | $500,000 |
| Apr 20, 2018 | Completed final sign-off Jan 2019 | 294 Page St | revision to 201712206941 to include attic remodel. remodel to include media room, full bath, play roomDetails
revision to 201712206941 to include attic remodel. remodel to include media room, full bath, play room | $5,000 |
| Sep 11, 2017 | Completed final sign-off Jul 2023 | 2720 Lyon St | interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairsDetails
interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairs | $300,000 |
| Aug 17, 2017 | Completed final sign-off Dec 2019 | 76 San Rafael Wy | new rear yard addition, addition of conditioned space at basement. interior remodel to include kitchen and additional (3) baths and (1) powder room.Details
new rear yard addition, addition of conditioned space at basement. interior remodel to include kitchen and additional (3) baths and (1) powder room. | $295,000 |
| Jul 12, 2017 | Completed final sign-off Apr 2019 | 2829 Divisadero St | remodel of (e) attic: four new dormers and new rear-facing deck at attic level. new bathroom, finishes and fixtures. includes associated structural work. maher naDetails
remodel of (e) attic: four new dormers and new rear-facing deck at attic level. new bathroom, finishes and fixtures. includes associated structural work. maher na | $190,000 |
| Feb 21, 2017 | Completed final sign-off Dec 2017 | 126 18th Av | revision to 201307091398 - renovate of (e) sfd - revise 1st flr: layout to include (n) medica room, revise 3rd flr: layout to eliminate 1(n) bath & add 1 (n) laundrt - revise 4th flr layout to include (n) wet bar; (n) nfpa13r sprinkler throughout (under separate permit).Details
revision to 201307091398 - renovate of (e) sfd - revise 1st flr: layout to include (n) medica room, revise 3rd flr: layout to eliminate 1(n) bath & add 1 (n) laundrt - revise 4th flr layout to include (n) wet bar; (n) nfpa13r sprinkler throughout (under separate permit). | |
| Oct 6, 2016 | Completed final sign-off Apr 2019 | 330 Twin Peaks Bl | renovation of an (e) 3 story home. addition of 4th floor, rear expansion & interior renovation. add 2 bed & 2 bath.Details
renovation of an (e) 3 story home. addition of 4th floor, rear expansion & interior renovation. add 2 bed & 2 bath. | $550,000 |
| Sep 13, 2016 | Completed final sign-off Jun 2019 | 775 Page St | add unit per ord 30-15. convert (e) storage into (n) 525 sq ft unit with 1 kitchen, 1 bath, 1 bedroom, 1 living room.Details
add unit per ord 30-15. convert (e) storage into (n) 525 sq ft unit with 1 kitchen, 1 bath, 1 bedroom, 1 living room. | $50,000 |
| Aug 6, 2015 | Completed final sign-off Feb 2016 | 3140 Clay St | kitchen remodel, bathroom remodel, new lighting & other. cosmetic work. no changes to layout, walls or openings. no structural work.Details
kitchen remodel, bathroom remodel, new lighting & other. cosmetic work. no changes to layout, walls or openings. no structural work. | $150,000 |
| Apr 3, 2015 | Completed final sign-off Apr 2019 | 2829 Divisadero St | 3-story rear addition, widening garage door & driveway. interior remodel & associated structural work. interior includes removal of some walls, remodel bath, bedroom, elevator, kitchen & enlarge kitchen.Details
3-story rear addition, widening garage door & driveway. interior remodel & associated structural work. interior includes removal of some walls, remodel bath, bedroom, elevator, kitchen & enlarge kitchen. | $460,000 |
| Mar 9, 2015 | Expired or cancelled cancelled Nov 2016 | 566 Kansas St | remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building.Details
remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building. | $235,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2016 | 2951 Pine St | new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door.Details
new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door. | $480,000 |
| Jan 5, 2015 | Completed final sign-off Apr 2015 | 2200 Sacramento St | #205 - remodel kitchen & 1 & 1/2 bathrooms plus misc work. no structural or exterior work. no work to windows or doors. n/a maher ordinanceDetails
#205 - remodel kitchen & 1 & 1/2 bathrooms plus misc work. no structural or exterior work. no work to windows or doors. n/a maher ordinance | $48,000 |
| Dec 30, 2014 | Completed final sign-off Dec 2016 | 350 15th Av | add (1) bedroom unit & garage @ basement level & family room @ rear of building on 1st level. unit includes (1) kitchen & (1) bath.Details
add (1) bedroom unit & garage @ basement level & family room @ rear of building on 1st level. unit includes (1) kitchen & (1) bath. | $98,000 |
| Aug 12, 2014 | Expired or cancelled expired Jun 2018 | 611 Marina Bl | revision to 201312134202 to revise 2 window sizes at kitchen and 1 window at master bath. primary facade window enlarge. new window to be wood with stucco to match existing. 3/f & master bathrooms modified. bathroom, toilet moved, shower decreased & vanities moved. bath tub size increased, shower &Details
revision to 201312134202 to revise 2 window sizes at kitchen and 1 window at master bath. primary facade window enlarge. new window to be wood with stucco to match existing. 3/f & master bathrooms modified. bathroom, toilet moved, shower decreased & vanities moved. bath tub size increased, shower & | |
| Jan 31, 2014 | Completed final sign-off May 2015 | 3385 Jackson St | revision to permit #201312103794 remodel at 4/f with new terace, 2 new baths, remodel 1/2 bath, new doors and windows, new fire escape, extend stairs and elevator to new roof deck and mis improvementsDetails
revision to permit #201312103794 remodel at 4/f with new terace, 2 new baths, remodel 1/2 bath, new doors and windows, new fire escape, extend stairs and elevator to new roof deck and mis improvements | $145,000 |
| Dec 13, 2013 | Expired or cancelled expired Jun 2018 | 611 Marina Bl | horizontal addition at second floor kitchen, interior remodel work at kitchen, master bathroom and bathroom at third floor. all window replacement units to be wood sash.-maher- compliance with ordinance no. 155-13.not required.Details
horizontal addition at second floor kitchen, interior remodel work at kitchen, master bathroom and bathroom at third floor. all window replacement units to be wood sash.-maher- compliance with ordinance no. 155-13.not required. | $95,000 |
| Dec 10, 2013 | Completed final sign-off May 2015 | 3385 Jackson St | remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement.Details
remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement. | $250,000 |
| Sep 13, 2013 | Completed final sign-off May 2015 | 3385 Jackson St | remove & replace (e) sheetrock at all floors as required w/ 5/8" type "x" gypsum board; no structural work, update finishes and fixtures in kitchen and 5 1/2 baths; no exterior work; to comply with cec 150(k) 8 & 10.Details
remove & replace (e) sheetrock at all floors as required w/ 5/8" type "x" gypsum board; no structural work, update finishes and fixtures in kitchen and 5 1/2 baths; no exterior work; to comply with cec 150(k) 8 & 10. | $85,000 |
| Apr 18, 2012 | Completed final sign-off Jan 2013 | 2340 Washington St | kitchen remodel, new elevator, remodel 3 baths and 2 powder rooms, new spa, media room and wine cellar at basement.Details
kitchen remodel, new elevator, remodel 3 baths and 2 powder rooms, new spa, media room and wine cellar at basement. | $130,000 |
| Apr 6, 2012 | Completed final sign-off Nov 2013 | 2601 Broadway | remodel two bathrooms on 3rd floor, repair finishes in entry, new lighting at living room (lights on dimmer). no wall relocation. (e) bathroom fans to remain. (n) he lighting in bathrooms.Details
remodel two bathrooms on 3rd floor, repair finishes in entry, new lighting at living room (lights on dimmer). no wall relocation. (e) bathroom fans to remain. (n) he lighting in bathrooms. | $25,000 |
| Dec 9, 2011 | Completed final sign-off Mar 2013 | 1650 Chestnut St | shore existing structure and remove and replace foundaton elements only. no other alterations. to document removal of e kitchen and bath at gr fl. ref app 201112070249Details
shore existing structure and remove and replace foundaton elements only. no other alterations. to document removal of e kitchen and bath at gr fl. ref app 201112070249 | $40,000 |
| Dec 7, 2011 | Completed final sign-off Mar 2013 | 1650 Chestnut St | kitchen and 2 bath remodel, new cabinets and finishes, no structural workDetails
kitchen and 2 bath remodel, new cabinets and finishes, no structural work | $30,000 |
| Dec 7, 2011 | Completed final sign-off Jan 2013 | 2340 Washington St | kitchen and 4 bath remodel, new cabinets and finishes, no structural workDetails
kitchen and 4 bath remodel, new cabinets and finishes, no structural work | $60,000 |
| Dec 6, 2011 | Completed final sign-off Feb 2012 | 1998 Broadway | kitchen & 1 bathroom remodel-new cabinets & finishes. no structural workDetails
kitchen & 1 bathroom remodel-new cabinets & finishes. no structural work | $35,000 |
| Mar 4, 2011 | Completed final sign-off May 2011 | 2729 Filbert St | new kitchen cabinets, appliances, counter tops. new bath tile and fixtures.Details
new kitchen cabinets, appliances, counter tops. new bath tile and fixtures. | $30,000 |
| Mar 4, 2011 | Completed final sign-off Apr 2011 | 590 Junipero Serra Bl | demo debris/minor reframe/dry wall/ bath tile and fixtures, lighting, hvac and paint. no structural work.Details
demo debris/minor reframe/dry wall/ bath tile and fixtures, lighting, hvac and paint. no structural work. | $60,000 |
| Jun 4, 2010 | Completed final sign-off Oct 2011 | 2507 Pacific Av | interior remodel at all levels incl. renovation of kitchen and 4 1/2 bathrooms, add new elevator and relocate staircaseDetails
interior remodel at all levels incl. renovation of kitchen and 4 1/2 bathrooms, add new elevator and relocate staircase | $340,000 |
| Apr 23, 2010 | Completed final sign-off Oct 2011 | 2507 Pacific Av | add garage, addition at rear, remodel kitchen & 4-1/2 bathrooms & misc. improvements.Details
add garage, addition at rear, remodel kitchen & 4-1/2 bathrooms & misc. improvements. | $390,000 |
| Nov 30, 2009 | Completed final sign-off Dec 2010 | 2838 Polk St | rebuild existing staircase at lightwell, addition at existing lightwell, new bay window at front facade, new stair & landing at rear, remodel (2) kitchens & (2) baths, add (2) baths, new dual glazed wood windows, misc improvement.Details
rebuild existing staircase at lightwell, addition at existing lightwell, new bay window at front facade, new stair & landing at rear, remodel (2) kitchens & (2) baths, add (2) baths, new dual glazed wood windows, misc improvement. | $360,000 |
| Jun 18, 2008 | Completed final sign-off Nov 2008 | 3875 Clay St | excavate the rear of ex. garage to create a two car garage, new family rm, bath, new interior stair connecting 2nd flr, storage and relocate ex. water heater. reposition ex. furnance and reconnect to ex. flue.Details
excavate the rear of ex. garage to create a two car garage, new family rm, bath, new interior stair connecting 2nd flr, storage and relocate ex. water heater. reposition ex. furnance and reconnect to ex. flue. | $125,000 |
| Apr 26, 2006 | Completed final sign-off Apr 2006 | 36 Palm Av | legalize rec room and bathroom at garage levelDetails
legalize rec room and bathroom at garage level | $44,000 |
| Oct 5, 2005 | Completed final sign-off Nov 2006 | 461 Frederick St | to remove non structural & drywall,kitchen cabinet,sink,bathroom fixtures.drywall removal about 20%of all (e) walls.Details
to remove non structural & drywall,kitchen cabinet,sink,bathroom fixtures.drywall removal about 20%of all (e) walls. | $10,000 |